D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing or finishing material closer than the minimums listed must be construct- ed entirely of noncombustible materials (i.e., steel studs, concrete board, etc).

Mantels (Combustible/Non-Combustible)

3/8 in. (10 mm)

 

Thick Wall

 

Sheathing

12 in. (300 mm)

 

 

MAX.

MEASUREMENT

14-1/8 in FROM TOP OF

(360 mm) FIREPLACE MIN. OPENING

Figure 5.3 Clearances To Combustible Mantels Or Other Combustibles Above Appliance

Note: For non-combustible fireplace finish material (marble, stone, etc) specifications refer to Section 13.

Mantel Leg (Combustible/Non-Combustible)

TOP VIEW

3-1/8 in.

(80 mm) UNLIMITED MINIMUM

Figure 5.4 Mantel Leg or Wall Projections (Acceptable on both sides of opening)

Front Side Finishing Detail

 

1-1/8 in. (30 mm)

 

FRAMING

 

1-1/2 in. (37 mm)

 

3/8 in (10 mm) BUILDING MATERIAL

Figure 5.5

Front Side Finishing Detail

 

3-1/2 in.

 

(89 mm)

3/8 in. (10 mm) THICK

WALL SHEATHING

NON-COMBUSTIBLE

BOARD SHIPPED

WITH APPLIANCE

1 in.

(25 mm)

1 in. (25 mm)

Figure 5.6 Non-Combustible Zone

Note: AIR SPACE denoted in Figure 5.6 is defined by the nailing tabs and top metal standoffs.

Heat & Glo • XLR-PLUS-N-AU, XLR-PLUS-PB-AU2264-900 Rev. M • 7/12

21

Image 21
Contents Ref No GSCS20194 AS45532008 SAI GlobalWhat to do if you smell gas Models XLR-PLUS-N-AU XLR-PLUS-PB-AU Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access FinishingLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyIPI Battery Tray/Battery Installation Clear SpaceLighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Control Module Operation Nine Hour Safety Shutdown FeatureFrequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting Started Design and Installation Considerations Tools and Supplies Needed Inspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Front Side Finishing DetailVent Termination Minimum Clearances Termination LocationsMIN. Clearance in. mm Vent Information and Diagrams Minimum H1 Maximum Top Vent Horizontal Termination Venting with 1 elbowMinimum H1 + H2 Maximum Top Vent Horizontal Termination Venting with 2 elbowsExhaust Restrictor Instructions Top Vent Vertical Termination No Elbows V1 Max= 13.4 m 44 ftV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsTop Vent Vertical Termination Venting with 4 elbows Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationSecuring and Leveling the Appliance Installing the Optional Heat-Zone-240V KitAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the Wall Install Horizontal Termination CapGas Connection Gas InformationNatural Gas Propane ButaneValve Pressure Taps Access Through the Valve AssemblyIntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationJunction Cord Information Electrical Service and Repair BlowerKit Contents Fireplace Specific InformationIntroduction Changing Temperature Scale Installation PrecautionsInstallation of Remote Control Housing Determine LocationAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Standby mode Idle When Remote is in on ModeDisplay Screen Function ButtonsAbout OFF Mode About on ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Timer Adjusting ThermostatSetting the Child Lock Power OutageSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFinishing Details Finishing Around Opening with Gypsum Wallboard Finish and Sealing JointsGas Pipe Requirements PaintingTOP View Unlimited Overlap Fit Method Tonic or Martini Decorative Front Facing MaterialInside and Overlap Method See .C Decorative FrontsSee Figures 13.15 Dimensions of Tonic Decorative FrontAppliance Setup Air Shutter Setting Media OptionsVerify Performance of Appliance Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Frequently Asked Questions/Troubleshooting Component Access Access Through the Valve Assembly Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramInspect Maintenance Tasks Maintenance TasksDVP-HPC Cap Brick Extension Vent Components DiagramsSLP90- 90 Elbow SLP-45 45 ElbowCeiling Firestop SupportSupport Box-Black SnorkelSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP XLR-PLUS-N-AU, XLR-PLUS-PB-AU Service Parts#15 Valve Assembly XLR-PLUS-N-AU, XLR-PLUS-PB-AU Service Parts ListContact Information