Heat & Glo LifeStyle Essential Guide to 050-721 Dumps and Proper Log Positioning Techniques

Page 32

29

Positioning the Logs

If the gas logs have been factory installed they should not need to be positioned.

If the logs have been packaged separately, refer to the installation instructions that accompany the logs.

Save the log instructions with this manual.

If sooting occurs, the logs might need to be repositioned slightly to avoid excessive flame impingement.

Placing the Ember Material

Two separate bags of ember material are shipped with this gas fireplace:

The bag labeled Golden Ember (GE-93) is flame colorant material.

The bag labeled Glowing Ember (050-721) is standard glowing ember material.

To place the ember material:

Remove the wing nuts and glass clips or tension springs around the glass door.

Remove the glass door from the unit.

Cover the top of the burner with a single layer of ember material. Then sprinkle GE-93 on top of the burner.

Save the remaining ember materials for use during fireplace servicing.

Replace the glass door and a front trim door on the unit (see Replacement Parts Section of the manual.)

Replace the wing nut, glass clips, and tension springs.

Hand tighten the wing nuts.

Image 32
Contents Heat-N-Glo Fireplace Safety and Warning Information Table of Contents Replacement PartsInstallation Codes High Altitude InstallationsApprovals and Codes CodesGetting Started Diagram of the6000 Series Installing the Fireplace StepLocating Fireplace26-1/4 Step Framing FireplaceModel Models Step Installing Vent System Vent System ApprovalsDV-90D Corner Installation Venting with One 90 Elbow Venting with Two 90 Elbows Venting with three 90 elbows Installing Vent Components Attach the First Vent Component to the Starting CollarsAdding Venting Components Install Support Brackets Continue Adding Vent ComponentsInstalling Support Brackets 4. Install Firestops 12 Hole and Vent Pipe 11 Hole and New Framing Members Vent Termination Attic FirestopRound and Trapezoid Termination Caps If Exterior Walls are Finished with Major U.S. Building Codes Minimum Height from Roof to Lowest Discharge Opening Step Positioning Leveling, Securing Fireplace Step Gas Control SystemsStanding Pilot Ignition System Direct Spark Ignition DSI SystemStep Gas Supply Line Mm hook-up at the unitStep Gas Pressure Requirements Pressure Natural Gas PropaneStep Wiring Fireplace For Standing Pilot Ignition WiringOptional Accessories Remote Wall SwitchFor Direct Spark Ignition DSI Wiring Fan Wiring DiagramDirect Spark Ignition DSI Wiring Diagram Step FinishingHearth Extensions Step Installing Trim Logs, Ember MaterialInstalling the Trim Placing the Ember Material Positioning the LogsSave the log instructions with this manual Glass Assembly Step Before Lighting Fireplace After Installation Review safety warnings and cautionsDouble-check for faulty components Double-check for gas leaksFireplace Maintenance Maintaining and Servicing Your FireplaceBurner Flame Patterns Replacement Parts Accessories Standing Pilot OnlyDSI Ignition Only 6000XLS 20 X Both Standing Pilot and DSI Ignition20 X Models Mesh