B. Installing Vent Components

1.Attach the First Vent Component to the Starting Collars

To attach the first vent component to the starting collars of the fireplace:

Apply a 3/8 inch (9.5 mm) bead of stove cement around the 5 inch (127 mm) fireplace starting collar.

Make sure that the fireplace rope gasket supplied with the fireplace seals between the first

8-5/8 inch (219 mm) vent component and the outer fireplace wrap.

Lock the vent components into place by sliding the concentric pipe sections with four (4) equally spaced interior beads into the fireplace collar or previously installed component end with four (4) equally spaced indented sections.

When the internal beads of each 8-5/8 inch

(219 mm) outer pipe line up, rotate the pipe section clockwise about one-quarter (1/4) turn. The vent pipe is now locked together.

The first 90° elbow installed in the vent system of a rear venting fireplace MUST BE in a vertical posi- tion.

STARTING

COLLAR

STOVE

SEALANT

BEAD

FIRST

3/8 INCH (9.5 mm)

VENT

 

COMPONENT

 

1 INCH (25.4 mm)

Figure 10. Attaching the First Vent Component to the Starting Collars

WARNING

A 3/8 INCH (9.5 MM) BEAD OF STOVE CEMENT MUST BE PLACED AROUND THE 5 INCH (127 MM) FIREPLACE STARTING COLLAR BEFORE ATTACHING THE FIRST VENT COMPONENT. FAILURE TO SEAL THIS JOINT MAY CAUSE THE FIREPLACE TO OPERATE IMPROPERLY. SEE THE DIAGRAM .

12

Image 15
Contents Heat-N-Glo Fireplace Safety and Warning Information Replacement Parts Table of ContentsCodes Installation CodesHigh Altitude Installations Approvals and CodesGetting Started Diagram of the6000 Series Fireplace Installing the FireplaceStep LocatingStep Framing Fireplace Model Models26-1/4 Vent System Approvals Step Installing Vent SystemDV-90D Corner Installation Venting with One 90 Elbow Venting with Two 90 Elbows Venting with three 90 elbows Attach the First Vent Component to the Starting Collars Installing Vent ComponentsContinue Adding Vent Components Adding Venting Components Install Support BracketsInstalling Support Brackets 4. Install Firestops 12 Hole and Vent Pipe 11 Hole and New Framing Members Attic Firestop Vent TerminationRound and Trapezoid Termination Caps If Exterior Walls are Finished with Major U.S. Building Codes Minimum Height from Roof to Lowest Discharge Opening Direct Spark Ignition DSI System Step Positioning Leveling, Securing FireplaceStep Gas Control Systems Standing Pilot Ignition SystemMm hook-up at the unit Step Gas Supply LinePressure Natural Gas Propane Step Gas Pressure RequirementsRemote Wall Switch Step Wiring FireplaceFor Standing Pilot Ignition Wiring Optional AccessoriesFan Wiring Diagram For Direct Spark Ignition DSI WiringStep Finishing Direct Spark Ignition DSI Wiring DiagramStep Installing Trim Logs, Ember Material Installing the TrimHearth Extensions Positioning the Logs Save the log instructions with this manualPlacing the Ember Material Glass Assembly Double-check for gas leaks Step Before Lighting Fireplace After InstallationReview safety warnings and cautions Double-check for faulty componentsMaintaining and Servicing Your Fireplace Fireplace MaintenanceBurner Flame Patterns Standing Pilot Only Replacement Parts AccessoriesDSI Ignition Only Both Standing Pilot and DSI Ignition 20 X6000XLS 20 X Models Mesh