Sterling Plumbing 822.00247.00 specifications Third Pump Setup Screen

Page 26

Third Pump Setup Screen

Once the settings have been entered into the second Pump Setup Screen, press F3 to access the next set of configurable pump settings. The third pump setup screen (Figure 12) will be shown.

Figure 12: Third Pump Setup Screen

This screen will allow you to set the following features:

•RAMP UP TIME- This is the delay in seconds from when the pump starts till the conveying system starts. This value can be entered between 1 and 99.

•RAMP DN TIME- This is the delay in seconds from when the pump stops till the next time the pump starts again. This value can be entered between 1 and 99.

Note: There must be sufficient time for the motor to completely stop before starting again.

•IDLE TIME- This is the delay in seconds from when the pump last conveyed material till the pump stops. This value can be entered between 1 and 999.

Once the values have been entered for the settings listed above, the operator can choose to do the following:

•Turn the pump On or Off (Press F1 while in this screen)

•Return to the initial setup screen to review settings or make additional changes (Press F3).

•Return to the Main Menu (Press F6).

1 –Pump 9-Station Controller

Chapter 3: Installation

25 of 38

Image 26
Contents SCC 1-Pump 9-Station Controller Parts and Service Department Event of Shipping Damage Shipping InformationUnpacking and Inspection If the Shipment is Not CompleteCredit Returns Warranty ReturnsReturns Table of Contents Configurable Settings Safety Symbols Used in this Manual SafetyHow to Use This Manual Controller Safety Tags Description Wear Safety Glasses and Work Gloves Responsibility General ResponsibilityOperator Responsibility Maintenance ResponsibilityReporting a Safety Defect General Description Functional DescriptionModels Covered in This Manual Electrical Features Standard FeaturesMechanical Features Controller FeaturesSafety Circuit Standards Optional FeaturesSafety Devices and Interlocks Fail Safe OperationSafety Device Lock-Outs Uncrating InstallationMaking Control Panel Power Drop Wiring Connections Mounting the Control PanelConnecting the Control Panel to Vacuum Hoppers Connecting the Control Panel to the Pump PackageActivating and Deactivating the System SetupBasic Menus and Setup of Controller Viewing System Status Name DescriptionStation Setup Initial Station Setup ScreenEntering Values Into Controller Fields Controller KeypadSecond Station Setup Screen Third Station Setup Screen Pump Setup Initial Pump Setup ScreenSecond Pump Setup Screen Third Pump Setup Screen System Setup Initial System Setup ScreenSecond System Setup Screen Third System Setup ScreenOverview AlarmsOperation Starting and Stopping the SystemAll Faults Pump FaultGeneral Fault Filter CanMaintenance Configurable Settings Options for Station SetupOptions for Pump Setup Troubleshooting General TroubleshootingStation Alarms Pump AlarmsWarranty Restrictions WarrantyWarranty Specifications AppendixCustomer Responsibilities Warranty LiabilitiesOptional Components Drawings and Diagrams Spare Parts ListController Identification Serial Number Tag Technical Assistance Contact Information