Heat & Glo LifeStyle XLR-PLUS-PB-AU manual Vent Components Diagrams, DVP-HPC Cap Brick Extension

Page 70

C. Vent Components Diagrams

 

 

 

11-5/8 in.

 

 

 

 

 

(295 mm)

 

 

 

7-1/8 in

 

 

12-1/8

 

 

 

 

(308 mm)

 

(181 mm)

 

 

 

 

 

 

 

 

5-3/4 in.

 

 

 

 

 

(146 mm)

COOL-ADD

 

 

 

 

 

 

 

 

Cap Shield

 

 

 

13-7/8 in.

9-1/2 in

 

 

 

(352 mm)

(241 mm)

 

 

 

14 in.

 

 

 

 

(356 mm)

 

 

 

 

 

 

DRC-RADIUS

 

 

 

 

Cap Shield

 

 

 

 

 

5 in.

 

 

 

 

11-7/8 in.

(127 mm)

 

 

 

 

(302 mm)

 

 

 

 

13-7/8 in.

 

 

 

 

 

(352 mm)

 

 

 

 

 

 

DVP-BEK2

 

 

 

DVP-HPC Cap Brick Extension

 

Figure 17.2 Vent Components

 

 

 

 

70

Heat & Glo • XLR-PLUS-N-AU, XLR-PLUS-PB-AU2264-900 Rev. M • 7/12

Image 70
Contents SAI Global Ref No GSCS20194 AS45532008What to do if you smell gas Models XLR-PLUS-N-AU XLR-PLUS-PB-AU Congratulations Homeowner Reference InformationTable of Contents User GuideComponent Access Appliance SetupTroubleshooting FinishingAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace IPI Battery Tray/Battery Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceFinal inspection by Lighting Instructions IPIAGE 110/120 VAC or 220/240 Nine Hour Safety Shutdown Feature Control Module OperationInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Leg Combustible/Non-Combustible Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Front Side Finishing DetailTermination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum H1 MaximumTop Vent Horizontal Termination Venting with 2 elbows Minimum H1 + H2 MaximumTop Vent Vertical Termination No Elbows V1 Max= 13.4 m 44 ft Exhaust Restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentInstalling the Optional Heat-Zone-240V Kit Securing and Leveling the ApplianceInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the WallNatural Gas Gas InformationGas Connection Propane ButaneAccess Through the Valve Assembly Valve Pressure TapsOptional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationElectrical Service and Repair Blower Junction Cord InformationFireplace Specific Information Kit ContentsIntroduction Installation of Remote Control Housing Installation PrecautionsChanging Temperature Scale Determine LocationFan Installation AUX300CE Module InstallationProgramming the RC300AU to the Control Module Display Screen Idle When Remote is in on ModeStandby mode Function ButtonsAdjusting Flame Height About on ModeAbout OFF Mode Adjusting Fan SpeedSetting the Child Lock Adjusting ThermostatAdjusting Timer Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFraming and Finishing Instructions Non-Combustible Materials SpecificationFinishing Finishing InstructionsFinishing Details Gas Pipe Requirements Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard PaintingTOP View Unlimited Facing Material Overlap Fit Method Tonic or Martini Decorative FrontDecorative Fronts Inside and Overlap Method See .CDimensions of Tonic Decorative Front See Figures 13.15Appliance Setup Media Options Air Shutter SettingVerify Performance of Appliance Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Ues to spark, and main Frequently Asked Questions/Troubleshooting Component Access Access Through the Valve Assembly Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsMaintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-HPC Cap Brick ExtensionCeiling Firestop SLP-45 45 ElbowSLP90- 90 Elbow SupportSnorkel Support Box-BlackSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts XLR-PLUS-N-AU, XLR-PLUS-PB-AU#15 Valve Assembly Service Parts List XLR-PLUS-N-AU, XLR-PLUS-PB-AUContact Information