Heat & Glo LifeStyle 6000C Venting, Maintenance Tasks-Qualified Service Technician, Logs, Firebox

Page 17

Venting

Frequency: Seasonally

By: Homeowner

Tools needed: Protective gloves and safety glasses.

Inspect venting and termination cap for blockage or obstruction such plants, bird nests, leaves, snow, debris, etc.

Verify termination cap clearance to subsequent construc- tion (building additions, decks, fences, or sheds). See Section 6.

Inspect for corrosion or separation.

Verify weather stripping, sealing and flashing remains intact.

Inspect draft shield to verify it is not damaged or missing.

B.Maintenance Tasks-Qualified Service Technician

The following tasks must be performed by a qualified ser- vice technician.

Gasket Seal and Glass Assembly Inspection

Frequency: Annually

By: Qualified Service Technician

Tools needed: Protective gloves, drop cloth and a stable work surface.

Inspect gasket seal and its condition.

Inspect fixed glass assembly for scratches and nicks that can lead to breakage when exposed to heat.

Confirm there is no damage to glass or glass frame. Replace as necessary.

Verify that fixed glass assembly is properly retained and attachment components are intact and not damaged. Replace as necessary.

Logs

Frequency: Annually

By: Qualified Service Technician

Tools needed: Protective gloves.

Inspect for damaged or missing logs. Replace as neces- sary. Refer to Section 14 for log placement instructions.

Verify correct log placement and no flame impingement causing sooting. Correct as necessary.

Firebox

Frequency: Annually

By: Qualified Service Technician

Tools needed: Protective gloves, sandpaper, steel wool, cloths, mineral spirits, primer and touch-up paint.

Inspect for paint condition, warped surfaces, corrosion or perforation. Sand and repaint as necessary.

• Replace fireplace if firebox has been perforated.

Control Compartment and Firebox Top

Frequency: Annually

By: Qualified Service Technician

Tools needed: Protective gloves, vacuum cleaner, dust cloths

Vacuum and wipe out dust, cobwebs, debris or pet hair. Use caution when cleaning these areas. Screw tips that have penetrated the sheet metal are sharp and should be avoided.

Remove all foreign objects.

Verify unobstructed air circulation.

Burner Ignition and Operation

Frequency: Annually

By: Qualified Service Technician

Tools needed: Protective gloves, vacuum cleaner, whisk broom, flashlight, voltmeter, indexed drill bit set, and a manometer.

Verify burner is properly secured and aligned with pilot or igniter.

Clean off burner top, inspect for plugged ports, corrosion or deterioration. Replace burner if necessary.

Replace Glowing embers with new dime-size pieces. DO NOT block ports or obstruct lighting paths. Refer to Section 14 for proper ember placement.

Verify batteries have been removed from battery back- up IPI systems to prevent premature battery failure or leaking.

Check for smooth lighting and ignition carryover to all ports. Verify that there is no ignition delay.

Inspect for lifting or other flame problems.

Verify air shutter setting is correct. See Section 14 for required air shutter setting. Verify air shutter is clear of dust and debris.

Inspect orifice for soot, dirt and corrosion. Verify orifice size is correct. See Service Parts List for proper orifice sizing.

Verify manifold and inlet pressures. Adjust regulator as required.

Inspect pilot flame pattern and strength. See Figures 3.1 and 3.2 for proper pilot flame pattern. Clean or replace orifice spud as necessary.

Inspect thermocouple/thermopile or IPI flame sensing rod for soot, corrosion and deterioration. Polish with fine steel wool or replace as required.

Verify thermocouple/thermopile millivolt output. Replace pilot as necessary. (Standing pilot only)

Verify that there is not a short in flame sense circuit by checking continuity between pilot hood and flame sensing rod. Replace pilot as necessary. (IPI only)

Heat & Glo • 6000C, 6000C-IPI, 8000C, 8000C-IPI2164-900 Rev. T • 9/12

17

Image 17
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyBTU Specifications Tempered Glass SpecificationsHigh Altitude Installations Listing and Code ApprovalsCombustible Materials Specification Non-Combustible Materials SpecificationElectrical Codes C22.1Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceModule Reset IPI Battery Tray/Battery InstallationNine Hour Safety Shutdown Feature Control Module OperationFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveLighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsBase Refractory Refractory, Grate and Valve Assembly RemovalNotch Location Burner Identification/VerificationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and Clearances6000 8000Clearances Constructing the Appliance Chase6000 8000Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination Locations= 9 inches U.S.A Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsOne Elbow Vent Diagrams Top Vent Horizontal TerminationVent pipe, if desired 6000C-IPI 8000C-IPI V1 Minimum H1 MaximumThree Elbows Top Vent Horizontal Termination Two Elbows6000C-IPI V1 Minimum H1 + H2 Maximum 8000C-IPI V1 Minimum H1 + H2 MaximumBreak Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Minimum + H Maximum Rear Vent Vertical Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 + H3 Maximum 10 ft Rear Vent Vertical Termination Three ElbowsCoaxial to Colinear Venting Prior to installing the gas applianceClearances to Combustibles Termination Cap Flue DamperRear Vent Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-ZoneGas Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentHeader Installing the Non-combustible BoardSecuring and Leveling the Appliance Attach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Roof Pitch Min. Ft Install Metal Roof FlashingAssemble and Install Storm Collar Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeFuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire Plus Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsTo Junction Wall Switch Installation for Fan Optional Electrical Service and Repair Junction Box InstallationFacing Material FinishingDoor FIT Finish Material See Thickness DoorsFinishing Material Inch Thick or Less Models Finishing Material Thickness 1-4 inches maximumFinishing Material Thickness 0-4 inches maximum Finishing Strips Removed Removal of Finishing StripsElevated Hearth Systems Appliance Setup Bottom view Logs # 2 Install the Log Assembly Log Assembly LOGS-6C6000C, 6000C-IPI LOG Contacts Grate Tines 8000C-IPILP, 8000CBV-IPI Install the Log Assembly Log Assembly LOGS-8CHorizontal Grate BAR Air Shutter Setting Install Trim and/or SurroundAir Shutter Settings 6000 8000Standing Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Shorts in the wiringLocation Inches Millimeters Appliance Dimension DiagramReference Materials GAS Line Access R Left Side TOP View Front View Right View DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPBEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADDMDVP-FBHT DVP-TVHWPower Vent Inline Optional Wire HarnessPVI-SLP SLP-LPCLINK-DV30B DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPDV-46DVA-GCL DVP-2SL AdapterSLP90 SLP45SLP Pipe DVP-SLP24SLP-WT-BK SLP-TRAPDVP-2SL SLK-SNKD SLP-CCS-BKSLP-DCF-BK SLP-TVHWAt Depot Service PartsGas Fireplace DV Beginning Manufacturing Date Aug8000C, 8000C-IPI 8000C-IPI 6000C-IPI8000C Stocked6000C IPI Conversion Kits Standing Pilot Conversion KitsContact Information