Thermo Products CHX3-125N, CDX3-75N, CHX3-75N, CDX3-125N J1. REQUIREMENTS AND SIZING OF DUCT WORK

Page 32
J1. REQUIREMENTS AND SIZING OF DUCT WORK

All installations and services must be performed by qualified service personnel.

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background: Care must be taken not to wet electronic components during leak test. Wetting the primary ignition module may damage its circuitry and cause a hazardous situation. Dry moisture from all leads and terminals if wetting occurs. Wait at least 24 hours for the circuit to fully dry before energizing the burner circuit.

J1. REQUIREMENTS AND SIZING OF DUCT WORK

The duct system must be sized and installed by a qualified installer or service person, following the design standards of the Air Conditioning Contractors of America (ACCA) or ASHRAE.

1.When it is located in the same room as the furnace, a return air register must be installed a minimum of

20feet away from the furnace.

2.The return air duct shall also be sealed to the furnace and also terminate outside of the furnace space, if supply ducts carry circulated air to areas outside the space containing the furnace.

3.The return air duct system must equal the supply air duct system in its capabilities. Use a supplier's catalog for proper sizing of outlet and return air registers and grills to ensure that they meet the CFM requirements of the run to which they are connected.

4.If the furnace is used in connection with an air conditioning evaporator coil, the furnace must be installed parallel with or on the upstream side of the coil, to prevent condensation in the heat exchanger. If the evaporator coil is installed with a parallel flow arrangement, dampers or other means to control flow of air should be installed to prevent chilled air from entering the furnace. If such a device is manually operated, it must be equipped with a means to prevent operation of either the furnace or air conditioner unless it is in the full heat or cool position.

We recommend that the outlet duct be equipped with a removable access panel to allow for visual inspection of the heat exchanger to check for leakage or to allow for insertion of a probe sampler in the air stream. This removable access cover should be attached to ensure there is no air leakage.

5.The duct system shall be sized for the maximum CFM requirement of the installation whether it is for heating or cooling. Two common rules for heating and cooling follow:

A. 400 CFM (1200 BTU's) per ton of cooling is required.

B. 14 CFM of heating per 1000 BTU's of furnace output based on its steady state efficiency and a 55° to 85° temperature rise.

EXAMPLE: Heating output of a furnace is 100,000 BTU/HR 100,000 BTU x 14 cfm = 1400 CFM

1000 BTU

Air conditioning installed is 4 tons x 400 CFM = 1600 CFM or 48,000 BTU’s. NOTE: The duct system must be sized for the larger CFM requirement for cooling. If only 3 tons 36,000 BTUs of cooling x 400 CFM = 1200 CFM was installed, the duct would have to be sized for the 1400 Cfm heating requirement.

26

Image 32
Contents TWO STAGE CONDENSING GAS FURNACE MODELSOR LP GAS PROPANE CDX3-75N CDX3-100N CDX3-125N I. SAFETY INFORMATION This and the previous page contain reproductions of the various warning and instruction labels placed on the Thermo Pride Two Stage Condensing Gas Furnaces. Please read and comply with the contents of these labels 1.A windows be opened The CHX3/CDX3 furnace models are sealed combustion design, which does not require an air shutter adjustment air shutters are not used for proper flame characteristics. Burner box access cover must always be secured with all screws in place and tightened before operating furnace BEGINNING PAGE INDEXSECTION II. FURNACE SPECIFICATIONS CHX3 SERIES CDX3 SERIES INSTALLATION PARTS PACKAGES - CHX3-75 INSTALLATION PARTS PACKAGES - CDX3-75 Grounding instructions III. GENERAL INSTALLATION B. FURNACE LOCATION B1. CDX3 HORIZONTAL APPLICATIONPage PVC Pipe Designation Maximum Quantity of Elbows E.Direct Venting Through a Sidewall Outside Combustion Air Intake RH viewc.The vent terminal shall not be located Page E1. Single-PipeSidewall Venting Option 5.Optional Direct Vent Terminations Install these optional kits according to the instructions provided with each kit. The location and clearance requirements are identical to those of the standard vent terminations described in this manual 1.Figures 6B, 7, and 8 follow depicting typical exhaust vent and air intake connections for the furnace model series CHX3 and the CDX3, respectively, as well as a list of required parts to correctly install each system Page Applications Furnace Model Series CHX3 Figure 9 Typical Internal VentPiping Arrangement for the 3. Connecting The Combustion Air Intake Piping I.CONDENSATE DRAIN LINE AND TRAP ASSEMBLY Figure 14. TRAP ASSEMBLY MOUNTED ON CHX3Figure 15. TRAP ASSEMBLY MOUNTED ON CDX3 2.Determine on which side of furnace the condensate disposal line is to be run NOTICE On CHX3/CDX3’s this must be the same side as the flue outlet or bottom of unit. Attach the condensate trap to the furnace casing using the #8x3/4” sheet metal screws provided in the parts package. Pilot holes are provided on both sides of the casing for mounting J. GENERAL GAS PIPING J1. REQUIREMENTS AND SIZING OF DUCT WORK Figure 18A TABLE 2A K. FILTERS 1. CHX3 MODELS HIGHBOYS 2. CDX3 MODELS COUNTERFLOWSPage L. WIRING Table 4A S7 DIP Switch Switch SettingsOptions Time2-StageBlower Settings from factory Table 4C IV. STARTING THE UNIT A. SEQUENCE OF OPERATIONS IF NOT IF THERMOSTAT W2 CONTACTS ARE CLOSED OTHERWISE B. INITIAL START UP OPERATING INSTRUCTIONSC. Measuring And Adjusting Heat Input Rate Observe the following precautions when measuringA.Burner manifold pressure with a pressure gauge B.Gas flowrate by clocking gas meterNOTICE A U-tubemanometer, measuring pressure in inches of water column, is recommended for all gas pressure measurements. However, an aneroid pressure gauge, in good working condition, capable of reading pressure changes of 0.05 in. W.G., or less, that was recently calibrated within the last year, is a satisfactory alternate. These two 2 devices will be considered as equivalent and interchangeable. Either device is referred to below as a “pressure gauge” Heat input rate in BTUH = Page 21.Go to Checkout Procedure below Checking The Burner FlameCheckout Procedure TABLE 6 - CONVERTING GAS FLOW RATE D. FURNACE CHECKOUT PROCEDURE V. INSTALLERS INSTRUCTIONS TO USERFigure VI. TROUBLESHOOTING DIAGNOSTIC FEATURES Power must be disconnected before servicingTROUBLESHOOTING GUIDE IS INDUCER RUNNING ON LOW SPEED? YES DOES THE HOT DO BURNERS STAY LIT PAST PROOF OF FLAME CHECK? REPLACE THE 50V51-843CONTROL DOESBURNERSHUT OFF Appendix -AReplacement Parts List Page Page Page Appendix - B Wiring Diagrams