Initial Installation
QUALIFIED INSTALLERS ONLY
Vertical Installation:
1.Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air spaces with insulation.
2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, to avoid cutting load bearing members.
3.To install the Round Support Box/Wall Thimble in a flat ceiling, cut a 10” square hole in the ceiling, centered in the hole drilled in Step 2. Frame the hole as shown in Figure 30.
4. Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adapter up through the Round Support Box. Insure that all pipe and elbow connections are in their fully
5.Cut hole in the roof centered on the small hole placed in the roof from Step 2. The hole should be of sufficient size to meet minimum requirements for Clearance to Combustibles, as specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling
support box up through the roof line. Galvanized | Figure 30: Wall Framing for Hole for Vertical | ||||
pipe and elbows may be utilized in the attic, as | Installation. | ||||
well as above the roof line. The |
| Vertical | |||
galvanized finish is desirable |
| ||||
| Termination | ||||
above the roof line, due to the |
| ||||
|
| ||||
higher corrosion resistance. | Elbow Strap | Storm Collar | |||
6. Once the pipe sections have |
| Flashing | |||
been joined, and run up through |
| ||||
the hole in the roof, slip an elbow |
|
| |||
strap over the exposed sections, |
| Roofing nails | |||
bend | the | support | straps |
|
|
outwards, and push the elbow |
|
| |||
strap down to the roof level, as |
|
| |||
shown in Figure 31. Tighten the |
|
| |||
clamp around the pipe section. |
|
| |||
Use a level to make sure the |
|
| |||
pipe is | truly | vertical. | With |
|
|
roofing nails, secure the support |
|
| |||
straps to the roof. Seal the nails |
|
| |||
holes heads with | Figure 31: Vertical Vent Termination Installation. | ||||
mastic. Trim the excess length of |
22