GE AEM2, AEQ2 installation instructions Finish The Wall Opening

Page 13

Through-the-Wall Installation Instructions—Optional

The case may be installed through-the-wall in both existing and new construction.

Read completely, then follow step-by-step.

NOTE: Obtain all materials locally for mounting the air conditioner through- the-wall.

1

D

IMPORTANT (cont.)

Secure with 14 wood screws anchored at least an inch into the wall support structure.

NOTE: Drill pilot holes, if necessary, for proper installation. If the frame is oversized, use shims to prevent case distortion.

1IMPORTANT

Through-the-wall installation is not appropriate if any of the side or top louvers in the case will be obstructed by the wall.

All side and top louvers in the case must project on the outdoor side of the wall.

The room side of the case must project into the room far enough to maximize the balance of the unit.

2FINISH THE WALL OPENING

ACaulk all four sides on the outdoor side of the case to prevent moisture from getting through to the interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down the outside of the building.

The case must be installed level from side- to-side and with a slight tilt from front to rear. Use a level; no more than a 1/2 bubble will be the correct case slant to the outside.

Lintel angle is required to support bricks or blocks above opening.

Flashing is required and should extend the length of the opening to ensure no inside cavity leakage occurs.

 

Remove the air conditioner from the case.

A

 

For specific instruction, refer to the Window

 

Installation Instructions.

Lintel angle

Caulking

OUTSIDE

Air louvers (top and sides must project on the outdoor side of the wall)

Plaster line

Trim molding (if desired)

INSIDE

Bottom rail

B Make certain that a wall receptacle is

available close to the hole location or make

arrangements to install a receptacle.

Wood filler and caulking (above and below the flashing)

Flashing (Drip rail)

Case Bottom

bottom rail

CPlace the case in the wall opening and place wood support strips between the case bottom and the flashing on both sides of the bottom rail. They should be the same height as the bottom rail and the same length as the wall opening.

Flashing

 

(Drip rail)

Wood support strips

 

BPlace the air conditioner into the case.

For specific instruction, refer to the Window Installation Instructions.

13

Image 13
Contents Manual del propietario 49-7662-1Instrucciones de InstalaciónDO NOT use an adapter plug with this appliance Do not use equipment certified for R22 refrigerant onlyRisk of FIRE. Could cause serious injury or death Read and follow this Safety Information carefullyGEAppliances.com About the controls on the air conditioner Remote ControlEnergy Saver Mode Cool ModeFan Only Mode Power Outage Recovery FeatureCare and cleaning of the air conditioner Before You Begin Amp time-delay fuse or circuit breakerELECTRICAL REQUIREMENTS TOOLS YOU WILL NEEDTop rail gasket Window Foam top window PARTS INCLUDEDGasket Left Top Accordion Type E bolt Type F boltWINDOW REQUIREMENTS Control panel housing from the grilleSTORM WINDOW REQUIREMENTS PREPARE THE AIR CONDITIONERPREPARE THE CASE ContinuesPrepare the Window and Install Prepare the Window and Install the CasePREPARE THE CASE continues Case continuesINSTALL THE AIR CONDITIONER INSTALL THE AIR CONDITIONER IN THE CASEIN THE CASE continues FINISH THE WALL OPENING Problem Possible Causes What To Do Troubleshooting TipsPage Page Original purchase Service to replace the defective part What Is Not CoveredGE Will Replace Warrantor General Electric Company. Louisville, KYWarrantor Mabe Canada Inc Burlington, Ontario Mabe Will ReplaceConsignes de sécurité . . . . . . . . . . . . .20 CommandesInstructions de montage Au Canada, visitez-nous auAvertissement Conservez CES Instructions Commandes du Climatiseur Propos des commandes du climatiseurTélécommande Mode Cool refroidissement TélécommandeMode Fan Only ventilateur uniquement Auto Fan Speed vitesse du ventilateur autoMise EN Garde NE faites PAS Entretien et nettoyage du climatiseurExigences Électriques Avant DE CommencerOutillage Nécessaires Certains modèles nécessitent une prise mise à laSupport en V Ferrure de rebord Verrouillage de Pièces IncluesType a vis Type C vis Boulon de type EPréparation DU Climatiseur FenêtrePréparation DU Climatiseur suite Préparation DU LogementPréparer LA Fenêtre ET Poser LE Capot Préparation DU Logement suitePréparer LA Fenêtre ET Poser LE Capot Suite Percez des trous de guidage si nécessaireDe pénétrer dans la pièce Insérez la mousse entre la vitre et la fenêtre pourEmpêcher l’air et les insectes Finition DE L’OUVERTURE Dans LE MUR Important suiteRetirez le climatiseur de son logement.. Pour Positionnez le logement dans l’ouverture dansBruits normaux de fonctionnement Avant d’appeler le serviceCauses possibles Que faire Problème Page Page Pour la période d’ Nous remplacerons Climatiseur GE-Garantie Limitée D’un AnCe qui n’est pas couvert Garant Mabe Canada Inc Burlington, OntarioAssistance à la clientèle Site Internet GE Producto etiquetado *Energy Star ControleComuníquese con un técnico calificado NO use un enchufe adaptador con este electrodomésticoGEAppliances.com USO DE ProlongadoresControl remoto Acerca de los controles en el acondicionador de aireControles del acondicionador de aire Control remoto Energy Saver Mode Modo de ahorro de energíaModo Cool Frío Modo de Fan Only Solo ventiladorPrecaución no Opere el Cuidado y limpieza del acondicionador de aireRequisitos eléctricos ANTES DE INICIARLea estas instrucciones completa y cuidadosamente De dilatación de tiempo de 15 amperios o un cortacircuitosPARTES INCLUIDAS Herramientas que necesitaráJunta del riel superior Soportes en V Soporte angular Trabas paraRequisitos DE UNA VENTANA DE TORMENTAS REQUISITOS PARA LA VENTANACuando se retire la parrilla del frente, el panel de Prepare LA Carcasa Prepare LA Ventana E Instale LA Caja Prepare LA Carcasa suiteTornillos tipo C Insectos Instale EL Acondicionador EN LA CarcasaSe introduzcan en la habitación Importante ImportanteLea por completo y luego siga todos los pasos Instrucciones de instalación en una ventanaProblema Causas posibles Qué hacer Solucionar problemasSonidos de operación normales Notas Notas Notas Lo que no está cubierto ­Por el período de GE reemplazaráGarante General Electric Company. Louisville, KY Un añoPágina Web de GE Appliances Apoyo al consumidorU..S..A.. GEAppliances..com Consumer Support

