Napoleon Fireplaces NPI40 General Installation, Specifications, Epa Compliance, Heater Placement

Page 10
SPECIFICATIONS

10

 

SPECIFICATIONS

 

 

 

 

Electrical Rating

 

115 Volts, 3.6 Amps, 60Hz

Watts During Start-Up Sequence

 

400 (approximately)

Watts During Operation

 

180 (approximately)

 

 

 

 

NPS40 Width

 

22

3/8"

NPS40 Height

 

30

1/2"

 

 

 

 

NPS40 Depth

 

26

5/8"

 

 

 

Weight

 

210 Pounds

 

 

 

 

Exhaust Collar

 

3"

 

 

 

 

 

Intake Collar

 

2"

 

NPS40 Hopper Cap.

 

55 Pounds

 

 

 

 

NPI40 Hopper Cap.

 

45

Pounds

 

 

 

EPA

 

Exempt

 

 

 

Burn Rate**

 

1.0 to 5.0 (Pounds Per Hour)

 

 

 

BTU/h**

 

8500 to 42500

 

 

 

Minimum Fireplace Opening Size

 

Front: 22 1/2* W x 20 5/8 H x 14 1/4 D

 

 

Back: 20 3/8 W

*In order to install fl ashing fl ush to fi nished wall and centered within the opening the front opening of the fi replace or enclosure must be 32 5/8" wide.

EPA COMPLIANCE

This heater is EPA exempt from Phase II requirements, but has been tested for emissions using EPA test methods by Warnock Hersey.

GENERAL INSTALLATION

PLANNING YOUR INSTALLATION

!WARNING

Read this entire manual before you install and use this heater. failure to follow the instructions may result in

property damage, bodily injury, or even death.

Check with local building offi cials for any permits required for installation of this pellet heater and notify your insurance company before proceeding with installation.

Before installing we recommend placing the heater outside and load 5 pounds of pellets inside the hopper. Plug the heater in and let it run on HIGH until the pellets run out. This will cure the paint and burn off the oils on the steel, there by mini- mizing any smell inside the home.

HEATER PLACEMENT

Have an authorized dealer install the heater. If you install the heater yourself, have your dealer review your installation plans and/or installation.

Draw out a detailed plan of the installation including dimensions and verify the dimensions with the requirements listed in this manual.

For built-in enclosures, when determining the location of the heater, locate the wall studs (for horizontal penetrations). You may wish to adjust the heater position slightly to ensure the vent does not intersect with a framing member.

Heater must be positioned so that no combustibles are within, or can swing within (e.g. drapes, doors), 48" of the front of the heater.

If the heater is placed in a location where the ceiling height is less than 7' above the base of the heater, the installation must follow the requirements in the section "Alcove Installations Requirements"

