Kenmore 153.332890HA, 153.33296, 153.332870HA Approximate Setting Time For 2 to 3 Pipe, Joints

Page 21

Installation Instructions (cont'd)

APPROXIMATE SETTING TIME

FOR 2" TO 3" PIPE

INSTALLATION SHOWING USE OF PVC, ABS OR

JOINTS

 

CPVC PIPE

MOVEMENT

COMPLETE

 

 

 

OF

JOINT

SET

90°F

to

150°F

% hr.

8 hrs.

50°F

to

90°F

I hr.

15 hrs.

_. EXTERIOR

SEALER _// _"_ WALL

HIN EXTENSION

......THROUG H

0°F to 50°F

1% hr.

18 hrs.

SILICONE

J_ _

EXTERIOR WALL

 

 

 

 

_/

_

SCREW

CUTTING OPENING THROUGH AN OUTSIDE

WALL AND COLLAR INSTALLATION

After reading the manual and you have determined the location

of the op,eningin the wall, (using the draw!ng below), cut a 2_" hole for 2 vent piping or a 3_' hole for 3 vent piping through an exterior wall.

NOTE: When determining location of the opening in the outside wall allow for the ¼° rise per five feet that has taken

place in the horizontal run.

" '" ""

I N

PER FIVE FEET

L

 

 

40 GAL.- 59½"

50 GAL.- 6(7'

N

The 3" (or optional 2") PVC, ABS, or CPVC Schedule 40 vent pipe can be run from the water heater through the wall or from the wall to the water heater, whichever is most convenient. The vent pipe must extend a minimum of 1_" through the exterior wall. Extending the vent cap as far as possible from the surface of the exterior wall will help minimize discoloration of the wall in this area which may be caused by the flue gases. Note that the inside collar must be slipped over the vent piping before locat- ing the pipe through the wall. Before securing the inside and outside collars to the wall, use a silicone sealer between pipe and opening to insure a water and air tight seal.

 

 

VENT CAP MUST

SEALER

_

BE POSITIONIED

 

/

DOWNWARD

CONNECTING PVC, ABS OR CPVC PIPE VENT TO

BLOWER

1.If making an immediate horizontal run of vent off'the blower, a Y' PVC, ABS or CPVC Schedule 40 (supplied locally) elbow is required. Place the elbow in the required direction on the blower and using 3 sheet metal screws, attach the elbow.

SEAL WITH

_

_

_" _"

I

2.If there is to be a vertical run of vent from the blower, the Y'

PVC, ABS or CPVC pipe must be attached to the blower using 3 sheet metal screws.

SEAL WITH

 

 

RTV SEALANT

_

_"

3.If the optional 2" ventpiping is to used, the 2" street elbow, Y' to 2" reducer and Y' (minimum) section of 3" PVC, ABS or

CPVC pipe must be supplied locally.The 3" (minimum) section of 3' PVC, ABS or CPVC p'pe must be attached to the blower using 3 sheet metal screws.

21

Image 21
Contents For Your Safety What to do if YOU Smell GASModel Numbers Awarningj Safety PrecautionsLwarning AwarningRious Bodily INJURY, or Property Damage Safety Precautions contdAwarning DcmgPn%aticaoe ContentsCustomer Responsibilities Product SpecificationsMaterials and Basic Tools Needed Additional Tools Needed When Sweat SolderingMaterials Needed Basic ToolsRemoving the Old Water Heater Installation InstructionsInstallation Instructions contd Installations in Areas Where Flammable LIQFacts to Consider About the Location Combustion Air and Ventilation Facts to Consider About the Location contdVenting Clearances Property DamageInlet Venting Through Roof- ClearancesInches Top and one commencing Within 12 inches From Installation Completed Installation InstructionsContd Water PipingII \ PROVIDEA6AIR \ GAP Between Temperature-Pressure Relief ValveUSE Without Power Cord WiringFilling the Water Heater Water Heaters Equipped for ONE Type VoltageWiring contd USE Without Power Cord contdWiring Diagram Venting Warn I NGpreVenting Through AN Outside Wall ALL Models Venting System Example Installations for ALL Models ALL Models Optional 2VENT PipingPVC, ABS or Cpvc Schedule 40 vent piping MAX. Length Elbows DIA.VENTII0 DIA.VENT Number of 90 DEG MAX. Length FT ElbowsDIA.VENT Number of 90 DEG PrecautionsDIA.VENT Number MAX. Length FT ElbowsJoints Approximate Setting Time For 2 to 3 PipeVenting Through a Roof ALL Models 3PVC, ABS or Cpvc Schedule 40 vent pipingALL Models Optional 2 Vent Piping Gas Piping Gas Piping contd GAS Piping with Flexible ConnectorSediment Trap GAS Piping with ALL Black Iron Pipe To GAS ControlCheck for Leaks Installation ChecklistModel Rating Plate Before OperatingOperating Instructions Before the Water Heater will OperateOperation Before Operating Propane L.P. GAS Operating Instructions contdControl Sequence HOT Surface Direct Ignition Check for LeaksWith an ignition device which automatically Contd Temperature RegulationTank Sediment Cleaning Service and AdjustmentBurner Cleaning Venting System InspectionDrain Valve Washer Replacement Temperature-Pressure ReliefDraining TEM Peratu RE-PRESSURE Discharge PipeStart Up Conditions Troubleshooting GuideThermal Expansion Strange SoundsCondensation Troubleshooting Guide contdSMOKE/ODOR AIR in HOT Water FaucetsHigh Temperature Limit Switch Venting Manual Reset SwitchOperational Conditions contd Not Enough or no HOT WaterLeakage Checkpoints Thermostat and GAS Supply Check Systems Check Error in the hot surface ignitorcircuitCondensation Water Leaks Leaking T&P HOT Water Odors ¢Te= Blower will not runPage Parts Order List Economizer TM 6 Power Vent GAS Water Heater Model NumbersKEY NO. Part Description Parts Order List contdParts Order List 153.332960 153.332970HA 153.332980 153.332990HA Master Protection Agreements Sears Installation Service