2-2 Quick Start-Up Guide
(See Chapter four for complete description)
This “Quick Start” section is intended to help you start your Digital Dosing feeder quickly and easily. Please refer to the enclosed O & I manual for additional information.
Unpacking:
1.Inspect package for damage and notify carrier immediately – DO NOT ACCEPT
EQUIPMENT IF PACKAGING IS DAMAGED!
2.File a claim with the shipping company immediately if damage is evident.
3.Unpack box, making sure all parts indicated on packing list are included.
4.Check all parts and equipment for any damage sustained during shipment.
5.If any damage is noted, contact manufacturer for replacement or service.
6.Make sure the following are present before proceeding:
;Power: 110 or 220 volt, single phase, 50 or 60 hertz (verify voltage on S/N tag)
;Proper mounting flange adapter, and mounting hardware, for the feed throat
;Dry (ZERO VOLTAGE) contact that closes during screw recovery of IMM
;Gram scale to measure weight of additive material for calibration.
Mounting:
1.Mount the feeder, including the dosing hopper, on the feed throat (may need an adapter). Be sure to use appropriate fasteners to secure the feeder in place.
2.Connect the motor drive connector (“Amp”
3.Connect the communication cable
4.Plug power cord into appropriate outlet.
5.INJECTION MOLDING: Connect the “cycle/run” cable
882.01749.00 | 11 of 93 |