CHECKLIST — INSTALLATION

LOAD CALCULATION

________________

Heating Load (Btuh)

________________

Cooling Load (Btuh)

________________

Furnace Model Selection

 

COMBUSTION AND VENT PIPING

Termination Location

________________

Vent

________________

Roof

________________

Sidewall

 

________________

Combustion--- Air

________________

Roof

________________

Sidewall

________________

Attic

Condensate Drain

________________

Unit Level or Pitched Forward

________________

Internal Tubing Connections

 

Free of Kinks and Traps

________________

External Drain Connection Leak

 

Tight and Sloped

________________

Condensate Trap Primed before

 

Start--- Up

 

Heat Tape Installed if Required

CHECKLIST --- START---UP

________________

Gas Input Rate (Set Within 2

 

percent of Rating Plate)

________________

Temperature Rise Adjusted

Thermostat Anticipator

________________

Anticipator Setting Adjusted or

________________

Cycle Rate (3 Cycles per Hr)

 

Selected

355CAV

________________

Crawl Space

________________

Termination Kit--- 2 Pipe or

 

Concentric

________________

Combustion--- Air Pipe Length

 

________________

Combustion--- Air Pipe Elbow

 

Quantity

________________

Vent Pipe Length

________________

Vent Pipe Elbow Quantity

________________

Pipe Diameter Determined from

 

Sizing Table

________________

Pipe Sloped To Furnace

 

Pipe Insulation

________________

Over Ceilings

________________

Low--- Ambient Exposed Pipes

Safety Controls Check Operation

CHECKLIST --- START---UP

________________

Gas Input Rate (Set Within 2

 

percent of Rating Plate)

________________

Temperature Rise Adjusted

 

Thermostat Anticipator

________________

Anticipator Setting Adjusted or

________________

Cycle Rate (3 Cycles per Hr)

 

Selected

Safety Controls Check Operation

________________

Primary Limit

________________

Pressure Switches

61

Image 61
Contents Installation Instructions Required Notice for Massachusetts Installations Safety Considerations Table of ContentsEnvironmental Hazard Dimensions In. / mm355CAV Clearances to Combustibles Codes and Standards Electrostatic Discharge ESD PrecautionsIntroduction Unit Damage HazardUpflow Application ApplicationsProperty Damage Hazard Carbon Monoxide Poisoning Hazard Condensate Trap Alternate Upflow OrientationCondensate Trap Tubing Alternate Upflow Orientation Condensate Trap Field Drain Attachment Upper Inducer Housing Drain ConnectionCondensate Trap Freeze Protection Condensate Trap Location Downflow ApplicationsHorizontal Left SUPPLY-AIR Discharge Applications Horizontal Left Tube ConfigurationCombustion AIR Intake Vent Construct a Working Platform Property DamageUnit Operation Hazard Condenste Trap Field Drain Attachment Horizontal Right SUPPLY-AIR Discharge ApplicationsLocation Prohibit Installation on BackHazardous Locations Fire or Death HazardFIRE, EXPLOSION, Injury or Death Hazard Installation in Upflow or Downflow Applications InstallationInstallation in Horizontal Applications Leveling Legs If DesiredFurnace, Plenum, and Subbase Installed on a Angle AIR Ducts FIRE, Carbon Monoxide and Poisoning Hazard Fire HazardUnit MAY not Operate Fire or Explosion Hazard Gas PipingRemoving Bottom Closure Panel Electrical Shock Hazard WiringElectrical Shock and Fire Hazard Disconnect Switch and FurnaceFire or Electrical Shock Hazard AccessoriesRemoval of Existing Furnaces from Common Vent Systems Fire and Explosion Hazard AIR for Combustion and VentilationPipe Fittings Cement Description Marked on Primers Combustion-Air and Vent Pipe DiameterFurnace Control Direct Vent Termination Clearance Ventilated Combustion Air Vent Termination Clearance Vent Pipe Termination for Ventilated Combustion Air System Unit Corrosion Hazard Combustion AIR PipeCombustion Air Termination Ventilated Combustion Air Option Attachment of Combustion Air Intake Housing Plug FittingCombustion Air Termination-Direct Vent / 2-Pipe System Vent PipeCarbon Monoxide Poisoning Property Damage Hazard Attachment of Vent Pipe304.8mm minimum 76.2mm minimum Extended Exposed Sidewall Pipes Vent TerminationVent Termination Kit Direct Vent / 2-Pipe System Only Two-Pipe Termination Kit Direct Vent / 2-Pipe System OnlyWinter Design Number of 90 Elbows Btuh Maximum Allowable Pipe Length Ft MDirect Vent 2-Pipe Only Multi-venting and Vent Terminations Condensate DrainApplication Personal Injury HazardAir Conditioning A/C Setup Switches START-UP, Adjustment and Safety CheckContinuous Fan CF Setup Switches Additional Setup Switches SW4Prime Condensate Trap with Water Example of Setup Switch in Off PositionWiring Diagram Furnace Setup Switch Description Inducer Housing Drain TubePurge Gas Lines Sequence of OperationTwo-Stage Thermostat and Two-Stage Medium/High Heating Two-Stage Thermostat and Two-Stage Low / High HeatingThermidistat Mode Continuous Blower Mode Super Dehumidify ModeContinuous Blower Speed Selection from Thermostat Heat PumpStep-Modulating Furnace with Single-Speed Air Conditioning Furnace and Two-Speed Heat Pump Pump Furnace and Two-Speed Air ConditionerRedundant Automatic Gas Valve Set Gas Input RateBurner Orifice Altitude AVG. GAS 675 Burner Flame Altitude Derate Multiplier for USAGas Rate cu Ft/Hr Set Temperature RiseSet Thermostat Heat Anticipator Check Safety Controls ChecklistCheck Pressure Switches Check Primary Limit ControlCombustion and Vent Piping Checklist InstallationCatalog No. II355CAV---060---4
Related manuals
Manual 60 pages 10.1 Kb Manual 14 pages 23.93 Kb

