Sterling Plumbing 822.00247.00 specifications Second Pump Setup Screen

Page 25

Second Pump Setup Screen

Once the settings have been entered into the initial Pump Setup Screen, press F3 to access the next set of configurable pump settings. The second pump setup screen (Figure 11) will be shown.

Figure 11: Second Pump Setup Screen

This screen will allow you to set the following features:

•CLEAN PULSES – This is the number of blowback/implosion pulses allowed during filter cleaning. This value can be set between 1 and 99.

•ON PULSE- This feature allows you to set the amount of time that the blowback/implosion pulse will remain on during filter cleaning. This value can be set between 0.1 and 99.9 seconds.

•OFF PULSE- This feature allows you to set the amount of time in between blowback/implosion pulses during filter cleaning. This value can be set between 0.1 and 99.9 seconds.

Once the values have been entered for the settings listed above, the operator can choose to do the following:

•Turn the pump On or Off (Press F1 while in this screen)

•Enter additional values for this pump in the third setup screen (Press F3).

•Return to the Main Menu (Press F6).

1 –Pump 9-Station Controller

Chapter 3: Installation

24 of 38

Image 25
Contents SCC 1-Pump 9-Station Controller Parts and Service Department Unpacking and Inspection Shipping InformationEvent of Shipping Damage If the Shipment is Not CompleteReturns Warranty ReturnsCredit Returns Table of Contents Configurable Settings How to Use This Manual SafetySafety Symbols Used in this Manual Controller Safety Tags Description Wear Safety Glasses and Work Gloves General Responsibility ResponsibilityReporting a Safety Defect Maintenance ResponsibilityOperator Responsibility Models Covered in This Manual Functional DescriptionGeneral Description Mechanical Features Standard FeaturesElectrical Features Controller FeaturesSafety Devices and Interlocks Optional FeaturesSafety Circuit Standards Fail Safe OperationSafety Device Lock-Outs Making Control Panel Power Drop Wiring Connections InstallationUncrating Mounting the Control PanelConnecting the Control Panel to the Pump Package Connecting the Control Panel to Vacuum HoppersBasic Menus and Setup of Controller SetupActivating and Deactivating the System Name Description Viewing System StatusInitial Station Setup Screen Station SetupController Keypad Entering Values Into Controller FieldsSecond Station Setup Screen Third Station Setup Screen Initial Pump Setup Screen Pump SetupSecond Pump Setup Screen Third Pump Setup Screen Initial System Setup Screen System SetupThird System Setup Screen Second System Setup ScreenOperation AlarmsOverview Starting and Stopping the SystemGeneral Fault Pump FaultAll Faults Filter CanMaintenance Options for Station Setup Configurable SettingsOptions for Pump Setup General Troubleshooting TroubleshootingPump Alarms Station AlarmsWarranty Specifications WarrantyWarranty Restrictions AppendixOptional Components Warranty LiabilitiesCustomer Responsibilities Spare Parts List Drawings and DiagramsTechnical Assistance Contact Information Controller Identification Serial Number Tag