Heat & Glo LifeStyle RED60 2159-900 manual Install Vertical Termination Cap

Page 58

H. Install Vertical Termination Cap

Attach the vertical termination cap by sliding the inner collar of the cap into the inner flue of the pipe section while placing the outer collar of the cap over the outer flue of the pipe section.

Secure the cap by driving three self-tapping screws (supplied) through the pilot holes in the outer collar of the cap into the outer flue of the pipe (see Figure 10.19).

TERMINATION CAP

(1 of 3)

STORM

COLLAR

SCREWS

CAULK

Figure 10.19

I.Heat Shield Requirements for Horizontal Termination

WARNING! Risk of Fire! To prevent overheating and fire, heat shields must extend through the entire wall thick- ness.

DO NOT remove the heat shields attached to the wall shield firestop and the horizontal termination cap

(shown in Figure 10.20).

Heat shields must overlap 1-1/2 in. (38 mm) mini- mum.

There are two sections of the heat shield. One section is factory-attached to the wall shield firestop. The other section is factory-attached to the cap. See Figure 10.20.

If the wall thickness does not allow the required 1-1/2 in. (38 mm) heat shield overlap when installed, an extended heat shield must be used.

If the wall thickness is less than 4 in./102 mm, the heat shields on the cap and wall shield firestop must be trimmed. A minimum 1-1/2 in. (38 mm) overlap MUST be maintained.

Use an extended heat shield if the finished wall thickness is greater than 7-1/4 in. (184 mm).

The extended heat shield may need to be cut to length

maintaining sufficient length for a 1-1/2 in. (38 mm) overlap between heat shields.

Attach the extended heat shield to either of the existing heat shields using the screws supplied with the extended heat shield. Refer to vent components diagrams in the back of this manual.

Rest the small leg on the extended heat shield on top of the pipe section to properly space it from the pipe section.

Important Notice: Heat shields may not be field constructed.

J. Install Horizontal Termination Cap

WARNING! Risk of Fire! The telescoping flue section of the termination cap MUST be used when connecting vent.

1-1/2 (38 mm) minimum overlap of flue telescoping section is required.

Failure to maintain overlap may cause overheating and fire.

Vent termination must not be recessed in the wall. Siding may be brought to the edge of the cap base.

Flash and seal as appropriate for siding material at outside edges of cap.

When installing a horizontal termination cap, follow the cap location guidelines as prescribed by current ANSI Z223.1 and CAN/CGA-B149installation codes and refer to Section 6 of this manual.

CAUTION! Risk of Burns! Local codes may require in- stallation of a cap shield to prevent anything or anyone from touching the hot cap.

NOTICE: For certain exposures which require superior resistance to wind-driven rain penetration, a flashing kit and HRC caps are available. When penetrating a brick wall, a brick extension kit is available for framing the brick.

Note: When using termination caps with factory-supplied heat shield attached, no additional wall shield firestop is required on the exterior side of a combustible wall.

HEAT SHIELD OR

HEAT SHIELD

EXTENDED

1-1/2 IN. (38 MM) MIN.

HEAT SHIELD

OVERLAP

WALL SHIELD

 

FIRESTOP

 

SLIP SECTION

 

CAN BE EXTENDED

 

INNER VENT

SHEATHING

OUTER VENT

 

INTERIOR

EXTERIOR

Figure 10.20 Venting Through the Wall

 

58

Heat & Glo • RED60 • 2159-900 Rev. R • 9/12

Image 58 Contents
Models What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Vent Directly BELOW. Keep Clear of ALL OB- Structions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Control Module Operation Fixed Glass AssemblyDecorative Doors and Fronts Before Lighting FireplaceLighting Instructions IPI Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Doors, Surrounds, FrontsVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing DimensionsClearances TOP View Fireplace MIN MAX Opening Unlimited Mantel and Wall Projections= Acceptable NON-COMBUSTIBLE Mantel LEG Zone Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Installation Precautions Installation Instructions and Venting In- formation PVI-DVPComponents and Service Parts List Installation GuidelinesFraming Dimensions Installation of Vent PipeFraming and Clearances Chassis Dimensions Vent Pipe RegulationsAccess Panel Framing Dimensions Chase Appliance Screws Wiring the PVI-DVPWire Harness PVI-DVP ConnectionsInstallation Inspection Vacuum Switch OrientationMaintenance Operating InstructionsTop Vent Horizontal Termination Venting with 1 elbow Vent DiagramsMinimum + H 1 Maximum Top Vent Horizontal Termination Venting with 2 elbows V1 Minimum V1 + H1 + H2 MaximumElbows Minimum Total V + Total H Maximum Top Vent Horizontal Termination Venting with 3 elbowsV1 Minimum V1 + V2 + H1 + H2 Maximum Minimum Total V + Total H Maximum25 Vertical Vent Maximum Top Vent Vertical Termination Venting with 2 elbows Minimum V1 + V2 + H MaximumTop Vent Vertical Termination Venting with 3 elbows Minimum V1 + V2 + H1 + H2 MaximumDirect Vent with 4 FT. Minimum Vertical OFF TOP of Appliance 29 Power Vent Positioned After Vertical Drop Venting of More than ONE Appliance in a These Instructions Must Remain with the EquipmentComponents Common Vent System is ProhibitedWiring the PVK-80 Power Vent Installation Inspection 8K1-PVI AUX300 Operating Instructions To Reassemble the Power Vent PVK-80 Top Vent Horizontal Termination Venting with 1 elbow V1 Minimum V1 + H1 MaximumPVK-80 Top Vent Horizontal Termination Venting with 2 elbows Elbows V1 + V2 Minimum Total V + Total H Maximum MAX. Elbows MAX. Total Vent RUN FT MAX. VERT. Drop FT Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Fiberglass Appliance PreparationTop Vent Rope RingSetting the Fireplace into the Framing Securing and Leveling the ApplianceActive Convection Technology Detail a Installing Vent Pipe DVP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Fuel Conversion Gas InformationGas Pressure Gas and Electrical Access Gas ConnectionOptional Configuration Requirements Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Electrical InformationWires from touching the blower Switch Tripped Color Produced Optional LED Lighting CircuitElectrical Service and Repair Junction Box Installation Active Convection Blower ReplacementSlot on Blower Housing Blower TAB on Mounting PlateSplatter Guard Non-Combustible Materials SpecificationFinishing Framing and Finishing InstructionsFinishing Around Opening with Gypsum Wallboard Finish and Sealing JointsPainting Facing Material IN. ThickOverlap Fit Method 10 Mesh Front Installation Mesh FrontsAppliance Setup Rock Media Placement JIG Pilot Shield RED60 Model Without Media Kit ContentsPorcelain Instructions Tools RequiredInstallation NNN NNPService Parts Description Part NumberInstallation RED60 Model With MediaBend TAB UP Granite Instructions Back Panel Pieces19-3/8 Installing First Back Panel Granite Piece Notched Area Over PilotGlass Assembly Tabs Face Glass Assembly Placing Back Panel Piece Glass Frame TAB Retaining TAB Sheet Metal Refractory Instructions ALL Gaps Equal TabsItem Description Comments Part Number SMR-60NLAir Shutter Setting Install the MeshAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System PVI-DVP Troubleshooting PilotAppliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-HPC1 DVP-HPC2 DVP vent componentsRF6M RF12M DVP-FBHT RED60 RED60 Service Service PartsContact Information