Heat & Glo LifeStyle 6000C manual Slp-Trap, DVP-2SL, Slp-Wt-Bk

Page 79

B. Vent Components Diagrams (continued)

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

8 in. (203 mm)

Heat

Shield

15-1/8 in.

(384 mm)

 

Max

12 in.

Effective

(305 mm)

Length

SLP-TRAP

Horizontal Termination Cap

Term Cap

Minimum

Maximum

Effective Length

Effective Length

 

Trap1

3-1/8 in.

4-3/4 in.

79 mm

121 mm

 

Trap2

5-1/4 in.

9-1/4 in.

133 mm

235 mm

 

6-3/8 in.

4-3/16 in.

163 mm

106 mm

4 in.

4-5/8 in.

102 mm

117 mm

8-1/8 in.

5-1/16 in.

206 mm

128 mm

DVP-2SL

Adapter

26in.

660mm

DVP-HSM-B

Extended Heat Shield

14-7/16 in.

367 mm

14-7/16 in.

 

 

 

 

 

 

 

 

 

 

2-5/16 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

59 mm

 

367 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLP-WT-BK

Wall Thimble-Black

Figure 16.9 SLP Series Vent Components

Heat & Glo • 6000C, 6000C-IPI, 8000C, 8000C-IPI2164-900 Rev. T • 9/12

79

Image 79
Contents HOT Surfaces What to do if you smell gasHot glass will cause burns Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Tempered Glass SpecificationsBTU Specifications High Altitude InstallationsC22.1 Non-Combustible Materials SpecificationCombustible Materials Specification Electrical CodesRequirements for the Commonwealth of Massachusetts Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalControl Module Operation IPI Battery Tray/Battery InstallationModule Reset Nine Hour Safety Shutdown FeatureGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASLighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingBase Refractory Refractory, Grate and Valve Assembly RemovalNotch Location Burner Identification/VerificationTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and Components8000 Framing and ClearancesSelecting Appliance Location 60008000 Constructing the Appliance ChaseClearances 6000Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination Locations= 9 inches U.S.A Covered Alcove ApplicationsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table Key6000C-IPI 8000C-IPI V1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationOne Elbow Vent pipe, if desired8000C-IPI V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsThree Elbows 6000C-IPI V1 Minimum H1 + H2 MaximumBreak Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage H1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max V1 Minimum H1 Maximum Rear Vent Vertical Termination One ElbowMinimum + H Maximum V1 Minimum H1 + H2 + H3 Maximum 10 ft Rear Vent Vertical Termination Three ElbowsTermination Cap Flue Damper Prior to installing the gas applianceCoaxial to Colinear Venting Clearances to CombustiblesConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Connecting the DV-46DVA-GCL Adapter to Appliance Top VentRear Vent Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-ZoneGas Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardHeader Assemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingRoof Pitch Min. Ft Install Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeGas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Standing Pilot Ignition System WiringTo Junction Wall Switch Installation for Fan Optional Electrical Service and Repair Junction Box InstallationFacing Material FinishingFinishing Material Inch Thick or Less DoorsDoor FIT Finish Material See Thickness Finishing Material Thickness 0-4 inches maximum Finishing Material Thickness 1-4 inches maximumModels Finishing Strips Removed Removal of Finishing StripsElevated Hearth Systems Appliance Setup 6000C, 6000C-IPI Install the Log Assembly Log Assembly LOGS-6CBottom view Logs # 2 LOG Contacts Grate Tines 8000C-IPILP, 8000CBV-IPI Install the Log Assembly Log Assembly LOGS-8CHorizontal Grate BAR 6000 8000 Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsSymptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Shorts in the wiringReference Materials Appliance Dimension DiagramLocation Inches Millimeters GAS Line Access R Left Side TOP View Front View Right View DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPCOOL-ADDM RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-FBHT DVP-TVHWSLP-LPC Optional Wire HarnessPower Vent Inline PVI-SLPDVP-2SL Adapter DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPLINK-DV30B DV-46DVA-GCLDVP-SLP24 SLP45SLP90 SLP PipeDVP-2SL SLP-TRAPSLP-WT-BK SLP-TVHW SLP-CCS-BKSLK-SNKD SLP-DCF-BKBeginning Manufacturing Date Aug Service PartsAt Depot Gas Fireplace DV8000C, 8000C-IPI 8000C-IPI 6000C-IPI6000C Stocked8000C IPI Conversion Kits Standing Pilot Conversion KitsContact Information