W415-0616 / C / 06.04.08

Image 10
Contents $10.00 W415-0616 /CW415-0616 /C TABLE of CONTENTS PLEASE RETAIN THIS MANUAL FOR FUTURE REFERENCEWARRANTY CONDITIONS AND LIMITATIONSWARNINGS AND SAFETY PRECAUTIONS W415-0616 /CWARNINGS AND SAFETY PRECAUTIONS W415-0616 /CGENERAL INSTRUCTIONS SPECIFICATIONS HEATING SPECIFICATIONSGENERAL INTRODUCTION PELLET QUALITYFigures 1a-b DIMENSIONSFigures 2a-c DIMENSIONS CONTINUED Figures 3a-cFigures 4a-c DIMENSIONS CONTINUEDNPI40 with AK8 Adapter and GICSK Flashing Shown PLANNING YOUR INSTALLATION GENERAL INSTALLATIONSPECIFICATIONS HEATER PLACEMENTFLOOR PROTECTION REQUIREMENTS INSTALLATION OPTIONSSAFETY FEATURES OUTSIDE AIRMOBILE HOME INSTALLING THE PELLET VENTGENERAL VENTING TYPE OF VENTPELLET VENT TERMINATION ALCOVE INSTALLATION NPS40 ONLYVENTING THE PELLET HEATER Minimum Alcove DimensionsMINIMUM AIR TERMINAL INSTALLATIONS J D ABBFI LG H ECORNER INSTALLATION NPS40 INSTALLATIONSTRAIGHT INSTALLATION MINIMUM CLEARANCE TO COMBUSTIBLESTERMINATION INSTALLATION VENTING INSTALLATION EXAMPLESHORIZONTAL EXHAUST THROUGH WALL INSTALLATION THROUGH WALL WITH VERTICAL RISE AND HORIZONTALMINIMUM INSIDE VERTICAL CLEARANCES CLASS A CHIMNEY RETROFITINSTALLATIONINTOAMASONRYFIREPLACE HEARTH MOUNT INSTALLATIONPRIOR TO INSTALLATION RecommendedMINIMUM MANTEL CLEARANCES NPI40 INSTALLATIONMINIMUM CLEARANCES TO COMBUSTIBLES REAR TO TOP VENT CONVERSION INSTRUCTIONSNPI40 INSTALLATION OVERVIEW VERTICAL LINER INSTALLATION INSTALLATION INTO A MASONRY FIREPLACEHORIZONTAL VENT INSTALLATION PRIOR TO INSTALLATIONPRIOR TO INSTALLATION INSTALLATION INTO A FACTORY BUILT METAL FIREPLACELINER INSTALLATION INSTALLATION INTO A MASONRY FIREPLACEFigure 24a INSTALLATION INTO A COMBUSTIBLE BUILT-INENCLOSUREMINIMUM FRAMING DIMENSIONS Figure 24bNPI40 FINISHING FLASHING INSTALLATIONMINIMUM ENCLOSURE CLEARANCES LIGHTING HEATER MANUALLY INSTALL VIEWING DOOR NPS40 AND NPI40TRIVET NPI40 PROPER PELLET LOADINGSTART-UP OPERATING INSTRUCTIONSSHUT-DOWN CLEANING GLASS DOOR GENERAL MAINTENANCE NPS40 AND NPI40DAILY WHENEVER USING THE HEATER OPEN MAIN VIEWING DOORCLEANING THE HEAT EXCHANGE TUBES MAKE SURE PELLETS ARE NOT PILING UPBI-WEEKLYOR EVERY 10 BAGS OF PELLETS CLEANING THE BURN POTVACUUM FIREBOX VACUUM HOPPER SEMI-ANNUALLYOR EVERY TWO TONS OF PELLETSOOT AND FLY ASH FORMATION CLEAN THE EXHAUST BLOWER CLEAN THE VERTICAL EXHAUST DUCTCLEAN EXHAUST HOUSING INSERT ONLY SEMI-ANNUALLYOR EVERY TWO TONS OF PELLETCLEAN THE VENT CHECK ALL SEALSNORMAL OPERATING SOUNDS WIRING DIAGRAM NPS40 ACCESSORIES REPLACEMENTSCOMMON ACCESSORIES NPI40 ACCESSORIESCOMMON REPLACEMENTS PARTS W415-0616 /CNPS40 REPLACEMENTS PARTS W415-0616 /CNPI40 REPLACEMENTS PARTS W415-0616 /CNPI40 ACCESSORY PARTS COMMON ACCESSORY PARTSSYMPTOM TROUBLESHOOTINGTEST SOLUTION SYMPTOM TROUBLESHOOTING CONTINUEDTEST SOLUTION TEST SOLUTION TROUBLESHOOTING CONTINUEDSYMPTOM Burn pot is cleanSERVICE TECHNICIAN SERVICE AND MAINTENANCE LOGSERVICE DATE SERVICE DESCRIPTIONW415-0616 /C
Related manuals
Manual 40 pages 42.1 Kb