GE GE752 manual Steam Cleaning

Page 30

GEK±91584D, Vertical Drilling Motor, Type GE752

8.Screw a lifting bail, Fig. 14, on the drive end of the shaft.

9.Remove drive±end framehead bolts (30) and in- sert three jack screws in the threaded holes pro- vided in the framehead.

10.Line up the hoist cable with the centerline of the armature before engaging the hook in the lifting bail on the end of the shaft. Engage the hook and lift slightly. With sufficient strain on the hoist cable to take the weight of the armature off the framehead, jack the drive±end framehead loose, and lift the complete armature assembly out of the frame. DO NOT DAMAGE THE COMMUTA- TOR.

CAUTION: Special precautions should be taken to avoid damage to the armature end±windings, bearings or bearing fits, and the commutator when lifting the armature in the vertical position or turning the armature to a horizontal position.

11.Place the armature horizontally in an armature saddle for bearing disassembly.

12.At the drive end, remove the lubricating tube as- sembly (9, 33, 32 and 28) from the framehead.

13.Using puller tool (Part 6751547G4), pull the out- er sleeve (37) from the drive end of the shaft. The sleeve has tapped holes for applying the puller. Heat may be applied.

14.Remove bolts (34), and then remove outer bear- ing cap (36) and gasket (35).

15.Slide framehead (29) off the shaft together with the outer race and rollers of bearing (38). The in- ner race will remain on the shaft.

16.Pull the inner bearing race off the shaft with puller (Part 6751547G5).

17.Remove flinger (39) and inner bearing cap (40) with puller (Part 6751547G6) by inserting the four puller bolts into the tapped holes in inner bearing cap (40).

18.Press the outer bearing race and rollers from the framehead with an arbor press.

NOTE: Before pressing the drive±end outer bearing race out of the framehead, observe and record the number on the face of the race which is opposite the arrow on the framehead. After removal, mark the date (with electric pencil) un- der this number to indicate that this position has been used. Reassemble the bearing with another number opposite the arrow. If the bear- ing has not been previously marked, etch Nos. 1, 2, 3 and 4 (spaced 90 degrees apart) on the face of race with an electric pencil. Locate No. 1 opposite the arrow on the framehead and mark it with the date.

19.Install puller tool (Part 6751547G10) and pull spacer (5) from the commutator end of the shaft.

20.Install puller tool (Part 6751547G6) and pull bearing (4) and bearing housing (3) from the commutator end of the shaft.

21.Press the bearing from the framehead with an arbor press.

22.If applied, remove the nilos ring (4), Fig. 39, from the bearing and discard.

23.If applied, remove the seal ring (5) Fig. 39, from the sleeve and discard.

24.Install puller tool (Part 6751547G11) and pull sleeve (2) from the commutator end of the shaft.

25.If necessary to remove the commutator framehead (14), turn the frame commutator end up and remove bolts and lockwashers (13). Use bolts in the framehead jack±out holes to break the fit and remove.

CLEANING

The two recommended methods for cleaning are steam cleaning and vapor degreasing.

CAUTION: Do not use caustic soda solution on the armature or coiled frame.

Steam Cleaning

(Recommended for both insulated and metal parts)

1.Use steam in combination with a commercial non±caustic cleaner.

