Kenmore 153.332990HA Operating Instructions, Before the Water Heater will Operate, Operation

Page 26

Operating Instructions

This water heater is equipped with an electrically operated vent- ing system and electronic control. For the burner to come on, the water heater thermostat must call for heat. Then the system

will begin sequencing, each section proving itself before gas is allowed to flow to the burner.

BEFORE THE WATER HEATER WILL OPERATE:

1.The control system must be connected to a grounded 110/120 volt power supply. The control system has an over- all rating of 2 amps. The water heater must be securely and

adequately grounded in accordance with local codes and with the current edition of the National Electrical Code ANS1/NFPA 70.

2.The ON/OFF rocker switch, located on the control box

above the thermostat must be in the "ON" position for the electrical control system to operate allowing the gas portion to operate (ignite burner).

3.The venting manual reset switch must be in the closed position. See "Venting Manual Reset Switch" in the "'ii-oubleshooting Guide" section.

4.There is a non-resettable hi-limit switch in the thermostat,

which must be good (closed) for the thermostat to be operat-

ed. See "High Temperature Limit Switch" in the "_I_oubleshooting Guide" section.

OPERATION

When the thermostat calls for heat, gas is allowed to flow to a (N/O) pressure switch closing it. An electrical circuit is then made to the blower, turning it on. When the blower has achieved sufficient venting, the air pressure switch will close. A 120 volt circuit will be completed through the venting manual reset switch and on to the 120 volt gas valve. The 120 volt gas valve will open allowing gas to flow to the burner. The hot sur- face ignitor will establish a main burner flame.

 

VENTING MANUAL

BLOWER MOTOR

RESET SWITCH

DRAFT HOOD

ON/OFF SWITCH

AIR PRESSURE

AIR INTAKE

\ CH

 

_ '

120V GAS VALVE

BURNER

_'/7HOTSURFACE

26

Image 26
Contents Model Numbers For Your SafetyWhat to do if YOU Smell GAS Lwarning Safety PrecautionsAwarningj AwarningSafety Precautions contd Rious Bodily INJURY, or Property DamageAwarning Contents DcmgPn%aticaoeProduct Specifications Customer ResponsibilitiesMaterials Needed Additional Tools Needed When Sweat SolderingMaterials and Basic Tools Needed Basic ToolsInstallation Instructions Removing the Old Water HeaterFacts to Consider About the Location Installation Instructions contdInstallations in Areas Where Flammable LIQ Venting Clearances Facts to Consider About the Location contdCombustion Air and Ventilation Property DamageVenting Through Roof- Clearances InletInches Top and one commencing Within 12 inches From Contd Installation InstructionsInstallation Completed Water PipingTemperature-Pressure Relief Valve II \ PROVIDEA6AIR \ GAP BetweenFilling the Water Heater WiringUSE Without Power Cord Water Heaters Equipped for ONE Type VoltageWiring Diagram Wiring contdUSE Without Power Cord contd Venting Through AN Outside Wall ALL Models VentingWarn I NGpre PVC, ABS or Cpvc Schedule 40 vent piping Venting System Example Installations for ALL ModelsALL Models Optional 2VENT Piping II0 DIA.VENTMAX. Length Elbows DIA.VENT Number of 90 DEG MAX. Length FT ElbowsDIA.VENT Number PrecautionsDIA.VENT Number of 90 DEG MAX. Length FT ElbowsApproximate Setting Time For 2 to 3 Pipe JointsALL Models Optional 2 Vent Piping Venting Through a Roof ALL Models3PVC, ABS or Cpvc Schedule 40 vent piping Gas Piping Sediment Trap GAS Piping with Flexible ConnectorGas Piping contd GAS Piping with ALL Black Iron Pipe To GAS ControlModel Rating Plate Installation ChecklistCheck for Leaks Before OperatingOperation Operating InstructionsBefore the Water Heater will Operate Control Sequence HOT Surface Direct Ignition Operating Instructions contdBefore Operating Propane L.P. GAS Check for LeaksWith an ignition device which automatically Temperature Regulation ContdBurner Cleaning Service and AdjustmentTank Sediment Cleaning Venting System InspectionDraining Temperature-Pressure ReliefDrain Valve Washer Replacement TEM Peratu RE-PRESSURE Discharge PipeThermal Expansion Troubleshooting GuideStart Up Conditions Strange SoundsSMOKE/ODOR Troubleshooting Guide contdCondensation AIR in HOT Water FaucetsOperational Conditions contd Venting Manual Reset SwitchHigh Temperature Limit Switch Not Enough or no HOT WaterLeakage Checkpoints Thermostat and GAS Supply Check Error in the hot surface ignitorcircuit Systems Check¢Te= Blower will not run Condensation Water Leaks Leaking T&P HOT Water OdorsPage Economizer TM 6 Power Vent GAS Water Heater Model Numbers Parts Order ListParts Order List contd KEY NO. Part DescriptionParts Order List 153.332960 153.332970HA 153.332980 153.332990HA Sears Installation Service Master Protection Agreements