Rinnai RL75E, RL94E State Regulations, Important In the State of Massachusetts 248 CMR 4.00

Page 41

State Regulations

NOTICE BEFORE INSTALLATION

Rinnai direct-vent appliance must be installed by a state qualified or licensed contractor and a properly trained Rinnai Installer. If you are not properly trained, you must not install this unit.

IMPORTANT: In the State of Massachusetts (248 CMR 4.00 & 5.00)

For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

1.INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors

a.In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

b.In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

2.APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

3.SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL

OBSTRUCTIONS".

4.INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

VB Series Outdoor LS Manual

41

Image 41
Contents REU-VB2528WD-US Table of Contents RL75e RL94e R98LSe R98LSe-ASME SpecificationsSafety Behavior and Practices Safety Features Consumer Safety InformationSafety Definitions Features Features Available on Temperature ControllersDescription of Operation Operating InstructionsMC-91-1US & MCC-91-1US Temperature ControllerTemperature Controller Settings How to Set the TemperatureSetting the Sound Volume Voice Prompt Temperature Options Without a Temperature ControllerRe-setting the Maximum Temperature RL75 and RL94 only MCC-91 Temperature ControllerOverview Using the Water Smart / Bath Fill FunctionSetting the Water Volume Setting the Clock Setting Controller to MuteFilling the Tub Models MC-91 and MCC-91Maintenance Code Fault Remedy Error CodesCode Water Quality Trouble Shooting for Common IssuesAccessing Operating Information Circulating Pump Flushing the Heat Exchanger Error Code LC orGeneral Instructions Installation InstructionsAttachment of the Water Heater Clearances from ApplianceGeneral Instructions Electrical ConnectionGas Piping Pipe Sizing Procedure Example Pressure Relief Valve Installation Instructions Isolation Valves Installation InstructionsPressure Relief Valve Maintenance Water PipingFreeze Protection Pressure Relief ValveManual draining of the water heater When the water heater or external piping has frozenFreeze Protection KEY Freeze Protection PipingRinnai Water Heater Recommended Piping for Basic InstallationFor this application Recommended Piping for Circulation SystemsFlue Terminal Clearances ANS Z21.10.3, CSA Description Canadian Installations US Installations Additional Clearances High Altitude Installations Connecting Multiple Water HeatersNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Configurations Temperature Controller InstallationLocation Cable Lengths and SizeOutline of Remote Mounting the ControllerOperating Instructions For Your Safety Read Before OperatingOutlet Flow Data Technical DataPressure Drop Curve Replacement Temperature SettingSpace Heating PumpsDimensions Ladder Diagram for RL75e and RL94e HOT Ladder Diagram for R98LSe and R98LSe-ASMELimited Warranty Warranty InformationWhat is covered? Consumer SupportLimitation on warranties How do I get service? What is not covered?What will Rinnai do? Important In the State of Massachusetts 248 CMR 4.00 State RegulationsOu lappel 1-866-RINNAI1 Temp. d’eau Instructions dutilisationLes températures suggérées sont de Plages de température avec un contrôleur de températureOptions de température sans contrôleur à distance Entretien Instructions générales Fixation du chauffe-eau Écartements par rapport à lappareilRaccordement électrique Instructions générales Installations à haute altitudeTuyauterie de gaz Tuyauterie deau Valve de dégagement de pression Instructions d’InstallationNiveau maximum Qualité de leauSoupape de sûreté Espacements pour terminaisons de cheminée ANS Z21.10.3, CSA Réf Description Installations Canada Installations USA Légende Tuyauterie recommandée pour installation de baseVanneMa ualmanuelleValve Instructions dutilisationPhase Diagramme en escalier RL75e, RL94eB C Diagramme en escalier R98LSe, R98LSeASMEInformations sur la garantie Support à la clientèleQuest-ce qui est couvert ? Combien de temps dure la couverture ?Limitation sur les garanties Que fait Rinnai pour exercer la garantie ?VB2528W VB2735W VA3237W