Heat & Glo LifeStyle 6000C manual Installing the Non-combustible Board, Header

Page 44

Figure 9.11 Attach the first vent section (it will snap into place). Slide the insulation gasket onto the vent section, up against the appliance and over the tabs.

C. Installing the Non-combustible Board

The factory supplied non-combustible board spans the dis- tance from the top of the fireplace to the center of the framing header. This board must be used. See Figure 9.12.

HEADER

Figure 9.12 Non-combustible Board

D. Securing and Leveling the Appliance

WARNING! Risk of Fire! Prevent contact with:

Sagging or loose insulation

Insulation backing or plastic

Framing and other combustible materials

Block openings into the chase to prevent entry of blown- in insulation. Make sure insulation and other materials are secured.

DO NOT notch the framing around the appliance standoffs.

Failure to maintain air space clearance may cause overheating and fire.

The diagram shows how to properly position and secure the appliance (see Figure 9.15). Nailing tabs are provided to secure the appliance to the framing members.

Bend out nailing tabs on each side.

Place the appliance into position.

Keep nailing tabs flush with the framing.

Level the appliance from side to side and front to back.

“Square” the unit by securing diagonal dimensions to within 1/4 inch of each other. See Figure 9.13.

Shim the appliance as necessary. It is acceptable to use wood shims underneath the appliance.

Secure the appliance to the framing by using nails or screws through the nailing tabs.

Secure the appliance to the floor by inserting two screws through the pilot holes at the bottom of the appliance.

A B

Note: Diagonal dimensions (A) and (B) must be within 1/4 inch of each other.

Figure 9.13 Positioning the Appliance Squarely

NAILING TABS

(BOTH SIDES)

PILOT HOLES

Figure 9.14 Proper Positioning and Securing of an Appliance

44

Heat & Glo • 6000C, 6000C-IPI, 8000C, 8000C-IPI2164-900 Rev. T • 9/12

Image 44
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsTempered Glass Specifications BTU SpecificationsHigh Altitude Installations Listing and Code ApprovalsNon-Combustible Materials Specification Combustible Materials SpecificationElectrical Codes C22.1Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveFor Your Safety Read Before Lighting Lighting Instructions Lighting Instructions Standing PilotAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsRefractory, Grate and Valve Assembly Removal Base RefractoryBurner Identification/Verification Notch LocationGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance Location6000 8000Constructing the Appliance Chase Clearances6000 8000Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications = 9 inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One ElbowVent pipe, if desired 6000C-IPI 8000C-IPI V1 Minimum H1 MaximumTop Vent Horizontal Termination Two Elbows Three Elbows6000C-IPI V1 Minimum H1 + H2 Maximum 8000C-IPI V1 Minimum H1 + H2 MaximumBreak Top Vent Vertical Termination Maximum + V 2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Minimum + H Maximum Rear Vent Vertical Termination One ElbowV1 Minimum H1 Maximum Rear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3 Maximum 10 ftPrior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperRear Vent Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-ZoneGas KitFlat Ceiling Installation Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outHeader Installing the Non-combustible BoardSecuring and Leveling the Appliance Installing Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Roof Pitch Min. Ft Install Metal Roof FlashingAssemble and Install Storm Collar Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringStanding Pilot Ignition System Wiring Optional Accessories RequirementsTo Junction Electrical Service and Repair Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialDoor FIT Finish Material See Thickness DoorsFinishing Material Inch Thick or Less Models Finishing Material Thickness 1-4 inches maximumFinishing Material Thickness 0-4 inches maximum Removal of Finishing Strips Finishing Strips RemovedElevated Hearth Systems Appliance Setup Bottom view Logs # 2 Install the Log Assembly Log Assembly LOGS-6C6000C, 6000C-IPI LOG Contacts Grate Tines Install the Log Assembly Log Assembly LOGS-8C 8000C-IPILP, 8000CBV-IPIHorizontal Grate BAR Install Trim and/or Surround Air Shutter SettingAir Shutter Settings 6000 8000Standing Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Troubleshooting Symptom Possible Cause Corrective ActionShorts in the wiring IntelliFire Plus Ignition SystemLocation Inches Millimeters Appliance Dimension DiagramReference Materials GAS Line Access R Left Side TOP View Front View Right View Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDMDVP-TVHW DVP-FBHTOptional Wire Harness Power Vent InlinePVI-SLP SLP-LPCDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP LINK-DV30BDV-46DVA-GCL DVP-2SL AdapterSLP45 SLP90SLP Pipe DVP-SLP24SLP-WT-BK SLP-TRAPDVP-2SL SLP-CCS-BK SLK-SNKDSLP-DCF-BK SLP-TVHWService Parts At DepotGas Fireplace DV Beginning Manufacturing Date Aug8000C, 8000C-IPI 6000C-IPI 8000C-IPI8000C Stocked6000C Standing Pilot Conversion Kits IPI Conversion KitsContact Information