Heat & Glo LifeStyle RED60 2159-900 manual Mantel and Wall Projections

Page 19

Note: For non-combustible fireplace finish material (marble, stone, etc) specifications refer to Section 13.

Non-Combustible Mantels

1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TO CEILING

Note: All

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

measurements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

in inches.

MAX.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

43

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MIN.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

6

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

53

2

4

1

 

MEASUREMENTS FROM TOP EDGE OF THE

FIRESCREEN DOOR ASSEMBLY

NAILING TABS

BOTH SIDES

Figure 5.3 Nailing Tab Locations

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing or finishing material closer than the minimums listed must be construct- ed entirely of noncombustible materials (i.e., steel studs, concrete board, etc).

Combustible Mantels

Note: All measurements in inches.

TO CEILING

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

43

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

25

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MEASUREMENTS FROM

TOP EDGE OF THE OPENING

Figure 5.4 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles

Figure 5.5 Minimum Vertical and Maximum Horizontal

Dimensions of Non-Combustibles

Mantel Legs Or Wall Projections Extending Past The Face Of The Fireplace

TOP VIEW

 

 

 

 

2 IN.

FIREPLACE

4 IN.

MIN.

 

MAX.

 

OPENING

 

 

 

 

 

UNLIMITED

 

6 IN. MIN.

 

= ACCEPTABLE

NON-COMBUSTIBLE

MANTEL LEG

ZONE

Figure 5.6 Mantel Leg or Wall Projections (Acceptable on both sides of opening)

Heat & Glo • RED60 • 2159-900 Rev. R • 9/12

19

Image 19 Contents
What to do if you smell gas ModelsHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Vent Directly BELOW. Keep Clear of ALL OB- Structions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Before Lighting Fireplace Fixed Glass AssemblyDecorative Doors and Fronts Control Module OperationFinal inspection by Lighting Instructions IPIInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Doors, Surrounds, Fronts Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection Venting Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Minimum Framing DimensionsClearances TOP View Fireplace MIN MAX Opening Unlimited Mantel and Wall Projections= Acceptable NON-COMBUSTIBLE Mantel LEG Zone Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Covered Alcove ApplicationsVent Information and Diagrams Installation Guidelines Installation Instructions and Venting In- formation PVI-DVPComponents and Service Parts List Installation PrecautionsVent Pipe Regulations Installation of Vent PipeFraming and Clearances Chassis Dimensions Framing DimensionsAccess Panel Framing Dimensions Chase Appliance PVI-DVP Connections Wiring the PVI-DVPWire Harness ScrewsVacuum Switch Orientation Installation InspectionOperating Instructions MaintenanceTop Vent Horizontal Termination Venting with 1 elbow Vent DiagramsMinimum + H 1 Maximum V1 Minimum V1 + H1 + H2 Maximum Top Vent Horizontal Termination Venting with 2 elbowsMinimum Total V + Total H Maximum Top Vent Horizontal Termination Venting with 3 elbowsV1 Minimum V1 + V2 + H1 + H2 Maximum Elbows Minimum Total V + Total H Maximum25 Vertical Vent Maximum Minimum V1 + V2 + H Maximum Top Vent Vertical Termination Venting with 2 elbowsMinimum V1 + V2 + H1 + H2 Maximum Top Vent Vertical Termination Venting with 3 elbowsDirect Vent with 4 FT. Minimum Vertical OFF TOP of Appliance 29 Power Vent Positioned After Vertical Drop Common Vent System is Prohibited These Instructions Must Remain with the EquipmentComponents Venting of More than ONE Appliance in aWiring the PVK-80 Power Vent Installation Inspection 8K1-PVI AUX300 Operating Instructions To Reassemble the Power Vent V1 Minimum V1 + H1 Maximum PVK-80 Top Vent Horizontal Termination Venting with 1 elbowPVK-80 Top Vent Horizontal Termination Venting with 2 elbows Elbows V1 + V2 Minimum Total V + Total H Maximum MAX. Elbows MAX. Total Vent RUN FT MAX. VERT. Drop FT Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Rope Ring Appliance PreparationTop Vent FiberglassSecuring and Leveling the Appliance Setting the Fireplace into the FramingDetail a Active Convection TechnologyAssemble Vent Sections Installing Vent Pipe DVP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Fuel Conversion Gas InformationGas Pressure Gas Connection Gas and Electrical AccessElectrical Information Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Optional Configuration RequirementsWires from touching the blower Optional LED Lighting Circuit Switch Tripped Color ProducedActive Convection Blower Replacement Electrical Service and Repair Junction Box InstallationBlower TAB on Mounting Plate Slot on Blower HousingFraming and Finishing Instructions Non-Combustible Materials SpecificationFinishing Splatter GuardFinishing Around Opening with Gypsum Wallboard Finish and Sealing JointsPainting IN. Thick Facing MaterialOverlap Fit Method Mesh Fronts 10 Mesh Front InstallationAppliance Setup Rock Media Placement JIG Pilot Shield Tools Required Kit ContentsPorcelain Instructions RED60 Model Without MediaNNN NNP InstallationDescription Part Number Service PartsRED60 Model With Media InstallationBend TAB UP Back Panel Pieces Granite Instructions19-3/8 Notched Area Over Pilot Installing First Back Panel Granite PieceGlass Assembly Tabs Face Glass Assembly Placing Back Panel Piece Glass Frame TAB Retaining TAB ALL Gaps Equal Tabs Sheet Metal Refractory InstructionsSMR-60NL Item Description Comments Part NumberAir Shutter Setting Install the MeshAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Pilot PVI-DVP TroubleshootingReference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP vent components DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-HPC1 DVP-HPC2RF6M RF12M DVP-FBHT RED60 RED60 Service Parts ServiceContact Information