Rinnai RL75E, RL94E installation manual Freeze Protection Piping, Key

Page 23

Freeze Protection Piping

Vacuum

Breaker

Rinnai

Water Heater

3/4" Gas Connection

NOTE:

Heat trace ALL water pipe and fittings located outside home (attic, crawl space) or building structure. (ALL water pipe and fittings shown above the dashed line in the drawing.)

Gas Supply

NOTE:

ALL pipe and fittings shown below dashed line should be located inside home or building structure.

The vacuum breaker line should be located inside the building structure.

Minimum 3/4" Hot Water

Supply Line

1/2" Minimum

Normally Open

Solenoid Valve

S

3/4" Minimum

Normally Closed

Solenoid Valve

S

Route to Floor Drain

Minimum 3/4"

Cold Water

Supply Line

 

KEY

3/4" Ball Valve

Pressure Regulator

 

3/4" Union

Circulating Pump

Check Valve

Boiler Drain Valve

Pressure Relief Valve

S Solenoid Valve

This is not an engineered drawing. It is intended only as a guide and not as a replacement for professionally engineered project drawings. This drawing is not intended to describe a complete system. It is up to the contractor/engineer to determine the necessary components and configuration of the particular system being installed. This drawing does not imply compliance with local building code requirements. It is the responsibility of the contractor/engineer to ensure installation is in accordance with all local building codes. Confer with local building officials before installation.

VB Series Outdoor LS Manual

23

Image 23
Contents REU-VB2528WD-US Table of Contents RL75e RL94e R98LSe R98LSe-ASME SpecificationsSafety Behavior and Practices Safety Features Consumer Safety InformationSafety Definitions Operating Instructions Features Available on Temperature ControllersFeatures Description of OperationMC-91-1US & MCC-91-1US Temperature ControllerTemperature Controller Settings How to Set the TemperatureMCC-91 Temperature Controller Temperature Options Without a Temperature ControllerSetting the Sound Volume Voice Prompt Re-setting the Maximum Temperature RL75 and RL94 onlyOverview Using the Water Smart / Bath Fill FunctionSetting the Water Volume Models MC-91 and MCC-91 Setting Controller to MuteSetting the Clock Filling the TubMaintenance Code Fault Remedy Error CodesCode Water Quality Trouble Shooting for Common IssuesAccessing Operating Information Circulating Pump Flushing the Heat Exchanger Error Code LC orGeneral Instructions Installation InstructionsAttachment of the Water Heater Clearances from ApplianceGeneral Instructions Electrical ConnectionGas Piping Pipe Sizing Procedure Example Water Piping Isolation Valves Installation InstructionsPressure Relief Valve Installation Instructions Pressure Relief Valve MaintenanceFreeze Protection Pressure Relief ValveManual draining of the water heater When the water heater or external piping has frozenFreeze Protection KEY Freeze Protection PipingRinnai Water Heater Recommended Piping for Basic InstallationFor this application Recommended Piping for Circulation SystemsFlue Terminal Clearances ANS Z21.10.3, CSA Description Canadian Installations US Installations Additional Clearances Guidelines Connecting Multiple Water HeatersHigh Altitude Installations Number Connected Accessories Necessary Water HeatersCanada only Cable Lengths and Size Temperature Controller InstallationConfigurations LocationOutline of Remote Mounting the ControllerOperating Instructions For Your Safety Read Before OperatingOutlet Flow Data Technical DataPressure Drop Curve Pumps Temperature SettingReplacement Space HeatingDimensions Ladder Diagram for RL75e and RL94e HOT Ladder Diagram for R98LSe and R98LSe-ASMEConsumer Support Warranty InformationLimited Warranty What is covered?Limitation on warranties How do I get service? What is not covered?What will Rinnai do? Important In the State of Massachusetts 248 CMR 4.00 State RegulationsOu lappel 1-866-RINNAI1 Temp. d’eau Instructions dutilisationLes températures suggérées sont de Plages de température avec un contrôleur de températureOptions de température sans contrôleur à distance Entretien Instructions générales Fixation du chauffe-eau Écartements par rapport à lappareilRaccordement électrique Instructions générales Installations à haute altitudeTuyauterie de gaz Tuyauterie deau Valve de dégagement de pression Instructions d’InstallationNiveau maximum Qualité de leauSoupape de sûreté Espacements pour terminaisons de cheminée ANS Z21.10.3, CSA Réf Description Installations Canada Installations USA Légende Tuyauterie recommandée pour installation de baseVanneMa ualmanuelleValve Instructions dutilisationPhase Diagramme en escalier RL75e, RL94eB C Diagramme en escalier R98LSe, R98LSeASMECombien de temps dure la couverture ? Support à la clientèleInformations sur la garantie Quest-ce qui est couvert ?Limitation sur les garanties Que fait Rinnai pour exercer la garantie ?VB2528W VB2735W VA3237W