355CAV specifications

The Bryant 355CAV is a state-of-the-art automated vertical machining center designed to enhance precision and efficiency in the manufacturing sector. Renowned for its robust construction, this machine is engineered to handle a broad spectrum of machining tasks, making it suitable for both small and large-scale production environments.

One of the standout features of the Bryant 355CAV is its advanced CNC control system, which provides users with exceptional ease of use. The intuitive user interface allows operators to program complex machining operations with minimal effort, significantly reducing setup times. The machine's high-speed spindle achieves impressive rotational speeds, which allows for quick material removal, ultimately optimizing productivity and throughput.

The Bryant 355CAV exhibits superior rigidity and stability due to its solid cast iron frame and carefully designed structural components. This construction minimizes vibrations during machining, ensuring that even the most intricate parts are produced with high accuracy. The machine's precision ground linear guideways further enhance its performance by providing smooth motion and high load capacity.

Equipped with a large work envelope, the Bryant 355CAV enables manufacturers to accommodate various part sizes and geometries. Additionally, its automatic tool changers can hold a variety of tools, thus facilitating quick transitions between different machining operations without requiring manual intervention. This flexibility is essential for meeting the diverse needs of modern manufacturing.

Another notable characteristic of the Bryant 355CAV is its energy-efficient design. It integrates modern technologies aimed at reducing power consumption while maintaining optimum performance. This environmentally conscious approach not only cuts operational costs but also aligns with the growing demand for sustainable manufacturing practices.

Moreover, the Bryant 355CAV features advanced monitoring capabilities, allowing operators to track machine performance in real time. Data analytics from these systems can be utilized to improve operational efficiency, reduce downtime, and enhance predictive maintenance protocols.

In summary, the Bryant 355CAV is a versatile, high-performance machining center that showcases cutting-edge features and technologies. Its combination of user-friendly controls, sturdy construction, energy efficiency, and advanced monitoring positions it as a vital asset for manufacturers aiming to elevate their productivity and precision in an increasingly competitive landscape.