Heat & Glo LifeStyle RED60 2159-900 manual Placing Back Panel Piece

Page 82

RED60 Model With Media

This kit contains the components necessary to install the granite on single sided RED60 models that have media installed.

Kit Contents:

(3)Back panel pieces 19-13/16 inches wide x 16-7/8 inches tall. See Figure 1.

(2)Inner side wall pieces 10 inches wide x 16-7/8 inches tall. See Figure 2.

(2)Outside corner trim pieces. See Figure 3.

(7)Securing tabs. See Figure 4.

(7)Sheet metal screws. See Figure 4.

Tools Required:

Cordless Drill

1/4 inch hex head driver tip

Pry Bar and Hammer for opening shipping crate.

Installation

1.Begin by removing back row and sides of quarter inch sheet metal screws from base pan as shown in Figure 5. The screws will be located either on top of or underneath the mesh. If underneath mesh, lift mesh screen up and remove for access to screw heads. After removing screws replace mesh before installing granite.

16-7/8 IN.

19-13/16 IN.

Figure 1. Back Panel Pieces.

16-7/8 IN.

10 IN.

Figure 2. Inner Side Wall Pieces.

Figure 3. Outside Corner Trim Pieces.

Figure 4. Securing Tabs and Sheet Metal Screws.

Figure 5. Removing Screws from Basepan.

2.Measure granite to ensure you are installing the pieces in the right orientation. Back panel pieces are to be placed first. These pieces are wider than they are tall. Install so that width is 19-13/16 inches. Begin installing pieces left to right. Place granite into firebox, bottom side first, then tilt top backward into position. Place the first piece on the left and move to right as you add the other pieces. See Figure 6.

19-13/16 IN.

Figure 6. Placing Back Panel Piece.

3.Secure granite pieces using angle tabs and screws provided. See Figure 7. Secure each piece as it is placed into position to keep it from falling while placing next piece into firebox. Continue with back middle piece and then back right side.

82

Heat & Glo • RED60 • 2159-900 Rev. R • 9/12

Image 82 Contents
Models What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Vent Directly BELOW. Keep Clear of ALL OB- Structions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Control Module Operation Fixed Glass AssemblyDecorative Doors and Fronts Before Lighting FireplaceLighting Instructions IPI Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Doors, Surrounds, FrontsVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing DimensionsClearances TOP View Fireplace MIN MAX Opening Unlimited Mantel and Wall Projections= Acceptable NON-COMBUSTIBLE Mantel LEG Zone Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Installation Precautions Installation Instructions and Venting In- formation PVI-DVPComponents and Service Parts List Installation GuidelinesFraming Dimensions Installation of Vent PipeFraming and Clearances Chassis Dimensions Vent Pipe RegulationsAccess Panel Framing Dimensions Chase Appliance Screws Wiring the PVI-DVPWire Harness PVI-DVP ConnectionsInstallation Inspection Vacuum Switch OrientationMaintenance Operating InstructionsTop Vent Horizontal Termination Venting with 1 elbow Vent DiagramsMinimum + H 1 Maximum Top Vent Horizontal Termination Venting with 2 elbows V1 Minimum V1 + H1 + H2 MaximumElbows Minimum Total V + Total H Maximum Top Vent Horizontal Termination Venting with 3 elbowsV1 Minimum V1 + V2 + H1 + H2 Maximum Minimum Total V + Total H Maximum25 Vertical Vent Maximum Top Vent Vertical Termination Venting with 2 elbows Minimum V1 + V2 + H MaximumTop Vent Vertical Termination Venting with 3 elbows Minimum V1 + V2 + H1 + H2 MaximumDirect Vent with 4 FT. Minimum Vertical OFF TOP of Appliance 29 Power Vent Positioned After Vertical Drop Venting of More than ONE Appliance in a These Instructions Must Remain with the EquipmentComponents Common Vent System is ProhibitedWiring the PVK-80 Power Vent Installation Inspection 8K1-PVI AUX300 Operating Instructions To Reassemble the Power Vent PVK-80 Top Vent Horizontal Termination Venting with 1 elbow V1 Minimum V1 + H1 MaximumPVK-80 Top Vent Horizontal Termination Venting with 2 elbows Elbows V1 + V2 Minimum Total V + Total H Maximum MAX. Elbows MAX. Total Vent RUN FT MAX. VERT. Drop FT Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Fiberglass Appliance PreparationTop Vent Rope RingSetting the Fireplace into the Framing Securing and Leveling the ApplianceActive Convection Technology Detail aInstalling Vent Pipe DVP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Fuel Conversion Gas InformationGas Pressure Gas and Electrical Access Gas ConnectionOptional Configuration Requirements Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Electrical InformationWires from touching the blower Switch Tripped Color Produced Optional LED Lighting CircuitElectrical Service and Repair Junction Box Installation Active Convection Blower ReplacementSlot on Blower Housing Blower TAB on Mounting PlateSplatter Guard Non-Combustible Materials SpecificationFinishing Framing and Finishing InstructionsFinishing Around Opening with Gypsum Wallboard Finish and Sealing JointsPainting Facing Material IN. ThickOverlap Fit Method 10 Mesh Front Installation Mesh FrontsAppliance Setup Rock Media Placement JIG Pilot Shield RED60 Model Without Media Kit ContentsPorcelain Instructions Tools RequiredInstallation NNN NNPService Parts Description Part NumberInstallation RED60 Model With MediaBend TAB UP Granite Instructions Back Panel Pieces19-3/8 Installing First Back Panel Granite Piece Notched Area Over PilotGlass Assembly Tabs Face Glass Assembly Placing Back Panel Piece Glass Frame TAB Retaining TAB Sheet Metal Refractory Instructions ALL Gaps Equal TabsItem Description Comments Part Number SMR-60NLAir Shutter Setting Install the MeshAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System PVI-DVP Troubleshooting PilotAppliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-HPC1 DVP-HPC2 DVP vent componentsRF6M RF12M DVP-FBHT RED60 RED60 Service Service PartsContact Information