Sterling 882.00274.00 specifications Shipping Information

Page 3

Shipping Information

Unpacking and Inspection

You should inspect your additive feeder for possible shipping damage.

Thoroughly check the equipment for any damage that might have occurred in transit, such as broken or loose wiring and components, loose hardware and mounting screws, etc.

In the Event of Shipping Damage

According to the contract terms and conditions of the Carrier, the responsibility of the Shipper ends at the time and place of shipment.

Notify the transportation company’s local agent if you discover damage.

Hold the damaged goods and packing material for the examining agent’s inspection. Do not

return any goods before the transportation company’s inspection and authorization.

File a claim with the transportation company. Substantiate the claim by referring to the agent’s report. A certified copy of our invoice is available upon request. The original Bill of Lading is attached to our original invoice. If the shipment was prepaid, write us for a receipted transportation bill.

Advise customer service regarding your wish for assistance and to obtain an RMA (return material authorization) number.

If the Shipment is Not Complete

Check the packing list as back-ordered items are noted on it. You should have:

;Additive Feeder

;Bill of lading

;Packing list

;Operating and Installation packet

;Electrical schematic and panel layout drawings

;Component instruction manuals

Re-inspect the container and packing material to see if you missed any smaller items during unpacking.

If the Shipment is Not Correct

If the shipment is not what you ordered, contact the shipping department immediately. For shipments in the United States and Canada, call 1 (800) 233-4819; for all other countries, call our international desk at (630) 475-7491. Have the order number and item number available. Hold the items until you receive shipping instructions.

Returns

Do not return any damaged or incorrect items until you receive shipping instructions from the shipping department.

Additive Feeders

ii

Image 3
Contents SF Series Additive Feeders Parts and Service Department Shipping Information Table of Contents Troubleshooting Safety How to Use This ManualSafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves General Responsibility ResponsibilityRemember Operator ResponsibilityReporting a Safety Defect Maintenance ResponsibilityModels Covered in This Manual Standard FeaturesMechanical Features Functional DescriptionElectrical Features Controller FeaturesOptions Accessories Safety Devices and Interlocks Safety Circuit StandardsFail Safe Operation Safety Device Lock-Outs Rigging and Placing the Additive Feeder InstallationSupply System Installation Uncrating the EquipmentMain Power Connection Electrical ConnectionsControl Relay Connection Determining the Desired Feed Rate Setup Procedures110 100 Calibration Procedure ProcedureEquipment Needed Observed Feed Rates ExamplesShutting Down the Additive Feeder Initial Start-upPre-Startup Checks Starting Up the Additive FeederStart-up SwitchesIndicator Lights OperationTimer Module Used as a Cycle Override Safety TimerCounter Module Elapsed Time Module Regrind Feeder with Proximity Switch Dual Setpoint Control Operation 2 Component ApplicationsSet Point #2 Motor Control Bottom Low Level Extruder Tracking Control Extruder Tracking Installation and SetupExtruder Tracking Equation Motor RPM = 25.2 X Auger RPM Desired Display SettingField Control Programming EquationProgramming Mode Viewing or Changing the ConstantProgramming for Follower Operation Program Minimum Setting Viewing or Changing the Program Minimum SettingViewing or Changing the Program Maximum Setting Exiting Programming Mode and Returning to Run ModeShutting Down the Additive Feeder Additive Feeder Control Factory DefaultsMaintenance Preventative Maintenance SchedulePhotocopy this page for your maintenance records Material Cleanout/Changeover Preventative MaintenanceInstalling Auger Assembly Corrective MaintenanceAuger Assembly Changeover Removing Auger AssemblyReplacement Motor Brush Part Numbers Motor Brush ReplacementTroubleshooting Problem Possible cause Corrective actionIntroduction Additive Feeders Troubleshooting Appendix WarrantyOptional Components Annex B Information Technical SpecificationsAdditive Feeder Specifications and Overall Dimensions Drawings and DiagramsTypical Additive Feeder Controllers SET Point Exploded Assembly Drawing Parts List Spare Parts ListA0541292 Auger Assembly, 1/2 One Component Control Enclosure Parts Identification Two Component Control Enclosure Parts Identification Returned Material Policy Safety Tag InformationWarranty Returns Additive Feeder Safety TagsTechnical Assistance Additive Feeder Identification Serial Number TagPhotocopy this page for your records Worksheet for Charting Feed Rates