Bryant 355CAV installation instructions Location, Prohibit Installation on Back

Page 16

355CAV

NOTE: See Fig. 14 or tube routing label on main furnace door to check for proper connections.

Relocate tubes as described below.

1.Disconnect collector box pressure tube (pink label) at- tached to pressure switch.

2.Extend collector box pressure tube (green label) which was previously connected to condensate trap relief port connection by splicing to small diameter tube (factory- supplied in loose parts bag.)

3.Connect collector box pressure tube (green label) to pres- sure switch connection labeled COLLECTOR BOX.

4.Use remaining small diameter tube (factory-supplied in loose parts bag) to extend collector box pressure tube (pink label) which was previously connected to pressure switch.

5.Route this extended tube (pink label) to condensate trap relief port connection.

6.Determine appropriate Length, cut, and connect tube.

7.Clamp tube to relief port connection.

Condensate Trap Freeze Protection

Refer to condensate Drain Protection section for recommendations and procedures.

Construct a Working Platform

Construct working platform where all required furnace clearances are met. (See Fig. 3 and 12 or 13.)

!CAUTION

UNIT OPERATION HAZARD

Snot be installed directly on any combustible material other than wood flooring (refer to SAFETY CONSIDERATIONS).

Sbe located so combustion-air and vent pipe maximum lengths are not exceeded. Refer to Table 7.

Sbe located where available electric power and gas sup- plies meet specifications on the furnace rating plate.

Sbe attached to an air distribution system and be located as close to the center of the distribution system as pos- sible. Refer to Air Ducts section.

Sbe provided with ample space for servicing and clean- ing. Always comply with minimum fire protection clearances shown on the furnace clearance-to-com- bustibles label. (See Fig. 3.)

This furnace may be located in a confined space without special provisions for dilution or ventilation air.

NOTE: For upflow/downflow applications install furnace so that it is level or pitched and forward within 1/2-in. (13 mm) for proper furnace operation. For horizontal applications pitch 1/4-in. (6 mm) minimum to 1/2-in. (13 mm) maximum forward to ensure proper condensate drainage from secondary heat exchangers. (See Fig. 15.)

When a furnace is installed so that supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by ducts sealed to furnace casing. The ducts terminate outside the space containing the furnace to ensure there will not be a negative pressure condition within equipment room or space.

Failure to follow this caution may result in intermittent unit operation.

The condensate trap MUST be installed below furnace. See Fig. 6 for dimensions. The drain connection to condensate trap must also be properly sloped to an open drain.

NOTE: A 12-in. (305 mm) minimum offset pipe section is recommended with short (5 to 8 ft. or 1.5M to 2.4M) vent systems. This recommendation is to reduce excessive condensate droplets from exiting the vent pipe. (See Fig. 12, 13, or 44.)

LOCATION

General

This furnace must

FRONT

BACK

FRONT

B￿

A￿

C￿

K

A93043

Sbe installed so the electrical components are protected from water.

