Heat & Glo LifeStyle XLR-PLUS-N-AU manual Top Vent Vertical Termination Venting with 3 elbows

Page 29

Top Vent - Vertical Termination

Venting with 3 elbows

V1 Minimum

H1 + H2 Maximum

V2

V1 + V2 Minimum

90° Elbow

1 ft. (305 mm)

*

*

1 ft. (305 mm)

2 ft (610 mm)

*

*

2 ft. (610 mm)

5 ft. (1.2 m)

*

*

3 ft. (914 mm)

6 ft. (1.8 m)

*

*

4 ft. (1.2 m)

14 ft. (4.3 m)

*

*

 

H Max. = 14 ft. (4.3 m)

 

 

V1 + V2 + H1 + H2 Max. = 40 ft. (12.2 m)

* No specific restrictions on this value EXCEPT V1 + V2 + H1 + H2 cannot exceed 40 ft. (12.2 m)

 

 

Note: Use SLP Series

 

 

 

components only.

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: All appliances that will burn butane must have

V2

 

 

a 12 in. (305 mm) vertical section of pipe before

 

 

 

 

any other venting.

 

 

 

 

 

 

 

 

 

 

H1

H2

V1

INSTALLED

HORIZONTALLY

Figure 7.9

Heat & Glo • XLR-PLUS-N-AU, XLR-PLUS-PB-AU2264-900 Rev. M • 7/12

29

Image 29
Contents What to do if you smell gas Ref No GSCS20194 AS45532008SAI Global Models XLR-PLUS-N-AU XLR-PLUS-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access FinishingLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyIPI Battery Tray/Battery Installation Clear SpaceAGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by Control Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Front Side Finishing DetailVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum H1 Maximum Top Vent Horizontal Termination Venting with 1 elbow Minimum H1 + H2 Maximum Top Vent Horizontal Termination Venting with 2 elbowsExhaust Restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 13.4 m 44 ftV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 17 Venting through the Wall Install Horizontal Termination CapGas Connection Gas InformationNatural Gas Propane ButaneValve Pressure Taps Access Through the Valve AssemblyIntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationJunction Cord Information Electrical Service and Repair BlowerIntroduction Kit ContentsFireplace Specific Information Changing Temperature Scale Installation PrecautionsInstallation of Remote Control Housing Determine LocationProgramming the RC300AU to the Control Module AUX300CE Module InstallationFan Installation Standby mode Idle When Remote is in on ModeDisplay Screen Function ButtonsAbout OFF Mode About on ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Timer Adjusting ThermostatSetting the Child Lock Power OutageSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFinishing Details Finishing Around Opening with Gypsum Wallboard Finish and Sealing JointsGas Pipe Requirements PaintingTOP View Unlimited Overlap Fit Method Tonic or Martini Decorative Front Facing MaterialInside and Overlap Method See .C Decorative FrontsSee Figures 13.15 Dimensions of Tonic Decorative FrontAppliance Setup Verify Performance of Appliance Air Shutter SettingMedia Options IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Frequently Asked Questions/Troubleshooting Component Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksDVP-HPC Cap Brick Extension Vent Components DiagramsSLP90- 90 Elbow SLP-45 45 ElbowCeiling Firestop SupportSupport Box-Black SnorkelSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-PLUS-N-AU, XLR-PLUS-PB-AU Service Parts#15 Valve Assembly XLR-PLUS-N-AU, XLR-PLUS-PB-AU Service Parts ListContact Information