Vertical Drilling Motor, Type GE752, GEK±91584D

 

Insulation

ger over the center of each brush. See the DATA

 

section for limits.

Measure the insulation resistance with a meg± ohm- meter (Megger) to determine the condition of the insula- tion. If reading is low, make a further inspection to deter- mine if insulation failure or excessive moisture is caus- ing the low megohmmeter reading. Correct the cause of low readings before returning the motor to service.

Inspect all accessible parts of the field coil insulation for cracking and evidence of overheating.

Power Cables

Inspect the power cables for signs of excessive heat- ing, poor insulation or mechanical damage. Assure all terminals are tight. Replace any cables which show low insulation resistance or will not stand 75% above rated voltage.

Mounting Bolts

Check all mounting bolts to assure tightness.

SEMI±ANNUALLY

1.Perform inspection operations listed under Monthly section.

2.Refer to the DATA section for the Brushholder Clearance dimension, and check the clearance between the brushholders and the commutator surface.

If clearance adjustment is required, refer to the BA- SIC REPAIRS, Brushholder Clearance Adjustment sec- tion for instructions.

BASIC REPAIRS

BRUSH REPLACEMENT

NOTE: Brush spring pressure is pre±set and non±adjustable for the brushholders used on these machines. Any brushholder that is dam- aged or has a low spring pressure should be re- placed before installing new brushes. Spring pressure can be measured with a 20±lb. spring scale pulling radially on the brush pressure fin-

1.Remove the commutator inspection covers.

2.Disconnect the brush shunt from the terminal screw, Fig. 5, located on the brushholder body.

3.Lift the pressure finger away from the brush to the toggled±up position. Remove the brush.

4.Use dry, compressed air and blow the carbon dust from the carbonway.

WARNING: When using compressed air for clean- ing purposes, flying debris and particles may present a hazard to personnel in the immediate area. Personnel should be provided with, and trained in the use of, personal protective equip- ment as specified by applicable federal or state safety regulations.

5.Insert a new brush and make sure it slides freely in the carbonway.

6.Carefully lower the pressure finger on the brush. Do not allow the finger to snap down on the brush; this could damage the brush.

7.Bolt the brush shunt terminals to the brushhol- der(s). Arrange the brush shunt strands so they clear the pressure fingers, Fig. 6, and tighten the terminal screw(s). Make sure brush shunts are not positioned under the pressure fingers. Check and tighten all brushholder cable connections.

8.Seat the new brushes with a white seater stone.

CAUTION: When replacing brushes, use the GE recommended grade. Mixing of brush grades in the same motor or changing brushes to another grade will seriously affect commutation, surface film, commutator and brush life. See the DATA section for brush grade.

BRUSHHOLDER REPLACEMENT

Removal

1.Remove brushes from the brushholders and cover the commutator with heavy paper.

2.Disconnect the cable from the brushholder(s) in- volved.

13

Image 13
Contents Vertical Drilling Motor Type GE752 ContentsIntroduction General DescriptionGEK±91584D, Vertical Drilling Motor, Type GE752 Model Differences Vertical Drilling Motor, Type GE752, GEK±91584DData Contd Model DifferencesCarbon Brushes Data ContdPole Bore Diameter measured at center of pole Motors Min Max Motor Ratings Continuous Max. HP Shunt UP Grounding Instructions Special Tools EquipmentOverhaul Grounding Procedures FigLubrication Grease Tubes and Pipe PlugsCovers, Seals, Latches Inspection MonthlyBrushholders Fig Brush Spring Pressure Brushholder SleevesCommutator BrushesCreepage Band Flash RingBrushholder Replacement Basic Repairs Brush ReplacementSEMI±ANNUALLY Brushholder Clearance Adjustment InstallationCommutator Resurfacing Hand Stoning Procedure Sanding ProcedureFixture Grinding Grinder InstallationCommutator GRINDER. E±18249 ±19771A GrindingAir Curing Commutator Testing Before DisassemblyBasic Overhaul Megohmmeter Test DisassemblyBar±To±Bar Resistance Test Armature Removal From FrameCOMMUTATOR±END Bearing Pilot Longitudinal D732922 CHG. N. E±28621D Models See , Description Puller Tools 41D731569 CHG . E±14383C Puller TOOLS. E±18155A Models US1, AUT Longitudinal D735357, CHG. A. E±37949B Models See Table Steam Cleaning CleaningAnti±Friction Bearings/Shaft Tapers/Bearing Fits Vapor DegreasingBearing Inspection ArmatureArmature Shaft Inspection CommutatorMotor Frame Armature Insulation 41D731545 CHG. F. E±18156A See Note Lubrication of Bolts BrushholdersConnection Diagram 493A210 CHG . E±39092B Rewinding Armature Creepage Band ReplacementRiser Width DiameterCommutator Tightening ProcedureHydraulic Press Preferred Method Torque Wrench Acceptable MethodCommutator Resurfacing Spin Seasoning Commutator Assembled On ArmatureTo Change Motor Direction TurningConnection Diagram 41A330278, CHG . E±38055B Connection Diagram 41A330179, CHG. A. E±37950A ±4270B RakingTest After Repair Armature High Potential Test Resistance MeasurementUsed Armature Rewound ArmatureCoil Installation ReplacementProcedure for New Coil±Pole Assembly Motor Frame Field CoilCoiled Frame Assembly 41D732353 CHG. N. E±39094A Models See , Coiled Frame Assembly 41D732345 CHG. V. E±39095A BOX Ground A1 and A2 View AT E Cables with P65 Coiled Frame Assembly 41D735440, CHG. A. E±38056B Description Magnet Frame Coiled Frame Assembly 41D735343, CHG. C. E±37951C Hardened Washer 1 1/4 Gas Torch Brazing Brazing Coil TerminalsTest After Repair Flood Dipping Coiled FrameCoiled Frame Without Armature Balancing Armature ReassemblyVarnish Treatment Armature Drive±End Bearing Figs , 35, 36 Armature BearingsCommutator±End Bearing All Models Except US2, UP6, AUT2 and AUP5DRIVE±END Bearing ASSEMBLY. E±18166E Models US2, UP6, AUT2 and AUP5 DRIVE±END Bearing ASSEMBLY. E±39301DRIVE±END Bearing Assembly 41B537821, CHG. B. E±37952B Models UP and AUP Armature Assembly Into FrameCOMMUTATOR±END Bearing Assembly 41B532745 CHG. F. E±39090A COMMUTATOR-END Bearing Assembly 41B538068 CHG . E-39300 Checking Internal Clearance Brush Installation Hub Fitting HUB MountingHub Mounting Testing Series Machines Testing After OverhaulModels 5GE752AUP, AUT Motor Operation Testing Shunt Machines Models 5GE752UP and USVentilated 2300 cfm at 7.6 in. H2O at Commutator Chamber UnventilatedRemoving Armature Locking Arrangement Cleaning and SlushingLocking the Armature For Shipment ShippingProtection SkiddingArmatures Preparation of BOXStorage Placing Into Storage Boxing the ArmatureShipping BOX with Armature Less COVER. E±3784 Removing from StorageVertical Drilling Motor, Type GE752, GEK±91584D OUTLINE, UP and AUP 41E903631 CHG. H. E±28755B Hole Grease Vent Tube Grease Tube Holes REF OUTLINE, US1, AUT 41E903745, CHG. A. E±37954B ºDº ºBº Vertical Drilling Motor, Type GE752, GEK±91584D GE Transportation Systems