30

Image 30
Contents Contents Vertical Drilling Motor Type GE752General Description IntroductionGEK±91584D, Vertical Drilling Motor, Type GE752 Vertical Drilling Motor, Type GE752, GEK±91584D Model DifferencesContd Model Differences DataData Contd Carbon BrushesPole Bore Diameter measured at center of pole Motors Min Max Motor Ratings Continuous Max. HP Shunt UP Special Tools Equipment Grounding InstructionsLubrication Grounding Procedures FigOverhaul Grease Tubes and Pipe PlugsInspection Monthly Covers, Seals, LatchesBrushholders Fig Brushholder Sleeves Brush Spring PressureCreepage Band BrushesCommutator Flash RingBasic Repairs Brush Replacement Brushholder ReplacementSEMI±ANNUALLY Installation Brushholder Clearance AdjustmentCommutator Resurfacing Sanding Procedure Hand Stoning ProcedureGrinder Installation Fixture GrindingCommutator GRINDER. E±18249 Grinding ±19771ATesting Before Disassembly Air Curing CommutatorBasic Overhaul Bar±To±Bar Resistance Test DisassemblyMegohmmeter Test Armature Removal From FrameCOMMUTATOR±END Bearing Pilot Longitudinal D732922 CHG. N. E±28621D Models See , Description Puller Tools 41D731569 CHG . E±14383C Puller TOOLS. E±18155A Models US1, AUT Longitudinal D735357, CHG. A. E±37949B Models See Table Cleaning Steam CleaningBearing Inspection Vapor DegreasingAnti±Friction Bearings/Shaft Tapers/Bearing Fits ArmatureCommutator Armature Shaft InspectionMotor Frame Armature Insulation 41D731545 CHG. F. E±18156A See Note Brushholders Lubrication of BoltsConnection Diagram 493A210 CHG . E±39092B Riser Width Creepage Band ReplacementRewinding Armature DiameterHydraulic Press Preferred Method ProcedureCommutator Tightening Torque Wrench Acceptable MethodSpin Seasoning Commutator Assembled On Armature Commutator ResurfacingTurning To Change Motor DirectionConnection Diagram 41A330278, CHG . E±38055B Connection Diagram 41A330179, CHG. A. E±37950A Raking ±4270BUsed Armature Resistance MeasurementTest After Repair Armature High Potential Test Rewound ArmatureProcedure for New Coil±Pole Assembly ReplacementCoil Installation Motor Frame Field CoilCoiled Frame Assembly 41D732353 CHG. N. E±39094A Models See , Coiled Frame Assembly 41D732345 CHG. V. E±39095A BOX Ground A1 and A2 View AT E Cables with P65 Coiled Frame Assembly 41D735440, CHG. A. E±38056B Description Magnet Frame Coiled Frame Assembly 41D735343, CHG. C. E±37951C Hardened Washer 1 1/4 Brazing Coil Terminals Gas Torch BrazingFlood Dipping Coiled Frame Test After RepairCoiled Frame Without Armature Reassembly Balancing ArmatureVarnish Treatment Armature Commutator±End Bearing Armature BearingsDrive±End Bearing Figs , 35, 36 All Models Except US2, UP6, AUT2 and AUP5DRIVE±END Bearing ASSEMBLY. E±18166E DRIVE±END Bearing ASSEMBLY. E±39301 Models US2, UP6, AUT2 and AUP5DRIVE±END Bearing Assembly 41B537821, CHG. B. E±37952B Armature Assembly Into Frame Models UP and AUPCOMMUTATOR±END Bearing Assembly 41B532745 CHG. F. E±39090A COMMUTATOR-END Bearing Assembly 41B538068 CHG . E-39300 Checking Internal Clearance Brush Installation HUB Mounting Hub FittingHub Mounting Testing After Overhaul Testing Series MachinesModels 5GE752AUP, AUT Ventilated 2300 cfm at 7.6 in. H2O at Commutator Chamber Testing Shunt Machines Models 5GE752UP and USMotor Operation UnventilatedLocking the Armature For Shipment Cleaning and SlushingRemoving Armature Locking Arrangement ShippingArmatures SkiddingProtection Preparation of BOXBoxing the Armature Storage Placing Into StorageRemoving from Storage Shipping BOX with Armature Less COVER. E±3784Vertical Drilling Motor, Type GE752, GEK±91584D OUTLINE, UP and AUP 41E903631 CHG. H. E±28755B Hole Grease Vent Tube Grease Tube Holes REF OUTLINE, US1, AUT 41E903745, CHG. A. E±37954B ºDº ºBº Vertical Drilling Motor, Type GE752, GEK±91584D GE Transportation Systems