Quadra-Fire 839-1340, 839-1320, 839-1290, 844-4120 owner manual Twist-lock the vent cap and seal

Page 17

Step 9.

Twist-lock the vent cap and seal.

Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors (Figure 5.16). The opening should be framed to 10 in. x 10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13.

NAILS

CEILING FIRES TOP

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

Figure 5.16

WARNING

Fire Risk.

Explosion Risk.

Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

January 3, 2007

Quadra-Fire · Topaz · 7009-113E

Page 17

Image 17
Contents Do Discardnot What to do if you smell gasDo not Discard this Manual Manufactured Date Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Getting Started Design & Installation ConsiderationsInspect Appliance & Components Tools and Supplies NeededSelecting Appliance Location Appliance Location and ClearancesClearances Design Purposes onlyVent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsExceptions for Horizontal Installations How to Use the Vent GraphVenting Guidelines Vertical Distance from Appliance to 90 ElbowType B Rear Installations for Use with Rear Vent Kit Up & Out Installations for Top Vent ConfigurationsHorizontal Termination Type aRear Vent 203mm Step Vertical TerminationDirect Vent Pipe Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Type a Up & Out Installations for Top Vent ConfigurationsCap Retro Connector Converting to LP Gas Gas InformationFuel Conversions Propane Natural GAS Valve Regulator ReplacementPressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthON/OFF Top to Rear Vent Conversion Appliance SetupRemove Shipping Materials Leg Leveling System AccessoriesFor Both Quartet and Solitaire Fronts Front Installation Fronts shipped attached to faceBrick Installation Qty Description Positioning the LogsMineral Wool Blower Installation Glass Door Assembly Replacement31 Blower Wiring Diagram Shutter Adjustment Damper AdjustmentFor TOP or Rear Vent Installations Make adjustmentControls Operating InstructionsBefore Lighting Appliance Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramVent Components Diagram Miscellaneous Vent Components ListItem # Description TopazBRNR-TOPAZ RD. Service Parts List cont’dRV-TPZ-CLG RV-TPZ-CCRRV-TPZ-CSB RV-TPZ-CWLCast Parts Individual Pieces RE. Accessories Warranty Policy This page Intentionally Left Blank Quadra-Fire · Topaz · 7009-113E January 3 This page Intentionally Left Blank Dealer Telephone TopazContact Information