Heat & Glo LifeStyle RED60 2159-900 manual After Fireplace is Lit, Frequently Asked Questions

Page 12

I. After Fireplace is Lit

Initial Break-in Procedure

The fireplace should be run three to four hours continuously on high.

Turn the fireplace off and allow it to completely cool.

Remove fixed glass assembly. See Section 14.H.

Clean fixed glass assembly. See Section 3.

Replace the fixed glass assembly and run continuously on high an additional 12 hours.

This cures the materials used to manufacture the fire- place.

NOTICE! Open windows for air circulation during fire- place break-in.

Some people may be sensitive to smoke and odors.

Smoke detectors may activate.

J.Frequently Asked Questions

ISSUE

SOLUTIONS

 

 

Condensation on the glass

This is a result of gas combustion and temperature variations. As the fireplace warms, this conden-

sation will disappear.

 

 

 

Blue flames

This is a result of normal operation and the flames will begin to yellow as the fireplace is allowed to

burn for 20 to 40 minutes.

 

 

 

 

When first operated, this fireplace may release an odor for the first several hours. This is caused

Odor from fireplace

by the curing of materials from manufacturing. Odor may also be released from finishing materials

and adhesives used near the fireplace. These circumstances may require additional curing related

 

 

to the installation environment.

 

 

Film on the glass

This is a normal result of the curing process of the paint. Glass should be cleaned within 3 to 4

hours of initial burning. A non-abrasive cleaner such as gas appliance glass cleaner may be nec-

 

 

essary. See your dealer.

 

 

 

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to the

Metallic noise

sound produced by a furnace or heating duct. This noise does not affect the operation or longevity

 

of the fireplace.

 

 

 

There may be some “cracking” noise coming from the fireplace during the first few heating and

Rock noise

cooling cycles. This noise is associated with settling rock and some minor cracking of larger

pieces of rock. This will lessen over time as the glass rock is conditioned to the heating and cool-

 

 

ing temperature changes.

 

 

Rocks falling through basepan

It is expected that a few small pieces of rock may fall through the basepan and come to rest on the

fireplace bottom. This has no affect on fireplace performance.

 

 

 

Wall above appliance feels hot to

No action necessary. This appliance ships with a non-combustible material attached. Specifica-

the touch.

tions of the attached non-combustible material are listed in Section 1.E.

 

 

12

Heat & Glo • RED60 • 2159-900 Rev. R • 9/12

Image 12 Contents
Models What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Requirements for the Commonwealth of Massachusetts Vent Directly BELOW. Keep Clear of ALL OB- Structions Manufacturer Requirements Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass Assembly Decorative Doors and FrontsControl Module Operation Before Lighting FireplaceLighting Instructions IPI Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting FireboxGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationMinimum Framing Dimensions Constructing the Appliance ChaseClearances Mantel and Wall Projections TOP View Fireplace MIN MAX Opening Unlimited= Acceptable NON-COMBUSTIBLE Mantel LEG Zone Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Installation Instructions and Venting In- formation PVI-DVP Components and Service Parts ListInstallation Precautions Installation GuidelinesInstallation of Vent Pipe Framing and Clearances Chassis DimensionsFraming Dimensions Vent Pipe RegulationsAccess Panel Framing Dimensions Chase Appliance Wiring the PVI-DVP Wire HarnessScrews PVI-DVP ConnectionsInstallation Inspection Vacuum Switch OrientationMaintenance Operating InstructionsVent Diagrams Top Vent Horizontal Termination Venting with 1 elbowMinimum + H 1 Maximum Top Vent Horizontal Termination Venting with 2 elbows V1 Minimum V1 + H1 + H2 MaximumTop Vent Horizontal Termination Venting with 3 elbows V1 Minimum V1 + V2 + H1 + H2 MaximumElbows Minimum Total V + Total H Maximum Minimum Total V + Total H Maximum25 Vertical Vent Maximum Top Vent Vertical Termination Venting with 2 elbows Minimum V1 + V2 + H MaximumTop Vent Vertical Termination Venting with 3 elbows Minimum V1 + V2 + H1 + H2 MaximumDirect Vent with 4 FT. Minimum Vertical OFF TOP of Appliance 29 Power Vent Positioned After Vertical Drop These Instructions Must Remain with the Equipment ComponentsVenting of More than ONE Appliance in a Common Vent System is ProhibitedWiring the PVK-80 Power Vent Installation Inspection 8K1-PVI AUX300 Operating Instructions To Reassemble the Power Vent PVK-80 Top Vent Horizontal Termination Venting with 1 elbow V1 Minimum V1 + H1 MaximumPVK-80 Top Vent Horizontal Termination Venting with 2 elbows Elbows V1 + V2 Minimum Total V + Total H Maximum MAX. Elbows MAX. Total Vent RUN FT MAX. VERT. Drop FT Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentFiberglass Rope RingSetting the Fireplace into the Framing Securing and Leveling the ApplianceActive Convection Technology Detail aInstalling Vent Pipe DVP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Gas Information Fuel ConversionGas Pressure Gas and Electrical Access Gas ConnectionWiring Requirements IntelliFire PlusTM Ignition System WiringOptional Configuration Requirements Electrical InformationWires from touching the blower Switch Tripped Color Produced Optional LED Lighting CircuitElectrical Service and Repair Junction Box Installation Active Convection Blower ReplacementSlot on Blower Housing Blower TAB on Mounting PlateNon-Combustible Materials Specification FinishingSplatter Guard Framing and Finishing InstructionsFinish and Sealing Joints Finishing Around Opening with Gypsum WallboardPainting Facing Material IN. ThickOverlap Fit Method 10 Mesh Front Installation Mesh FrontsAppliance Setup Rock Media Placement JIG Pilot Shield Kit Contents Porcelain InstructionsRED60 Model Without Media Tools RequiredInstallation NNN NNPService Parts Description Part NumberInstallation RED60 Model With MediaBend TAB UP Granite Instructions Back Panel Pieces19-3/8 Installing First Back Panel Granite Piece Notched Area Over PilotGlass Assembly Tabs Face Glass Assembly Placing Back Panel Piece Glass Frame TAB Retaining TAB Sheet Metal Refractory Instructions ALL Gaps Equal TabsItem Description Comments Part Number SMR-60NLInstall the Mesh Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System PVI-DVP Troubleshooting PilotAppliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-HPC1 DVP-HPC2 DVP vent componentsRF6M RF12M DVP-FBHT RED60 RED60 Service Service PartsContact Information