COMPLETING THE INSTALLATION

Performing the Gas Leak Tests

CD

A

B

Make sure to check for gas leaks before completing the installation process (connecting the assembly pipe and hose between indoor unit and outdoor unit, insulating the cables, hose and pipe, and fixing the indoor unit to the installation plate).

To check for gas leaks on the...

Using a leak detector, check the...

 

 

Indoor unit

Flare nuts C and D.

 

 

Outdoor unit

Valves A and B.

 

 

LEAK TEST WITH NITROGEN (before opening valves)

In order to detect basic refrigerant leaks, before recreating the vacuum and recirculating the R410A, it’s responsible of installer to pressurize the whole system with nitrogen (using a cylinder with pressure reducer) at a pressure above 40 bar (gauge).

LEAK TEST WITH R410A (after opening valves)

Before opening valves, discharge all the nitrogen from the system and create vacuum according to page 18.

After opening valves, check leaks using a leak detector for refrigerant.

PUMP DOWN (before disconnecting the refrigerant connections for unit repair, removal or disposal)

Pump-down is an operation intended to collect all the system refrigerant in the outdoor unit.

This operation must be carried out before disconnecting the refrigerant tubing in order to avoid refrigerant loss to the atmosphere.

-Shut off the liquid valve with the Allen wrench.

-Turn the system on in cooling with fan operating at high velocity. (Compressor will immediately start, provided 3 minutes have elapsed since the last stop).

-After 2 minutes of operation, shut the suction valve with the same wrench.

-Turn the system off and switch mains supply off.

-Disconnect tubing. After disconnection, protect valves and tubing ends from dust.

-Compressor damage may occur if run at a negative suction pressure.

E-20

Vivaldi_IM_30271A_E_11.07.09.indd 20

2009-11-7 13:57:14

Image 20
Contents Vivaldi IM30271AE11.07.09.indd 2009-11-7 Contents Safety Precautions EnglishMinor personal injury or property Choosing the Installation Location Model Figure Description Top view Side viewWhen installing more than 1 outdoor unit Accessories Accessories in the Indoor Unit CaseAccessories in the Outdoor Unit Case Following accessories are supplied with the air conditionerFixing the Installation Plate Direction of pipeConnecting the Assembly Cable Model Power cable Interconnection Type GLIndoor unit Outdoor unitOuter Diameter Torque kgfcm DO not Wall UP the Pipe ConnectionPurging the Indoor Unit Cutting or Extending the Pipe Depth a Flaring Size BInstalling and Connecting the Drain Hose of the Indoor Unit Drain hose installation Direction of the drained water Change the direction only when it is necessaryChanging Direction of the Drain Hose Installing and Connecting the Drain Hose of the Outdoor Unit Purging the Connected Pipes With a Global Warming Potential GWP =You should purge the air in the indoor unit and in the pipe Reduction of cooling capacity and malfunctionAdd refrigerant charge according to table below  If you use a pipe ThenGWP value 1975Performing the Gas Leak Tests To check for gas leaks onLeak Test with Nitrogen before opening valves Leak Test with R410A after opening valvesFixing the Indoor Unit in Place Fixing the Outdoor Unit in PlaceFinal Check and Trial Operation Storage in a handy and safe place Pump Down Procedure When removing the productProviding Information for User Vivaldi IM30271AE11.07.09.indd 2009-11-7 Installation Manual Cooling and Heating
Related manuals
Manual 31 pages 36.44 Kb Manual 32 pages 17.61 Kb Manual 32 pages 60.27 Kb Manual 30 pages 51.71 Kb Manual 32 pages 35.17 Kb Manual 32 pages 6.86 Kb Manual 34 pages 7.54 Kb Manual 32 pages 51.3 Kb Manual 33 pages 37.87 Kb Manual 31 pages 55.87 Kb Manual 31 pages 51.06 Kb