Fig. 16 - Prohibit Installation on Back

16

Image 16
Contents Installation Instructions Required Notice for Massachusetts Installations Table of Contents Safety ConsiderationsDimensions In. / mm Environmental Hazard355CAV Clearances to Combustibles Electrostatic Discharge ESD Precautions Codes and StandardsIntroduction Unit Damage HazardUpflow Application ApplicationsProperty Damage Hazard Carbon Monoxide Poisoning Hazard Condensate Trap Alternate Upflow OrientationCondensate Trap Tubing Alternate Upflow Orientation Condensate Trap Field Drain Attachment Upper Inducer Housing Drain ConnectionCondensate Trap Freeze Protection Downflow Applications Condensate Trap LocationHorizontal Left Tube Configuration Horizontal Left SUPPLY-AIR Discharge ApplicationsCombustion AIR Intake Vent Construct a Working Platform Property DamageUnit Operation Hazard Horizontal Right SUPPLY-AIR Discharge Applications Condenste Trap Field Drain AttachmentProhibit Installation on Back LocationHazardous Locations Fire or Death HazardFIRE, EXPLOSION, Injury or Death Hazard Installation Installation in Upflow or Downflow ApplicationsInstallation in Horizontal Applications Leveling Legs If DesiredFurnace, Plenum, and Subbase Installed on a Angle AIR Ducts FIRE, Carbon Monoxide and Poisoning Hazard Fire HazardUnit MAY not Operate Gas Piping Fire or Explosion HazardRemoving Bottom Closure Panel Wiring Electrical Shock HazardDisconnect Switch and Furnace Electrical Shock and Fire HazardFire or Electrical Shock Hazard AccessoriesRemoval of Existing Furnaces from Common Vent Systems AIR for Combustion and Ventilation Fire and Explosion HazardCombustion-Air and Vent Pipe Diameter Pipe Fittings Cement Description Marked on PrimersFurnace Control Direct Vent Termination Clearance Ventilated Combustion Air Vent Termination Clearance Vent Pipe Termination for Ventilated Combustion Air System Combustion AIR Pipe Unit Corrosion HazardAttachment of Combustion Air Intake Housing Plug Fitting Combustion Air Termination Ventilated Combustion Air OptionVent Pipe Combustion Air Termination-Direct Vent / 2-Pipe SystemCarbon Monoxide Poisoning Property Damage Hazard Attachment of Vent Pipe304.8mm minimum 76.2mm minimum Vent Termination Extended Exposed Sidewall PipesVent Termination Kit Direct Vent / 2-Pipe System Only Two-Pipe Termination Kit Direct Vent / 2-Pipe System OnlyWinter Design Maximum Allowable Pipe Length Ft M Number of 90 Elbows BtuhDirect Vent 2-Pipe Only Condensate Drain Multi-venting and Vent TerminationsApplication Personal Injury HazardSTART-UP, Adjustment and Safety Check Air Conditioning A/C Setup SwitchesContinuous Fan CF Setup Switches Additional Setup Switches SW4Example of Setup Switch in Off Position Prime Condensate Trap with WaterWiring Diagram Inducer Housing Drain Tube Furnace Setup Switch DescriptionSequence of Operation Purge Gas LinesTwo-Stage Thermostat and Two-Stage Low / High Heating Two-Stage Thermostat and Two-Stage Medium/High HeatingThermidistat Mode Super Dehumidify Mode Continuous Blower ModeContinuous Blower Speed Selection from Thermostat Heat PumpStep-Modulating Furnace with Single-Speed Air Conditioning Pump Furnace and Two-Speed Air Conditioner Furnace and Two-Speed Heat PumpSet Gas Input Rate Redundant Automatic Gas ValveBurner Orifice Altitude AVG. GAS 675 Altitude Derate Multiplier for USA Burner FlameGas Rate cu Ft/Hr Set Temperature RiseSet Thermostat Heat Anticipator Checklist Check Safety ControlsCheck Pressure Switches Check Primary Limit ControlChecklist Installation Combustion and Vent PipingCatalog No. II355CAV---060---4
Related manuals
Manual 60 pages 10.1 Kb Manual 14 pages 23.93 Kb

355CAV specifications

The Bryant 355CAV is a state-of-the-art automated vertical machining center designed to enhance precision and efficiency in the manufacturing sector. Renowned for its robust construction, this machine is engineered to handle a broad spectrum of machining tasks, making it suitable for both small and large-scale production environments.

One of the standout features of the Bryant 355CAV is its advanced CNC control system, which provides users with exceptional ease of use. The intuitive user interface allows operators to program complex machining operations with minimal effort, significantly reducing setup times. The machine's high-speed spindle achieves impressive rotational speeds, which allows for quick material removal, ultimately optimizing productivity and throughput.

The Bryant 355CAV exhibits superior rigidity and stability due to its solid cast iron frame and carefully designed structural components. This construction minimizes vibrations during machining, ensuring that even the most intricate parts are produced with high accuracy. The machine's precision ground linear guideways further enhance its performance by providing smooth motion and high load capacity.

Equipped with a large work envelope, the Bryant 355CAV enables manufacturers to accommodate various part sizes and geometries. Additionally, its automatic tool changers can hold a variety of tools, thus facilitating quick transitions between different machining operations without requiring manual intervention. This flexibility is essential for meeting the diverse needs of modern manufacturing.

Another notable characteristic of the Bryant 355CAV is its energy-efficient design. It integrates modern technologies aimed at reducing power consumption while maintaining optimum performance. This environmentally conscious approach not only cuts operational costs but also aligns with the growing demand for sustainable manufacturing practices.

Moreover, the Bryant 355CAV features advanced monitoring capabilities, allowing operators to track machine performance in real time. Data analytics from these systems can be utilized to improve operational efficiency, reduce downtime, and enhance predictive maintenance protocols.

In summary, the Bryant 355CAV is a versatile, high-performance machining center that showcases cutting-edge features and technologies. Its combination of user-friendly controls, sturdy construction, energy efficiency, and advanced monitoring positions it as a vital asset for manufacturers aiming to elevate their productivity and precision in an increasingly competitive landscape.