Heat & Glo LifeStyle RED60 2159-900 manual Facing Material, IN. Thick

Page 68

C. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc.)

Note: For non-combustible fireplace finish material (marble, stone, etc) specifications refer to Figure 13.10 and Figure 13.11.

Combustible Mantels

Note: All

measurements in inches.

TO CEILING

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

31

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

25

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MEASUREMENTS FROM

TOP EDGE OF THE OPENING

Figure 13.2 Minimum Vertical and Maximum Horizontal

Dimensions of Combustibles

Note: For non-combustible fireplace finish material (marble, stone, etc) specifications refer to Section 13.

Non-Combustible Mantels

TO CEILING

Note: All

measurements

 

 

in inches.

MAX.

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

31

MIN.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

1/2

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MEASUREMENTS FROM TOP EDGE OF THE

FIRESCREEN DOOR ASSEMBLY

Figure 13.3 Minimum Vertical and Maximum Horizontal Dimensions of Non-Combustibles

Mantel Legs Or Wall Projections Extending Past The Face Of The Fireplace

TOP VIEW

 

 

 

 

2 IN.

FIREPLACE

4 IN.

MIN.

 

MAX.

 

OPENING

 

 

 

 

 

UNLIMITED

 

6 IN. MIN.

 

= ACCEPTABLE

NON-COMBUSTIBLE

MANTEL LEG

ZONE

Figure 13.4 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

D. Facing Material

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

 

COMBUSTIBLE

 

FRAMING

7-1/4 IN.

1/2 IN. THICK

WALL SHEATHING

 

 

1/2 IN.

 

13-3/4 IN.

 

FACTORY-SUPPLIED

 

NON-COMBUSTIBLE

 

BOARD

1 IN.

 

 

NON-COMBUSTIBLE BOARD

 

ON FRONT FACE (SIDE VIEW)

 

= AIR SPACE

Figure 13.5 Framing and Framing Materials-RED60

68

Heat & Glo • RED60 • 2159-900 Rev. R • 9/12

Image 68 Contents
Models What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsVent Directly BELOW. Keep Clear of ALL OB- Structions Your Fireplace Clear Space Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Decorative Doors and FrontsControl Module Operation Before Lighting FireplaceLighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationClearances Minimum Framing DimensionsConstructing the Appliance Chase = Acceptable NON-COMBUSTIBLE Mantel LEG Zone Mantel and Wall ProjectionsTOP View Fireplace MIN MAX Opening Unlimited Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Installation Instructions and Venting In- formation PVI-DVP Components and Service Parts ListInstallation Precautions Installation GuidelinesInstallation of Vent Pipe Framing and Clearances Chassis DimensionsFraming Dimensions Vent Pipe RegulationsAccess Panel Framing Dimensions Chase Appliance Wiring the PVI-DVP Wire HarnessScrews PVI-DVP ConnectionsInstallation Inspection Vacuum Switch OrientationMaintenance Operating InstructionsMinimum + H 1 Maximum Vent DiagramsTop Vent Horizontal Termination Venting with 1 elbow Top Vent Horizontal Termination Venting with 2 elbows V1 Minimum V1 + H1 + H2 MaximumTop Vent Horizontal Termination Venting with 3 elbows V1 Minimum V1 + V2 + H1 + H2 MaximumElbows Minimum Total V + Total H Maximum Minimum Total V + Total H Maximum25 Vertical Vent Maximum Top Vent Vertical Termination Venting with 2 elbows Minimum V1 + V2 + H MaximumTop Vent Vertical Termination Venting with 3 elbows Minimum V1 + V2 + H1 + H2 MaximumDirect Vent with 4 FT. Minimum Vertical OFF TOP of Appliance 29 Power Vent Positioned After Vertical Drop These Instructions Must Remain with the Equipment ComponentsVenting of More than ONE Appliance in a Common Vent System is ProhibitedWiring the PVK-80 Power Vent Installation Inspection 8K1-PVI AUX300 Operating Instructions To Reassemble the Power Vent PVK-80 Top Vent Horizontal Termination Venting with 1 elbow V1 Minimum V1 + H1 MaximumPVK-80 Top Vent Horizontal Termination Venting with 2 elbows Elbows V1 + V2 Minimum Total V + Total H Maximum MAX. Elbows MAX. Total Vent RUN FT MAX. VERT. Drop FT Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentFiberglass Rope RingSetting the Fireplace into the Framing Securing and Leveling the ApplianceActive Convection Technology Detail aInstalling Vent Pipe DVP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Horizontal Termination Cap Gas Pressure Gas InformationFuel Conversion Gas and Electrical Access Gas ConnectionWiring Requirements IntelliFire PlusTM Ignition System WiringOptional Configuration Requirements Electrical InformationWires from touching the blower Switch Tripped Color Produced Optional LED Lighting Circuit Electrical Service and Repair Junction Box Installation Active Convection Blower ReplacementSlot on Blower Housing Blower TAB on Mounting PlateNon-Combustible Materials Specification FinishingSplatter Guard Framing and Finishing InstructionsPainting Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard Facing Material IN. ThickOverlap Fit Method 10 Mesh Front Installation Mesh FrontsAppliance Setup Rock Media Placement JIG Pilot Shield Kit Contents Porcelain InstructionsRED60 Model Without Media Tools RequiredInstallation NNN NNPService Parts Description Part NumberInstallation RED60 Model With MediaBend TAB UP Granite Instructions Back Panel Pieces19-3/8 Installing First Back Panel Granite Piece Notched Area Over PilotGlass Assembly Tabs Face Glass Assembly Placing Back Panel Piece Glass Frame TAB Retaining TAB Sheet Metal Refractory Instructions ALL Gaps Equal TabsItem Description Comments Part Number SMR-60NLAir Shutter Settings Install the MeshAir Shutter Setting IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action PVI-DVP Troubleshooting PilotAppliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-HPC1 DVP-HPC2 DVP vent componentsRF6M RF12M DVP-FBHT RED60 RED60 Service Service PartsContact Information