Heat & Glo LifeStyle 6000C Install Horizontal Termination Cap DVP and SLP Pipe, DVP-HPC1 DVP-HPC2

Page 51

L.Install Horizontal Termination Cap (DVP and SLP Pipe)

WARNING! Risk of Fire! The telescoping flue section of the termination cap MUST be used when connecting vent.

1-1/2 (38 mm) minimum overlap of flue telescoping section is required.

Failure to maintain overlap may cause overheating and fire.

Vent termination must not be recessed in the wall. Siding may be brought to the edge of the cap base.

Flash and seal as appropriate for siding material at outside edges of cap.

When installing a horizontal termination cap, follow the cap location guidelines as prescribed by current ANSI Z223.1 and CAN/CGA-B149installation codes and refer to Section 6 of this manual.

CAUTION! Risk of Burns! Local codes may require in- stallation of a cap shield to prevent anything or anyone from touching the hot cap.

NOTICE: For certain exposures which require superior resistance to wind-driven rain penetration, a flashing kit and HRC caps are available. When penetrating a brick wall, a brick extension kit is available for framing the brick.

Note: When using termination caps with factory-supplied heat shield attached, no additional wall shield firestop is required on the exterior side of a combustible wall.

HEAT SHIELD OR

HEAT SHIELD

EXTENDED

1-1/2 IN. (38 MM) MIN.

HEAT SHIELD

OVERLAP

WALL SHIELD

 

FIRESTOP

 

SLIP SECTION

 

CAN BE EXTENDED

 

INNER VENT

SHEATHING

OUTER VENT

 

INTERIOR

EXTERIOR

VENT DEPTH FROM BACK OF APPLIANCE TO

 

OUTSIDE SURFACE OF EXTERIOR WALL

 

(SEE CHART BELOW)

 

Figure 10.20 Venting through the wall

 

Cap Specification Chart

(depth without using additional pipe sections)

 

DVP-TRAPK1

DVP-TRAP1

DVP-TRAPK2

DVP-TRAP2

 

Top Vent

Rear Vent

Top Vent

Rear Vent

 

Depth

Depth

Depth

Depth

6000

2-3/4 in. to

3-1/8 in. to

5-1/8 in. to

5-1/2 in. to

4-5/8 in.

5 in.

9-1/8 in.

9-1/2 in.

Series

 

 

 

 

 

 

 

 

8000

 

 

 

 

Series

DVP-HPC1

DVP-HPC1

DVP-HPC2

DVP-HPC2

 

Top Vent

Rear Vent

Top Vent

Rear Vent

 

Depth

Depth

Depth

Depth

 

2-3/4 in. to

3-1/8 in. to

4-7/8 in. to

5-1/4 in. to

 

4-7/8 in.

5-1/4 in.

9 in.

9-3/8 in.

DVP-TRAP1 can adjust 1-1/2 in. (3-1/8 to 4-5/8 in.)

DVP-TRAP2 can adjust 4 in. (5-3/8 to 9-3/8)

DVP-HPC1 can adjust 2-1/8 in. (4-1/4 to 6-3/8)

DVP-HPC2 can adjust 4-1/8 in. (6-3/8 to 10-1/2)

Heat & Glo • 6000C, 6000C-IPI, 8000C, 8000C-IPI2164-900 Rev. T • 9/12

51

Image 51
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Tempered Glass SpecificationsBTU Specifications High Altitude InstallationsC22.1 Non-Combustible Materials SpecificationCombustible Materials Specification Electrical CodesRequirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalControl Module Operation IPI Battery Tray/Battery InstallationModule Reset Nine Hour Safety Shutdown FeatureGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASLighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingBase Refractory Refractory, Grate and Valve Assembly RemovalNotch Location Burner Identification/VerificationTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and Components8000 Framing and ClearancesSelecting Appliance Location 60008000 Constructing the Appliance ChaseClearances 6000Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination Locations= 9 inches U.S.A Covered Alcove ApplicationsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table Key6000C-IPI 8000C-IPI V1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationOne Elbow Vent pipe, if desired8000C-IPI V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsThree Elbows 6000C-IPI V1 Minimum H1 + H2 MaximumBreak Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H1 + H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Vertical Termination One Elbow V1 Minimum H1 MaximumMinimum + H Maximum V1 Minimum H1 + H2 + H3 Maximum 10 ft Rear Vent Vertical Termination Three ElbowsTermination Cap Flue Damper Prior to installing the gas applianceCoaxial to Colinear Venting Clearances to CombustiblesConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-ZoneGas Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentInstalling the Non-combustible Board Securing and Leveling the ApplianceHeader Assemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarRoof Pitch Min. Ft Install Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeGas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Standing Pilot Ignition System WiringTo Junction Wall Switch Installation for Fan Optional Electrical Service and Repair Junction Box InstallationFacing Material FinishingDoors Finishing Material Inch Thick or LessDoor FIT Finish Material See Thickness Finishing Material Thickness 1-4 inches maximum Finishing Material Thickness 0-4 inches maximumModels Finishing Strips Removed Removal of Finishing StripsElevated Hearth Systems Appliance Setup Install the Log Assembly Log Assembly LOGS-6C 6000C, 6000C-IPIBottom view Logs # 2 LOG Contacts Grate Tines 8000C-IPILP, 8000CBV-IPI Install the Log Assembly Log Assembly LOGS-8CHorizontal Grate BAR 6000 8000 Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Causes Corrective ActionStanding Pilot Ignition System Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Shorts in the wiringAppliance Dimension Diagram Reference MaterialsLocation Inches Millimeters GAS Line Access R Left Side TOP View Front View Right View DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPCOOL-ADDM RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-FBHT DVP-TVHWSLP-LPC Optional Wire HarnessPower Vent Inline PVI-SLPDVP-2SL Adapter DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPLINK-DV30B DV-46DVA-GCLDVP-SLP24 SLP45SLP90 SLP PipeSLP-TRAP DVP-2SLSLP-WT-BK SLP-TVHW SLP-CCS-BKSLK-SNKD SLP-DCF-BKBeginning Manufacturing Date Aug Service PartsAt Depot Gas Fireplace DV8000C, 8000C-IPI 8000C-IPI 6000C-IPIStocked 6000C8000C IPI Conversion Kits Standing Pilot Conversion KitsContact Information