Top Vent - Vertical Termination
Venting with 3 elbows
V1 Minimum | H1 + H2 Maximum | V2 | V1 + V2 Minimum |
90° Elbow | 1 ft. (305 mm) | * | * |
1 ft. (305 mm) | 2 ft (610 mm) | * | * |
2 ft. (610 mm) | 5 ft. (1.2 m) | * | * |
3 ft. (914 mm) | 6 ft. (1.8 m) | * | * |
4 ft. (1.2 m) | 14 ft. (4.3 m) | * | * |
| H Max. = 14 ft. (4.3 m) |
|
|
V1 + V2 + H1 + H2 Max. = 40 ft. (12.2 m)
* No specific restrictions on this value EXCEPT V1 + V2 + H1 + H2 cannot exceed 40 ft. (12.2 m)
|
| Note: Use SLP Series |
| |
|
| components only. |
| |
|
|
|
|
|
|
|
|
| |
|
|
| Note: All appliances that will burn butane must have | |
V2 |
|
| a 12 in. (305 mm) vertical section of pipe before | |
|
|
|
| any other venting. |
|
|
|
|
|
|
|
|
|
|
H1
H2
V1
INSTALLED
HORIZONTALLY
Figure 7.9
Heat & Glo • | 29 |