SECTION 10 – AUXILIARY POWER GUIDELINES

10-1. Selecting Equipment

1 Auxiliary Power Receptacles

– Neutral Bonded To Frame

2 3-Prong Plug From Case

Grounded Equipment

3 2-Prong Plug From Double

Insulated Equipment

1

2

 

3

OR

Be sure equipment

has this symbol

 

 

and/or wording.

aux_pwr 2/99 – Ref. ST-159 730 / ST-800 577

10-2. Grounding Generator To Truck Or Trailer Frame

3 4

1

GND/PE

 

OR

 

Electrically bond generator

2

frame to vehicle frame by

metal-to-metal contact.

 

1Generator Base

2Metal Vehicle Frame

3Equipment Grounding Terminal

4Grounding Cable

Use #10 AWG or larger insulated copper wire.

YIf unit does not have GFCI re- ceptacles, use GFCI-pro- tected extension cord.

2

S-0854

OM-474 Page 41

Image 45
Contents Processes OM-474Description JulyFrom Hobart to You Table of Contents Page Arc Welding Hazards Symbol UsageElectric Shock can kill ARC Rays can burn eyes and skinEngine Hazards Moving Parts can cause injury Battery Explosion can BlindEngine Exhaust Gases can kill Engine Heat can cause fireEMF Information Principal Safety StandardsRadiation can cause interference ARC Welding can cause interferenceConsignes DE Sécurité Lire Avant Utilisation Signification des symbolesUN Choc Électrique peut tuer LES Fumées ET LES GAZ peuvent être dangereuxDES Particules Volantes peuvent blesser les yeux LE Soudage peut provoquer un in- cendie ou une explosionDES Pièces Chaudes peuvent provoquer des brûlures graves LE Bruit peut affecter l’ouïe’EXPLOSION DE LA Batterie peut DES Organes Mobiles peuvent provoquer des blessuresLA Chaleur DU Moteur peut pro- voquer un incendie LA Chute DE L’APPAREIL peut blesserInformation sur les champs électromagnétiques Principales normes de sécuritéLE Soudage À L’ARC risque de provoquer des interférences Consignes relatives aux stimulateurs cardiaquesSymbols And Definitions SpecificationsWeld, Power, And Engine Specifications DefinitionsDimensions Dimensions, Weights, And Operating AnglesWeight Fuel ConsumptionDuty Cycle And Overheating AC Auxiliary Power60% Duty Cycle At 350 Amperes Minutes WeldingOptional AC Power Plant Curves 5 KVA/KW Single-Phase Auxiliary Power Plant No Weld Load12.5 KVA/KW Three-Phase Auxiliary Power Plant No Weld Load DC Volts CC/DC Standard Volt-Ampere CurvesAC Amperes CV/DC Models with Optional CV-3 Module 100 Ranges 190-Max 110-270Installation Installing Welding GeneratorConnecting The Battery Temperatures below 0 F -18C 13 mm Full Diesel Valve Open Installing MufflerEngine Prestart Checks Do not use gasoline. Gasoline will damage engineSelecting Weld Cable Sizes Connecting To Weld Output Terminals100 ft 30 m Or Less 10 100% Duty CycleTerminal Strip 3T Connections Optional Remote 14 Receptacle RC3 Information Optional, See SectionSocket Information Stop engineFront Panel Controls See Section Operating Welding GeneratorDo not switch under load Ampere Range SwitchDescription Of Front Panel Controls See Section Stop engine and fix trouble if either warning light goes onExample Combination remote amperage control Remote Control OptionalVolt Duplex And Optional Gfci Receptacles Operating Auxiliary EquipmentOpen Contact Volt Duplex Receptacle OptionalConnecting Optional Auxiliary Power Plant Set Engine Control switch to Run when using auxiliary powerFront Maintenance and Troubleshooting Maintenance Label Servicing Air Cleaner To Clean air filterDo not clean housing with air hose Stop engine and let cool Servicing Fuel SystemTo drain water from fuel system To replace fuel filterAdjusting Engine Speed Idle Speed AdjustmentEngine Speed No Load Changing Engine Oil And Filter If any fuse or circuit breaker Overload ProtectionTroubleshooting Inspecting And Cleaning Optional Spark Arrestor MufflerWelding Trouble RemedyAuxiliary Power Check engine control switch, and replace if necessary Coolant temperature gets too high see SectionEngine See engine manualOM-474 Circuit Diagram For Welding Generator For Standard Models Electrical DiagramsOM-474 193 989-B Wetstacking RUN-IN ProcedureLoad Bank Run-In Procedure Using Load BankDo not touch hot exhaust Run-In Procedure Using Resistance GridBank/grid From flammablesAuxiliary Power Guidelines Selecting EquipmentGrounding Generator To Truck Or Trailer Frame How Much Power Does Equipment Require? Grounding When Supplying Building SystemsEarth ground if supplying Use ground device as stated in electrical codesApproximate Power Requirements For Farm/Home Equipment Approximate Power Requirements For Industrial MotorsIndustrial Motors Rating Starting Watts Running Watts Farm/Home Equipment Rating Starting Watts Running WattsContractor Rating Starting Watts Running Watts Approximate Power Requirements For Contractor EquipmentHow Much Power Can Generator Supply? Power Required To Start MotorSingle-Phase Induction Motor Starting Requirements KVA/HP x HP xWelding Generator Auxiliary Power output circuit Typical Connections To Supply Standby PowerItem 4 is not necessary if circuit Protection is already presentCurrent Load Watts Amperes Selecting Extension Cord Use Shortest Cord Possible101 102 105 104 103 Parts List65 66 Includes Items Dia Part Description Mkgs Quantity PLG9,RC9 PC4 Control Box w/Components Control Box w/Components -4 ItemGenerator Generator -1 Item Panel, Front w/Components Panel, Front w/Components -1 Item Page Support ServiceContact your Distributor for Hobart Welding ProductsCall