Quadra-Fire 839-1320, 839-1340, 839-1290, 844-4120 owner manual On/Off

Page 28

Thermocouple

Gas Pilot Ignitor

Thermopile

Ignitor

Red 28 in. (711mm)

ON/OFF

Switch

Red 28 in.

(711mm)VALVE

Figure 7.1

CAUTION

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

CAUTION

Shock hazard.

Replace damaged wire with type 105O C rated wire.

Wire must have high temperature insulation.

 

 

 

 

Page 28

Quadra-Fire · Topaz · 7009-113E

January 3, 2007

Image 28
Contents Do not Discard this Manual What to do if you smell gasDo Discardnot Manufactured Date Table of Contents 1Listing and Code Approvals BELOW. Keep Clear of ALL Obstructions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Design & Installation Considerations Getting StartedInspect Appliance & Components Tools and Supplies NeededAppliance Location and Clearances Selecting Appliance LocationClearances Design Purposes only4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Exceptions for Horizontal InstallationsVenting Guidelines Vertical Distance from Appliance to 90 ElbowUp & Out Installations for Top Vent Configurations Type B Rear Installations for Use with Rear Vent KitHorizontal Termination Type aRear Vent 203mm Direct Vent Pipe Vertical TerminationStep Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Type a Up & Out Installations for Top Vent Configurations Existing Masonry ChimneyCap Retro Connector Fuel Conversions Gas InformationConverting to LP Gas Valve Regulator Replacement Propane Natural GASGas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthON/OFF Remove Shipping Materials Appliance SetupTop to Rear Vent Conversion Accessories Leg Leveling SystemBrick Installation Front Installation Fronts shipped attached to faceFor Both Quartet and Solitaire Fronts Positioning the Logs Qty DescriptionMineral Wool Glass Door Assembly Replacement Blower Installation31 Blower Wiring Diagram Damper Adjustment Shutter AdjustmentFor TOP or Rear Vent Installations Make adjustmentBefore Lighting Appliance Operating InstructionsControls For Your Safety Read Before Lighting Lighting ApplianceInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram Vent Components List MiscellaneousTopaz Item # DescriptionRD. Service Parts List cont’d BRNR-TOPAZRV-TPZ-CCR RV-TPZ-CLGRV-TPZ-CSB RV-TPZ-CWLCast Parts Individual Pieces RE. Accessories Warranty Policy This page Intentionally Left Blank Quadra-Fire · Topaz · 7009-113E January 3 This page Intentionally Left Blank Contact Information TopazDealer Telephone