Heatiator CR36D, CL36D owner manual ST375 Square Termination Cap

Page 34

TR342 Round Telescoping Termination Cap

TS345/TS345P Square Termination Cap

Assemble

Termination

storm collar

Cap

around extended

 

 

 

 

 

 

 

termination cap

 

 

 

 

 

 

 

pipe

 

 

 

 

 

 

 

once cap is

 

 

 

 

 

 

 

installed.

 

 

 

 

Do NOT

 

 

 

 

 

 

 

 

 

 

 

 

block air

 

 

 

 

 

 

Caulk gaps between

 

 

 

 

 

holes

storm collar & pipe,

 

Storm

and storm collar

 

Collar

& chase top.

 

 

 

 

 

3 clip brackets.

 

 

 

 

 

Slip over chase collar

 

 

 

 

 

and attach with screws

 

 

 

 

 

 

provided.

Collar

 

 

 

 

 

 

 

2 in. (51 mm)

 

 

 

14 1/2 in. (368 mm)

Minimum Height

 

 

 

 

 

 

 

Maximum

 

 

 

 

 

 

Chase Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chase

Collar

2 in. (51 mm)

Minimum Height

Chase Top

Place waterproof sealer under each flange of the termination cap and on top of each screw to help prevent leaks.

Termination Cap

The last section of pipe must stop between 2 in. (51 mm) above the top of the chase and 4 3/4 in. (121 mm) below the top of the chase.

2 in. (51 mm)

maximum

4 3/4 in. (121 mm) maximum

Chase

Chimney

Pipe

Chimney

Pipe

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

Figure 9.5 Installing a TR342 Round Telescoping Termination Cap

ST375 Square Termination Cap

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm).

ÎFigure 9.7 Installing a TS345/TS345P Square Termination Cap

TCT375 Terra Cotta Cap

Flange

Termination Cap

Collar

2 in. (51 mm)

Minimum Height

Chase Top

Chimney

Pipe

Place waterproof caulk or sealer under each flange of the termination cap and on top of each screw to help prevent leaks.

The last section of pipe must stop between 2 in. (51

mm)above the top of the chase and 4 3/4 in. (121

mm)below the top of the chase.

2 in. (51 mm)

maximum

4 3/4 in. (121 mm) maximum

Chase

 

Place waterproof sealer

Remove 2 screws

under each flange of the

termination cap and on

from front & back

top of each screw to

to lift the top off

help prevent leaks.

 

Termination Cap

The last section of pipe

 

must stop between 2 in.

 

(51 mm) above top of

Collar

chase and 7 in. (178 mm)

below top of chase

2 in. (51 mm)

 

Minimum Height

 

Chase Top

2 in. (51 mm)

 

7 in. (178 mm)

 

Chase

Chimney

 

Pipe

 

Termination cap pipe and chimney section must overlap

1-1/2 in. (38 mm)

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

ÎFigure 9.6 Installing an ST375 Square Termination Cap

ÎFigure 9.8 Installing a TCT375 Terra Cotta Cap

34

Heatilator • CL36D, CR36D • 12538 • Rev V • 05/09

Image 34
Contents Hot screen/mesh and glass doors will cause burns Wood Burning FireplaceFire Risk Grate Listing Label Information/LocationNumber Installer Guide Table of ContentsUser Guide Limited Warranty Heatilator CL36D, CR36D 12538 Rev V 05/09 Non-Combustible Materials Listing and Code ApprovalsAppliance Certification Combustible MaterialsYour Fireplace Operating InstructionsHot glass will cause burns Grate Seasoned WoodStarting a Fire FirescreenVented Gas Log Sets & Gas Log Lighters Glass DoorsOutside Air optional Optional ComponentsWood Fuel Hardwood vs SoftwoodChimney Inspection/Cleaning Maintenance and ServiceDisposal of Ashes Inspect Grate Glass CleaningCheck Firebox Refractory Frequency As desiredTroubleshooting Guide Start Fire Problems Possible Cause SolutionGetting Started Typical Fireplace SystemDraft Design and Installation ConsiderationsNegative Pressure Locating Fireplace & Chimney Frequently open doors Central heat outlets or returnsFireplace System Requirements Tools and Supplies NeededInspect Fireplace and Components Framing & Clearances Select Fireplace LocationClearances Clearances to Combustible MaterialsSidewalls/Surrounds Mantel Leg or Wall ProjectionsFrame the Fireplace RequiredPosition the Fireplace Installation of FireplaceThings to Consider Place Protective Metal Hearth StripsYES Install Outside Air Kit Outside Air InstallationChimney Assembly Chimney Requirements Height of Chimney ComponentsUsing Offsets/Returns ExampleInstall Ceiling Firestops Install Chimney Air KitAssemble Chimney Sections Install Attic Insulation Shield Mm overlapInstall Flashing Complete InstallationCut out Hole in Roof Chimney Termination Requirements Flat RoofsChase Installations Construct the ChaseInstall Chase Top Install Fireplace & ChimneyInstall Termination Cap ST375 Square Termination Cap Radiation Shield ShroudsField Constructed Shrouds Mailbox Style Shroud radiation shield required Hearth Extension Finishing= 1/k x inches of thickness Finishing Material In. Micore or equivilent insulationCombustible Mantel Mantel50 deg 16 3/4 in. Minimum 14-1/2 39 deg 18 in. Min Wood Burning Inserts AccessoriesGas Log/Lighter Provision Gas Code, Ansi Z223.1Fireplace Dimensions Reference MaterialsChimney Components Catalog #14-1/2 10-7/8 276 mm Service Parts CL36DParts Contact Information
Related manuals
Manual 48 pages 44.09 Kb