Heat & Glo LifeStyle 6000 XLS, 6000 GDVFL manual Major U.S. Building Codes

Page 23

For Vertical Terminations - To locate the vent and install the vent sections:

 

Locate and mark the vent centerpoint on the under-

 

 

side of the roof, and drive a nail through the

 

 

centerpoint.

 

• Make the outline of the roof hole around the

 

 

centerpoint nail.

 

The size of the roof hole framing dimensions

 

 

depend on the pitch of the roof. There MUST BE a

 

 

1-inch (25.4 mm) clearance from the vertical vent

 

 

pipe to combustible materials.

 

• Mark the roof hole accordingly.

 

Cover the opening of the installed vent pipes.

 

Cut and frame the roof hole.

 

Use framing lumber the same size as the roof

 

 

rafters and install the frame securely. Flashing

 

 

anchored to the frame must withstand heavy winds.

 

Continue to install concentric vent sections up

 

 

through the roof hole (for inside vent installations) or

 

 

up past the roof line until you reach the appropriate

 

 

distance above the roof (for outside terminations).

 

 

 

 

 

WARNING

 

 

MAJOR U.S. BUILDING CODES

 

 

SPECIFY MINIMUM CHIMNEYAND/OR

 

 

VENT HEIGHT ABOVE THE ROOF TOP.

 

 

THESE MINIMUM HEIGHTS ARE

 

 

NECESSARY IN THE INTEREST OF

 

 

SAFETY. SEE THE FOLLOWING

 

 

DIAGRAM FOR MINIMUM HEIGHTS,

 

 

PROVIDED THE TERMINATION CAP IS

 

 

AT LEAST TWO (2) FEET FROM A

 

 

VERTICAL WALLAND 2-FEET BELOWA

 

 

HORIZONTAL OVERHANG.

NOTE

This also pertains to vertical vent systems installed

 

on the outside of the building.

20

Image 23
Contents Heat-N-Glo Fireplace Safety and Warning Information Replacement Parts Table of ContentsCodes Installation CodesHigh Altitude Installations Approvals and CodesGetting Started Diagram of the6000 Series Fireplace Installing the FireplaceStep Locating26-1/4 Step Framing FireplaceModel Models Vent System Approvals Step Installing Vent SystemDV-90D Corner Installation Venting with One 90 Elbow Venting with Two 90 Elbows Venting with three 90 elbows Attach the First Vent Component to the Starting Collars Installing Vent ComponentsContinue Adding Vent Components Adding Venting Components Install Support BracketsInstalling Support Brackets 4. Install Firestops 12 Hole and Vent Pipe 11 Hole and New Framing Members Attic Firestop Vent TerminationRound and Trapezoid Termination Caps If Exterior Walls are Finished with Major U.S. Building Codes Minimum Height from Roof to Lowest Discharge Opening Direct Spark Ignition DSI System Step Positioning Leveling, Securing FireplaceStep Gas Control Systems Standing Pilot Ignition SystemMm hook-up at the unit Step Gas Supply LinePressure Natural Gas Propane Step Gas Pressure RequirementsRemote Wall Switch Step Wiring FireplaceFor Standing Pilot Ignition Wiring Optional AccessoriesFan Wiring Diagram For Direct Spark Ignition DSI WiringStep Finishing Direct Spark Ignition DSI Wiring DiagramHearth Extensions Step Installing Trim Logs, Ember MaterialInstalling the Trim Placing the Ember Material Positioning the LogsSave the log instructions with this manual Glass Assembly Double-check for gas leaks Step Before Lighting Fireplace After InstallationReview safety warnings and cautions Double-check for faulty componentsMaintaining and Servicing Your Fireplace Fireplace MaintenanceBurner Flame Patterns Standing Pilot Only Replacement Parts AccessoriesDSI Ignition Only 6000XLS 20 X Both Standing Pilot and DSI Ignition20 X Models Mesh