Copying scheduled data
If you would like to enter a new item on a different date that has the same or similar content to a previously scheduled item, you may save time by copying the previous entry onto the new date using the copy function and editing it later if required.
The copy function operates similarly to the edit mode, instead of pressing
For example, if the “ABC Project meeting” scheduled on February 20 is also to be held at the same time on March 6, you may copy it onto the new date as follows:
1. Recall the items scheduled for February 20 and enter the edit mode.
[SCHEDULE ] [=I
piiFq I-Em-j
2.Change the date. m 03 06
03/06/1992
lO:OOAM- 2:OOPM
ABC Project4 meeting
E D I T
(You can also change the entire date by pressing mj
3.Copy the data. piiFq
FRI 3/ 6/'92
10 : OOAM- 2 : OOPM
ABC Project meeting
4 1