Heat & Glo LifeStyle SUPREME-I30-SP Installing Adaptor and Termination Cap, Masonry Factory Built

Page 24

F. Installing Adaptor and Termination Cap

For installation of termination cap see minimum vent heights for various pitched roofs (see Figure 8.5) .

To install adaptor see Figure 8.6.

HORIZONTAL

OVERHANG

CAUTION! Risk of Cuts/Abrasions/Flying Debris.

Wear protective gloves and safety glasses during instal- lation. Sheet metal edges are sharp.

Damper Flashing Kit (Optional)

For use with LINK-DV30B or LINK-DV4-30B Liner Kit. Note: Damper may have to be removed to use this kit.

Run flex liners through 3 in. holes in damper flashing.

Attach damper flashing to firebox roof with self tapping

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

VERTICAL

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

screws included in kit.

CLASS A PIPE

Roof Pitch

H (Min.) Ft.

Flat to 6/12

....................

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5*

Over 10/12 to 11/12

3.25

Roof Pitch

H (Min.) Ft.

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

Figure 8.6

* 3 foot minimum in snow regions

Figure 8.5 Minimum Height from Roof to Lowest Discharge Opening

To prevent odors and cold drafts, the chimney must be sealed around the vent with non-combustible blanket insulation or field fabricated metal plates.

Note: The LINK-DV4-30B

system REQUIRES this insulation.

Masonry

 

Factory Built

LINK-DV30B

LINK-DV4-30B

Installation

Installation

Wood Burning

 

 

TERMINATION

 

 

OPTIONAL LINK-ZC-ADPB

 

 

CAP

 

 

 

FOR USE WITH CLASS A

 

EXHAUST

 

 

EXHAUST

 

WOODBURNING PIPE

 

AIR

 

 

AIR

 

 

 

VENT PIPE

 

 

VENT PIPE

 

 

 

 

OR

WARNING:

 

 

 

 

 

 

 

 

 

 

 

 

DO NOT BLOCK

 

 

 

 

 

 

THIS PIPE END!

 

 

 

 

 

 

Note: Untwist the

 

 

 

 

 

 

pipe while extend-

 

 

 

 

 

 

ing it, to achieve full

 

 

 

 

 

 

30’ length.

 

 

 

INLET AIR

 

 

INLET AIR

Remove 18 inch x 18 inch flashing on cap by removing 3

 

 

 

VENT PIPE

 

VENT PIPE

 

 

screws. Connect both the LINK-ZC-ADPB to Class A Pipe

 

 

 

 

Figure 8.7

 

 

 

 

and the termination cap to the LINK-ZC-ADPB with the

 

 

 

 

self tapping screws provided.

 

24

Heat & Glo

Grand-I35, Grand-I35-SP, Supreme-I30, Supreme-I30-SP2206-900 Rev. K

• 6/11

Image 24
Contents Models What to do if you smell gasDo Discardnot Congratulations Homeowner Reference InformationTable of Contents User GuideLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesIPI Battery Tray/Battery Installation Clear SpaceModule Reset  Nine Hour Safety Shutdown FeatureBefore Lighting Fireplace Lighting Instructions IPI Final inspection byLighting Instructions Standing Pilot Ignition Do not Connect 110 VAC to the Control ValveFrequently Asked Questions After Appliance is LitMaintenance and Service Maintenance Tasks-Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxBurner Ignition and Operation Standing Pilot Flame PatternsGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Fireplace Size Requirements Minimum Fireplace OpeningTOP View Front View Side View Mantel and Wall Projections Side View TOP ViewTermination Locations Vent Termination Minimum ClearancesInstallation Preparation Installing Vent Pipe and Appliance Connecting Vent PipeVent Limits Venting ComponentsPlacing, Securing and Leveling the Appliance Standing Pilot ModelsIPI Models Installing Adaptor and Termination Cap Masonry Factory BuiltDamper Flashing Kit Optional Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Standing Pilot Ignition System WiringIntelliFire Plus Ignition System Wiring Electrical InformationOptional Wall Switch Rocker Thermostat or Remote ThermocoupleOptional Accessories Requirements FAN BladesFan Wiring with Remote See .H for control module operation instructionsFinishing Clearances to Mantels or other Combustibles above ApplianceAppliance Setup Log Set Assembly LOGS-I35 Models GRAND-I35, GRAND-I35-SP Install the Log AssemblyLOG Support Pilot Grate Tines Bracket Grate BAR LOG Groove Flat Spot for Grate BAR END of LOG Rests On Flat Spot Flat Spot forLOG #6 LOG #6 Resting on Flat Spots LOG #7 Resting on Flat Spots Log #6 G. Install the Log Assembly LOG Support LOG Rests on Grate TineSlot Corner LOG Flush With Pilot Bracket For LOG #5Flat Spots Points of LOG Rest on For LOG #6Air Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Causes Corrective ActionStanding Pilot Ignition System Troubleshooting Symptom Possible Cause Corrective ActionShorts in the wiring IntelliFire Plus Ignition SystemAppliance Dimension Diagram Reference MaterialsVent Kits Components Direct Vent Flex Liner KitsService Parts Log Set AssemblyStocked At DepotService Parts SUPREME-I30, SUPREME-I30-SP Metal Insert, IPI#19 IPI Valve Assembly GRAND-I35SUPREME-I30 Service Parts GRAND-I35-SP, SUPREME-I30-SP #19 Standing Pilot Valve AssemblyService Parts List Standing Pilot Conversion KitsIPI Conversion Kits Contact Information