Heatiator CD4236ILR-C, CD4236IR-C, CD4842ILR-C Rear Vent Vertical Termination Three Elbows

Page 36

Rear Vent - Vertical Termination - (continued)

Three Elbows

 

 

H1 Maximum

V1 Minimum

 

H2

H1 + H2 Maximum

 

 

2 ft.

610 mm

6 in.

 

152 mm

2 ft.

 

610

4 ft.

 

1.2 m

 

 

 

 

mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 ft.

914 mm

1 ft.

 

305 mm

4 ft.

 

1.2 m

7 ft.

 

2.1 m

 

 

 

 

5 ft.

1.5 m

2 ft.

 

610 mm

6 ft.

 

1.8 m

11 ft.

 

3.4 m

V2

7 ft.

2.1 m

3 ft.

 

914 mm

8 ft.

 

2.4 m

15 ft.

 

4.6 m

8 ft

2.4 m

4 ft.

 

1.2 m

10 ft.

 

3.1 m

18 ft.

 

5.5 m

 

 

 

 

 

 

 

 

H1= 8 ft (2.4 m) Max.

V1 + V2 + H1 + H2= 40 ft (12.2 m) Max.

 

 

 

 

 

H1 + H2 = 20 ft (6.1 m) Max.

 

 

 

H2

V1

Figure 7.20

H1

Three Elbows

V1

H3

H1

H2

Figure 7.21

INSTALLED

HORIZONTALLY

H1

H2

H3

V1 Minimum

H1 + H2 + H3

Maximum

*

*

*

8 ft.

2.4 m

6 ft.

 

1.8 m

*

*

*

9 ft.

2.7 m

7 ft.

 

2.1 m

*

*

*

10 ft.

3.1 m

8 ft.

 

2.4 m

*

*

*

10 ft.

3.1 m

8 ft.

 

2.4 m

V1 + H1 + H2 + H3 = 40 ft. (12.2 m) Maximum *No specific restrictions on this value EXCEPT

V1 + H1 + H2 + H3 cannot exceed 40 ft. (12.2 m) Maximum H1 + H2 + H3 = 8 ft. (2.4 m) Maximum

36

Heatilator • CD4236IR-C, CD4842IR-C2207-900 Rev. J • 11/11

Image 36
Contents Models CD4236IR-C CD4842IR-C CD4236ILR-C CD4842ILR-C What to do if you smell gasHOT Surfaces Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesIPI Battery Tray/Battery Installation Fan Kit optionalModule Reset Nine Hour Safety Shutdown FeatureControl Module Operation Before Lighting FireplaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxLogs/Grate and Valve Assembly Removal Extra Screws to be Removed for CD4842IR-CRemove burner skirt by removing 4 screws. See Figure Burner Identification/Verification 12 Burner identification ExamplesGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationCD4236 Series CD4842 SeriesMinimum Framing Dimensions Constructing the Appliance ChaseClearances Mantel and Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal TerminationTop Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows Min MaxBreak Here Top Vent Vertical Termination Maximum + V 2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 Maximum Heatilator CD4236IR-C, CD4842IR-C 2207-900 Rev. J 11/11 Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H1 + H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumRear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3 Maximum 10 ftVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-ZoneGas KitFlat Ceiling Installation Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceHeader Installing Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire PlusTM Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialCombustible Mantels CD4236Appliance Setup LOG Placement Instructions Install the Log AssemblyInstall Trim and/or Surround Air Shutter SettingAir Shutter Settings CD4236IR-C CD4842IR-C Fully OpenTroubleshooting Symptom Possible Cause Corrective ActionIntelliFire PlusTM Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters GAS Line Access R Left Side TOP View Front View Right View Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-FBHT Optional Wire Harness PVI-SLPSLP-LPC DVP-HRC-SS DVP-HRC-ZC-SS222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mm Elbow251 mm Effective Height LengthSLP-SNKD SLP-CCS-BK SLP-TVHW Fire Risk SLP-HRC-SS SLP-HRC-ZC-SSService Parts Log Set AssemblyAt Depot 36 in. Caliber DVStocked 42 in. Caliber DV#19 Valve Assembly CD4236IR-CCD4842IR-C Beginning Manufacturing Date Dec Ending Manufacturing DateCD4236IR-C, CD4236ILR-C, CD4842IR-C, CD4842ILR-C Contact Information