Heatiator CD4842ILR-C 222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mm, Elbow, 251 mm, Support

Page 66

B. Vent Components Diagrams (continued)

8-3/4 in.

222 mm

 

6-1/2 in.

6-1/2 in.

165 mm

 

165 mm

6-1/2 in.

 

6 in.

165 mm9-1/4 in.

235 mm

152 mm

 

6-5/8 in.

 

168 mm

6-5/8 in.

SLP45

168 mm

45° Elbow

 

 

9-7/8 in.

 

251 mm

 

SLP90

 

90° Elbow

Effective

Height/

Length

Effective Height/Length

Pipe

inches

mm

 

SLP4

4

102

 

SLP6

6

152

 

SLP12

12

305

 

SLP24

24

610

 

SLP36

36

914

 

SLP48

48

1219

 

SLP6A

2 - 6

51 - 152

DVP-SLP24

SLP12A

2 - 12

51 - 305

Adapter

SLP PIPE

SLP-HVS

SLP-FS

SLP-WS

Horizontal Pipe

Ceiling Firestop

Wall Shield Firestop

Support

 

 

Figure 16.7 SLP Series Vent Components

 

 

66

Heatilator • CD4236IR-C, CD4842IR-C2207-900 Rev. J • 11/11

Image 66
Contents HOT Surfaces Models CD4236IR-C CD4842IR-C CD4236ILR-C CD4842ILR-CWhat to do if you smell gas Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace IPI Battery Tray/Battery Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalControl Module Operation Module ResetNine Hour Safety Shutdown Feature Before Lighting FireplaceWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxLogs/Grate and Valve Assembly Removal Extra Screws to be Removed for CD4842IR-CRemove burner skirt by removing 4 screws. See Figure Burner Identification/Verification 12 Burner identification ExamplesGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardCD4236 Series Framing and ClearancesSelecting Appliance Location CD4842 SeriesMinimum Framing Dimensions Constructing the Appliance ChaseClearances Mantel and Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsVent Diagrams Top Vent Horizontal TerminationV1 Minimum H1 Maximum Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows Min MaxBreak Here Top Vent Vertical Termination Maximum + V 2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumHeatilator CD4236IR-C, CD4842IR-C 2207-900 Rev. J 11/11 Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H1 + H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumRear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3 Maximum 10 ftWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-ZoneGas Kit Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceHeader Assemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Electrical InformationElectrical Service and Repair Junction Box Installation Wall Switch Installation for Fan OptionalCombustible Mantels FinishingFacing Material CD4236Appliance Setup LOG Placement Instructions Install the Log AssemblyAir Shutter Settings Install Trim and/or SurroundAir Shutter Setting CD4236IR-C CD4842IR-C Fully OpenTroubleshooting Symptom Possible Cause Corrective ActionIntelliFire PlusTM Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters GAS Line Access R Left Side TOP View Front View Right View Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapDVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDVP-FBHT SLP-LPC Optional Wire HarnessPVI-SLP DVP-HRC-SS DVP-HRC-ZC-SS251 mm 222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mmElbow Effective Height LengthSLP-SNKD SLP-CCS-BK SLP-TVHW Fire Risk SLP-HRC-SS SLP-HRC-ZC-SSAt Depot Service PartsLog Set Assembly 36 in. Caliber DVStocked 42 in. Caliber DVCD4842IR-C #19 Valve AssemblyCD4236IR-C Beginning Manufacturing Date Dec Ending Manufacturing DateCD4236IR-C, CD4236ILR-C, CD4842IR-C, CD4842ILR-C Contact Information