Heat & Glo LifeStyle XLR-PLUS-PB-AU, XLR-PLUS-N-AU Xlr-Plus-N-Au, Xlr-Plus-Pb-Au, Service Parts

Page 74

D. Service Parts

XLR-PLUS-N-AU, XLR-PLUS-PB-AU

Landscape Heater Rated Appliance

Beginning Manufacturing Date: May 2011

 

Ending Manufacturing Date: ______

 

1

 

 

 

2

 

 

 

3

 

 

 

4

 

 

6

5

 

 

 

 

 

 

 

 

11

 

 

9

10

 

 

 

 

7

8

 

 

 

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number and serial number. All parts listed in this manual may be ordered from an authorized dealer.

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

1

Sheet Rock Ledge, 10 mm

 

2198-147

2

Top Panel Finishing Edge

 

2184-102

3

Non Combustible Board, Top, 10 mm

 

2198-410

4

Non Combustible Board, Side, 10 mm

Qty 2 req

2264-411

5

Base Pan

 

2264-117

6

Glass Door Assembly

 

GLA-XLR-PLUS

7

Burner N

 

2264-007

Burner P & B

 

2264-008

 

 

8

Media Tray

 

2264-118

9

Bracket, J-Box

 

2264-154

10

Junction Cord

 

2222-374

11

Lower Cover Panel

 

2264-103

Additional service part numbers appear on following page.

74

Heat & Glo • XLR-PLUS-N-AU, XLR-PLUS-PB-AU2264-900 Rev. M • 7/12

Image 74
Contents What to do if you smell gas Ref No GSCS20194 AS45532008SAI Global Models XLR-PLUS-N-AU XLR-PLUS-PB-AU Congratulations Homeowner Reference InformationTable of Contents User GuideComponent Access Appliance SetupTroubleshooting FinishingAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide IPI Battery Tray/Battery Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceAGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by Nine Hour Safety Shutdown Feature Control Module OperationAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Leg Combustible/Non-Combustible Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Front Side Finishing DetailTermination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum H1 MaximumTop Vent Horizontal Termination Venting with 2 elbows Minimum H1 + H2 MaximumTop Vent Vertical Termination No Elbows V1 Max= 13.4 m 44 ft Exhaust Restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentInstalling the Optional Heat-Zone-240V Kit Securing and Leveling the ApplianceInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 17 Venting through the WallNatural Gas Gas InformationGas Connection Propane ButaneAccess Through the Valve Assembly Valve Pressure TapsOptional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationElectrical Service and Repair Blower Junction Cord InformationIntroduction Kit ContentsFireplace Specific Information Installation of Remote Control Housing Installation PrecautionsChanging Temperature Scale Determine LocationProgramming the RC300AU to the Control Module AUX300CE Module InstallationFan Installation Display Screen Idle When Remote is in on ModeStandby mode Function ButtonsAdjusting Flame Height About on ModeAbout OFF Mode Adjusting Fan SpeedSetting the Child Lock Adjusting ThermostatAdjusting Timer Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFraming and Finishing Instructions Non-Combustible Materials SpecificationFinishing Finishing InstructionsFinishing Details Gas Pipe Requirements Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard PaintingTOP View Unlimited Facing Material Overlap Fit Method Tonic or Martini Decorative FrontDecorative Fronts Inside and Overlap Method See .CDimensions of Tonic Decorative Front See Figures 13.15Appliance Setup Verify Performance of Appliance Air Shutter SettingMedia Options IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Frequently Asked Questions/Troubleshooting Component Access Access Through the Valve Assembly Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsMaintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-HPC Cap Brick Extension Ceiling Firestop SLP-45 45 Elbow SLP90- 90 Elbow SupportSnorkel Support Box-BlackSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts XLR-PLUS-N-AU, XLR-PLUS-PB-AU#15 Valve Assembly Service Parts List XLR-PLUS-N-AU, XLR-PLUS-PB-AUContact Information