Table of Contents | 
  | |
About This Document  | 9  | |
Intended Audience  | 9  | |
Document Organization  | 9  | |
Typographic Conventions  | 9  | |
Documentation Updates and Release Notes  | 10  | |
HP Encourages Your Comments  | 10  | |
1 HP Workgroup System Overview  | 11  | |
1.1 HP Workgroup System Views  | 11  | |
2 Hardware Prerequisites  | 13  | |
2.1  | Hardware Preinstallation Checklist  | 13  | 
2.2  | Firmware Requirements  | 13  | 
3 Hardware Setup  | 15  | |
3.1  | Unpack the Enclosure  | 15  | 
3.2  | Installing and Starting Up the Hardware  | 17  | 
  | 3.2.1 Setting IP Addresses  | 17  | 
  | 3.2.2 Setting Boot Order  | 19  | 
  | 3.2.3 Setting Up iLO  | 19  | 
  | 3.2.4 Enabling Telnet Access  | 20  | 
  | 3.2.5 Setting the Power Regulator  | 20  | 
  | 3.2.6 Configuring Smart Array  | 20  | 
4 Software Prerequisites  | 23  | |
4.1  | Software Preinstallation Checklist  | 23  | 
4.2 Downloading XC Software Patches  | 24  | |
4.3  | Copying the XC.lic File to Your Laptop  | 24  | 
4.4 Associating the Enclosure DVD to the Head Node  | 25  | |
5 XC Software Installation  | 27  | |
5.1  | Booting the DVD  | 27  | 
5.2 Running the cluster_prep Command  | 28  | |
5.3  | Installing Patches from Your Laptop  | 29  | 
5.4  | Putting the License Key File in the Correct Location  | 30  | 
5.5  | Running the discover Command  | 30  | 
5.6 Running the cluster_config Command  | 31  | |
5.7  | Running the startsys Command  | 34  | 
5.8  | Configuring the SNMP Trap  | 34  | 
5.9  | LSF   | 35  | 
5.10 Verifying   | 35  | |
5.11 Running the OVP to Verify Software and Hardware Components  | 36  | |
5.12 Nagios Web Interface  | 37  | |
5.13 The nrg Command  | 37  | |
5.14 Creating a Baseline Copy of the Database  | 38  | |
5.15 Creating a Baseline Report of the System Configuration  | 38  | |
5.16 Setting Up VLAN  | 39  | |
Table of Contents  | 3  |