Heatiator CD4842IR-C, CD4236ILR-C, CD4236IR-C, CD4842ILR-C Clearances, Mantel and Wall Projections

Page 23

C. Clearances

NOTICE: Install appliance on hard metal or wood surfaces extending full width and depth. DO NOT install directly on carpeting, vinyl, tile or any combustible material other than wood.

WARNING! Risk of Fire! Maintain specified air space clearances to appliance and vent pipe:

Insulation and other materials must be secured to prevent accidental contact.

The chase must be properly blocked to prevent blown insulation or other combustibles from entering and making contact with fireplace or chimney.

Failure to maintain airspace may cause overheating and a fire.

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing or finishing material closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc).

Note: All

 

 

 

measurements

 

 

in inches.

TO CEILING

 

 

 

 

18

 

 

 

12

 

 

 

11

 

 

 

10

32

 

 

9

 

 

 

 

8

25

 

 

7

19

 

 

6

 

 

18

 

 

5

 

4

17

 

 

16

 

3

 

 

 

15

 

 

 

 

 

 

14

 

 

 

13

 

2-1/2

12

 

 

11

 

 

 

 

 

 

10

 

 

5

 

 

 

 

MEASUREMENTS FROM

 

 

TOP EDGE OF THE OPENING

 

Figure 5.3 Minimum Vertical and Maximum Horizontal

 

Dimensions

 

 

 

Mantel Legs or Wall Projections

Top of

 

Appliance

Drywall

 

A

B

Mantel Leg or

Perpendicular Wall

A1 in. (25 mm) min. to perpendicular wall

B3-1/2 in. (89 mm) min. from fireplace opening to perpendicular wall

Figure 5.4 Mantel Leg or Wall Projections (Acceptable on both sides of opening)

Heatilator • CD4236IR-C, CD4842IR-C2207-900 Rev. J • 11/11

23

Image 23
Contents Hot glass will cause burns Models CD4236IR-C CD4842IR-C CD4236ILR-C CD4842ILR-CWhat to do if you smell gas HOT SurfacesHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches IPI Battery Tray/Battery InstallationBefore Lighting Fireplace Module ResetNine Hour Safety Shutdown Feature Control Module OperationGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsExtra Screws to be Removed for CD4842IR-C Logs/Grate and Valve Assembly RemovalRemove burner skirt by removing 4 screws. See Figure 12 Burner identification Examples Burner Identification/VerificationTypical Appliance System Getting Started Any such action may cause a fire hazard Design and Installation Considerations Tools and Supplies Needed Inspect Appliance and ComponentsCD4842 Series Framing and ClearancesSelecting Appliance Location CD4236 SeriesConstructing the Appliance Chase Minimum Framing DimensionsMantel and Wall Projections ClearancesVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyTop Vent Horizontal Termination Vent DiagramsV1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 MaximumMin Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsHeatilator CD4236IR-C, CD4842IR-C 2207-900 Rev. J 11/11 H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Minimum Maximum Rear Vent Vertical Termination One Elbow Two ElbowsV1 Minimum H1 + H2 + H3 Maximum 10 ft Rear Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-ZoneGas Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentHeader Installing the Non-combustible BoardSecuring and Leveling the Appliance Assemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeGas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Optional Accessories RequirementsWall Switch Installation for Fan Optional Electrical Service and Repair Junction Box InstallationCD4236 FinishingFacing Material Combustible MantelsAppliance Setup Install the Log Assembly LOG Placement InstructionsCD4236IR-C CD4842IR-C Fully Open Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsIntelliFire PlusTM Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials GAS Line Access R Left Side TOP View Front View Right View DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPCOOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-FBHT DVP-HRC-SS DVP-HRC-ZC-SS Optional Wire HarnessPVI-SLP SLP-LPCEffective Height Length 222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mmElbow 251 mmSLP-SNKD SLP-CCS-BK SLP-TVHW SLP-HRC-SS SLP-HRC-ZC-SS Fire Risk36 in. Caliber DV Service PartsLog Set Assembly At Depot42 in. Caliber DV StockedBeginning Manufacturing Date Dec Ending Manufacturing Date #19 Valve AssemblyCD4236IR-C CD4842IR-CCD4236IR-C, CD4236ILR-C, CD4842IR-C, CD4842ILR-C Contact Information