Heat & Glo LifeStyle 6000C manual Install Attic Insulation Shield, Flat Ceiling Installation

Page 41

D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90º around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90º around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

BEND ALL TABS INWARD 90°

TO MAINTAIN CLEARANCE

AND PREVENT INSULATION

FROM FALLING INSIDE

 

BEND 3 TABS

 

OUTWARD TO

 

FASTEN TO CEILING

 

FIRESTOP-BEND

 

REMAINING TABS

 

INWARD 90 DEGREES

 

TO MAINTAIN

INSERT 3

CLEARANCE

 

SCREWS

 

Figure 8.5 Attic Insulation Shield

E. Installing the Optional Heat-Zone®Gas Kit

Remove the knockout from the fireplace and discard it (see Figure 8.6).

Center the duct collar around the exposed hole and attach it to the fireplace with 3 screws. Note: Do this BEFORE final positioning of fireplace.

Determine the location for the air register/fan housing assembly.

Reference the Heat-Zone® Gas kit instructions for the remaining installation steps.

HEAT-ZONE®GAS

ATTACHES HERE

Figure 8.6 Heat-Zone®Cover Plate

Heat & Glo • 6000C, 6000C-IPI, 8000C, 8000C-IPI2164-900 Rev. T • 9/12

41

Image 41
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyBTU Specifications Tempered Glass SpecificationsHigh Altitude Installations Listing and Code ApprovalsCombustible Materials Specification Non-Combustible Materials SpecificationElectrical Codes C22.1Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceModule Reset IPI Battery Tray/Battery InstallationNine Hour Safety Shutdown Feature Control Module OperationFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveLighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsBase Refractory Refractory, Grate and Valve Assembly RemovalNotch Location Burner Identification/VerificationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and Clearances6000 8000Clearances Constructing the Appliance Chase6000 8000Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination Locations= 9 inches U.S.A Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsOne Elbow Vent Diagrams Top Vent Horizontal TerminationVent pipe, if desired 6000C-IPI 8000C-IPI V1 Minimum H1 MaximumThree Elbows Top Vent Horizontal Termination Two Elbows6000C-IPI V1 Minimum H1 + H2 Maximum 8000C-IPI V1 Minimum H1 + H2 MaximumBreak Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Minimum + H Maximum Rear Vent Vertical Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 + H3 Maximum 10 ft Rear Vent Vertical Termination Three ElbowsCoaxial to Colinear Venting Prior to installing the gas applianceClearances to Combustibles Termination Cap Flue DamperRear Vent Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-ZoneGas Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentHeader Installing the Non-combustible BoardSecuring and Leveling the Appliance Attach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Roof Pitch Min. Ft Install Metal Roof FlashingAssemble and Install Storm Collar Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeFuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire Plus Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsTo Junction Wall Switch Installation for Fan Optional Electrical Service and Repair Junction Box InstallationFacing Material FinishingDoor FIT Finish Material See Thickness DoorsFinishing Material Inch Thick or Less Models Finishing Material Thickness 1-4 inches maximumFinishing Material Thickness 0-4 inches maximum Finishing Strips Removed Removal of Finishing StripsElevated Hearth Systems Appliance Setup Bottom view Logs # 2 Install the Log Assembly Log Assembly LOGS-6C6000C, 6000C-IPI LOG Contacts Grate Tines 8000C-IPILP, 8000CBV-IPI Install the Log Assembly Log Assembly LOGS-8CHorizontal Grate BAR Air Shutter Setting Install Trim and/or SurroundAir Shutter Settings 6000 8000Standing Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Shorts in the wiringLocation Inches Millimeters Appliance Dimension DiagramReference Materials GAS Line Access R Left Side TOP View Front View Right View DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPBEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADDMDVP-FBHT DVP-TVHWPower Vent Inline Optional Wire HarnessPVI-SLP SLP-LPCLINK-DV30B DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPDV-46DVA-GCL DVP-2SL AdapterSLP90 SLP45SLP Pipe DVP-SLP24SLP-WT-BK SLP-TRAPDVP-2SL SLK-SNKD SLP-CCS-BKSLP-DCF-BK SLP-TVHWAt Depot Service PartsGas Fireplace DV Beginning Manufacturing Date Aug8000C, 8000C-IPI 8000C-IPI 6000C-IPI8000C Stocked6000C IPI Conversion Kits Standing Pilot Conversion KitsContact Information