Enviro C-10381, C-11290 51mm at top, 1½ 38mm at sides, 1½ 38mm at Bottom, Twist-Lock Connection

Page 20

Initial Installation

QUALIFIED INSTALLERS ONLY

Horizontal Installation:

1.Set the appliance in the desired location. Check to determine if wall studs or roof rafters are in the way when the venting system is attached. If this is the case, you may want to adjust the location of

the appliance.

2.Direct vent pipe and fittings are designed with special twist-lock connections. Assemble the desired combination of black pipe and elbows to the appliance adapter with pipe seams oriented towards the wall or floor, as much out of view as possible.

Place a bead of Mil-Pac on the outer edge of the inner exhaust pipe (non-flared end). Place a bead of high temperature silicone on the male edge of the outer pipe. Push the pipe sections completely together, then twist-lock one section clockwise approximately ¼ turn, until the two sections are fully locked. The female locking lugs will not be visible from the outside, on black pipe. They may be located by examining the inside of the female ends as shown in Figure 25.

Female

Locking

Lugs

Sealant

Male

Locking

Lugs

Figure 25: Twist-Lock Connection

Notes:

 

 

 

 

 

 

 

(a) Twist-lock procedure: four (4) indentations, located on the female

10"

end of the pipes and fittings, are designed to slide straight onto the

(254mm)

male ends of adjacent pipes and fittings, by orienting the four pipe

 

indentations so they match and slide into the four entry slots on the

10"

male end.

 

 

 

 

 

 

 

 

 

 

 

 

(254mm)

(b) Horizontal runs of vent pipe must be supported every 36” (915mm).

 

Wall straps are available for this purpose, also when running horizontal

 

pipe

minimum

clearances

to

combustibles

must

be

maintained;

 

2” (51mm) at top, 1½” (38mm) at sides, 1½” (38mm) at

 

bottom.

 

 

 

 

 

 

 

3. With the pipe attached to the stove in the correct location, mark the

 

wall for a 10” (25.4cm) x 10” (25.4 cm) square hole (refer to Figure

 

26). The center of the square hole should match the center line of

Figure 26: Wall Framing Hole for

the horizontal pipe. Cut and frame the 10” (25.4cm) x 10” (25.4cm)

hole in the exterior wall where the vent will be terminated. Refer to

Horizontal Installation.

 

Figure 18. If the wall being

11/4"

 

 

 

 

penetrated is constructed of

 

 

 

 

non-combustible material i.e.

(3.2cm)

 

 

 

 

 

 

 

 

 

masonry or concrete, a 7”

Fold strap

 

 

 

Woodscrews

(17.8cm) hole is acceptable.

here

 

 

 

 

4. Position the horizontal vent

 

termination

in

the

center

Sheet metal

of

the

10”

(25.4cm)

x

10”

screws

(25.4cm)

hole,

and

attach

 

to

the

 

exterior

 

wall

with

 

the

four

screws

provided.

Wall Thimble

Before

attaching

the

 

vent

 

Strap

termination

to the exterior

Figure 27: Installing Decorative Wall Thimble.

 

 

 

 

 

 

 

 

 

20

Image 20
Contents Installer ConsumerSafety Precautions GeneralTable of Contents Rear Vent DV Codes And ApprovalsTOP Vent DV Specifications Westport Exterior DimensionsOperatingInstructions MAYOperating Instructions Pilot FlameComponent Sound & Reason Maintenance And Service Electronic Ignition Module LocationTo Replace Handles for Removing DoorKit Parts List Conversion Kit InstallationRemove the black protection cap from Initial Installation Qualified Installers onlyRound Support Vent Termination Restrictions Installation Instructions KIT ComponentsInstallation of Fireplace Horizontal Vent Kit Manufacturer Trade Name Nominal Sizes4DSC Shows the vent restrictor position required, relative to 51mm at top, 1½ 38mm at sides, 1½ 38mm at Bottom Twist-Lock ConnectionTermination Pipe and elbows may be utilized in the attic, as Over 18/12 to 20/12 Over 20/12 to 21/12 Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls 33a-2002 Test Methods and the Resulting ITS Firebox Top Corner Installation Installation for Top Vented Horizontal TerminationInstallation Wiring DiagramCanadian Installations A. InstallationsVenting of a Fireplace Fitted with the Drafthood Adaptor Spillage TestOptional Finishing Automatic Safety Shut DownSpill Switch Replacement GAS Line Connection To Test Valve PressuresWire Size Max. Length Wiring Diagram For Fan ControlSecondary Installation Optional Blower Fan InstallationComplete Log Placement Log Placement with Rock Wool Brick panel bracket, slots shown Trouble Shooting Problem Possible Cause SolutionParts List Cast Reference Part Description Part NumberEGWP-505PG EGWP-501PG Parts Diagram Cast Parts List Components Parts List Components Parts Diagram Components Warranty To the DealerWarranty Installation Data Sheet