Heat & Glo LifeStyle XLR-PLUS-N-AU manual Framing and Clearances, Selecting Appliance Location

Page 19

5 Framing and Clearances

A. Selecting Appliance Location

NOTICE: Illustrations reflect typical installations and are

When selecting a location for the appliance it is important to

FOR DESIGN PURPOSES ONLY. Illustrations/diagrams

are not drawn to scale. Actual installation may vary due to

consider the required clearances to walls (see Figure 5.1).

individual design preference.

WARNING! Risk of Fire or Burns! Provide adequate

 

clearance around air openings and for service access.

 

Due to high temperatures, the appliance should be locat-

 

ed out of traffic and away from furniture and draperies.

 

A

E

254 mm

D*

 

A

ALCOVE

B

INSTALLATION

C

TOP VENT

 

ONE 90º ELBOW

TOP VENT

ONE 90° ELBOW

B

F

 

A

B

C

D*

E

F

Inches

53-1/8

48

75-3/16

See Section D.

19-5/16

17-3/4

Figure 5.5 & 5.6

 

 

 

 

 

 

Millimeters

1350

1220

1910

See Section D.

490

450

Figure 5.5 & 5.6

 

 

 

 

 

 

Figure 5.1 Appliance Locations

Heat & Glo • XLR-PLUS-N-AU, XLR-PLUS-PB-AU2264-900 Rev. M • 7/12

19

Image 19
Contents SAI Global Ref No GSCS20194 AS45532008What to do if you smell gas Models XLR-PLUS-N-AU XLR-PLUS-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsFinishing Appliance SetupTroubleshooting Component AccessLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches IPI Battery Tray/Battery InstallationFinal inspection by Lighting Instructions IPIAGE 110/120 VAC or 220/240 Control Module Operation Nine Hour Safety Shutdown FeatureInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Control Compartment and Firebox Top Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly Inspection FireboxTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFront Side Finishing Detail Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Mantel Leg Combustible/Non-CombustibleVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum H1 Maximum Top Vent Horizontal Termination Venting with 1 elbowMinimum H1 + H2 Maximum Top Vent Horizontal Termination Venting with 2 elbowsExhaust Restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 13.4 m 44 ftV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 17 Venting through the Wall Install Horizontal Termination CapPropane Butane Gas InformationGas Connection Natural GasValve Pressure Taps Access Through the Valve AssemblyOptional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsJunction Cord Information Electrical Service and Repair BlowerFireplace Specific Information Kit ContentsIntroduction Determine Location Installation PrecautionsChanging Temperature Scale Installation of Remote Control HousingFan Installation AUX300CE Module InstallationProgramming the RC300AU to the Control Module Function Buttons Idle When Remote is in on ModeStandby mode Display ScreenAdjusting Fan Speed About on ModeAbout OFF Mode Adjusting Flame HeightPower Outage Adjusting ThermostatAdjusting Timer Setting the Child LockSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFinishing Instructions Non-Combustible Materials SpecificationFinishing Framing and Finishing InstructionsFinishing Details Painting Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard Gas Pipe RequirementsTOP View Unlimited Overlap Fit Method Tonic or Martini Decorative Front Facing MaterialInside and Overlap Method See .C Decorative FrontsSee Figures 13.15 Dimensions of Tonic Decorative FrontAppliance Setup Media Options Air Shutter SettingVerify Performance of Appliance Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Ues to spark, and main Frequently Asked Questions/Troubleshooting Component Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksDVP-HPC Cap Brick Extension Vent Components DiagramsSupport SLP-45 45 ElbowSLP90- 90 Elbow Ceiling FirestopSupport Box-Black SnorkelSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-PLUS-N-AU, XLR-PLUS-PB-AU Service Parts#15 Valve Assembly XLR-PLUS-N-AU, XLR-PLUS-PB-AU Service Parts ListContact Information