AEM2, AEQ2 specifications

General Electric (GE) has long been recognized as a leader in manufacturing advanced electrical equipment, and among its standout products are the AEQ2 and AEM2 circuit breakers. Both devices integrate cutting-edge technologies and feature sets that cater to the evolving demands of modern electrical systems.

The AEQ2, renowned for its compact design, combines reliability with high performance. One of its primary features is the application of state-of-the-art electronic trip units, which provide precise overload and short-circuit protection. This technology ensures that the circuit breaker can swiftly detect faults and interrupt power to prevent damage to downstream equipment. Additionally, the AEQ2 is equipped with advanced communication capabilities, allowing for seamless integration into supervisory control and data acquisition (SCADA) systems. This level of connectivity facilitates real-time monitoring and data analysis, enhancing operational efficiency and reliability.

On the other hand, the AEM2 circuit breaker represents another leap forward in smart electrical distribution. Its design focuses on energy efficiency and sustainability. The AEM2 incorporates energy metering capabilities, enabling users to monitor their power consumption accurately. Furthermore, this breaker features a modular architecture, permitting customized configurations to meet specific application needs. The selective coordination capabilities of the AEM2 ensure that only the affected section of a system is de-energized during fault conditions, maintaining power to critical loads and minimizing disruptions.

Both circuit breakers utilize GE’s advanced arc-extinguishing technology, which promotes safety and longevity. This technology helps to extinguish arcs more effectively during fault conditions, thus increasing the overall lifespan of the breaker. The AEQ2 and AEM2 are designed to operate efficiently in various environments, boasting a high ingress protection rating that allows them to function optimally in harsh conditions.

Another notable aspect of these devices is their eco-friendly design, as they utilize materials and technologies aimed at reducing their overall environmental impact. With a focus on compliance with international standards, both the AEQ2 and AEM2 are tested for safety and performance in diverse applications.

In summary, GE's AEQ2 and AEM2 are exemplary circuit breakers that combine modern technology, energy efficiency, and robust design features. Their advanced protection mechanisms, communication capabilities, and sustainable design make them suitable choices for today’s demanding electrical infrastructure. As industries continue to evolve, the need for reliable and intelligent electrical equipment like the AEQ2 and AEM2 becomes ever more crucial, reinforcing GE’s position at the forefront of electrical innovation.