Quadra-Fire 839-1320, 839-1340, 839-1290, 844-4120 owner manual Horizontal Termination, Type a, Step

Page 12

F. Horizontal Termination

WARNING

Type A -

90DEGREE ELBOW

Up & Out Installations for Top Vent Configurations

WALL THIMBLE

PIPE LENGTH

 

HHW2 -

WALL

Recommended

 

PIPE LENGTH

THIMBLE

for optimum

COVER

performance.

Fire Hazard.

Exhaust Fume Risk.

Impaired Performance of Appliance.

Ensure vent components are locked together correctly.

Pipe may separate if not properly joined.

Step 2.

Direct vent pipe is designed with a locking connection. To connect the venting system to the appliance flue outlet, a twist-lock adapter is built into the appliance at the factory. Wall thickness may vary. Remember to include wall thickness in minimum clearances when figuring venting lengths for your installation needs.

On horizontal terminations use Hearth & HomeTechnologies Part #HHW2, or like components.

Type B - Rear Installations for Use with Rear Vent Kit

SNORKLE KIT

WALL THIMBLE

 

COVER

 

15-5/8 in.

 

(397mm)

 

C

21 in.

(533mm)

WALL THIMBLE

 

PIPE LENGTH WALL STRAP

 

14 in. (356mm) Wide

 

(See Section 12 for conversion kit and venting components.) This is the only venting configuration that requires the use of the rear vent derating orifice that comes with the rear vent kit. NOTE: A Snorkel Kit is required.

Figure 5.3

Step 1.

Determine the desired location of the appliance. Check to ensure that wall studs or roof rafters are not in the way when the venting system is attached. If this is the case, you may want to adjust the location of the appliance.

Note: Female ends of direct vent pipe/elbows are designed to slide straight onto the male ends of adjacent pipes by orienting the pipe indentations so they match and slide into the entry slots on the male ends, see Figure 5.4. Push the pipe sections completely together, then twist-lock one section clockwise approximately one-quarter turn, until the two sections are fully locked. The female locking lugs may not be visible from the outside. They may be located by examining the inside of the female ends.

Female Locking Lugs

Male Locking Lugs

Figure 5.4

WARNING

Fire Risk. Explosion Risk. Combustion Fume Risk.

Use vent run supports per installation instructions. Connect vent sections per installation instructions.

Maintain all clearances to combustibles.

Do NOT allow vent to sag below connection point to appliance.

Maintain specified slope (if required).

Improper support may allow vent to sag or separate.

 

 

 

 

Page 12

Quadra-Fire · Topaz · 7009-113E

January 3, 2007

Image 12
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Manufactured Date Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Design & Installation Considerations Getting StartedInspect Appliance & Components Tools and Supplies NeededAppliance Location and Clearances Selecting Appliance LocationClearances Design Purposes only4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Exceptions for Horizontal InstallationsVenting Guidelines Vertical Distance from Appliance to 90 ElbowUp & Out Installations for Top Vent Configurations Type B Rear Installations for Use with Rear Vent KitHorizontal Termination Type aRear Vent 203mm Vertical Termination Direct Vent PipeStep Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Type a Up & Out Installations for Top Vent Configurations Existing Masonry ChimneyCap Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Valve Regulator Replacement Propane Natural GASGas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthON/OFF Appliance Setup Remove Shipping MaterialsTop to Rear Vent Conversion Accessories Leg Leveling SystemFront Installation Fronts shipped attached to face Brick InstallationFor Both Quartet and Solitaire Fronts Positioning the Logs Qty DescriptionMineral Wool Glass Door Assembly Replacement Blower Installation31 Blower Wiring Diagram Damper Adjustment Shutter AdjustmentFor TOP or Rear Vent Installations Make adjustmentOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram Vent Components List MiscellaneousTopaz Item # DescriptionRD. Service Parts List cont’d BRNR-TOPAZRV-TPZ-CCR RV-TPZ-CLGRV-TPZ-CSB RV-TPZ-CWLCast Parts Individual Pieces RE. Accessories Warranty Policy This page Intentionally Left Blank Quadra-Fire · Topaz · 7009-113E January 3 This page Intentionally Left Blank Topaz Contact InformationDealer Telephone