Enviro C-10381, C-11290 owner manual Pipe and elbows may be utilized in the attic, as

Page 22

Initial Installation

QUALIFIED INSTALLERS ONLY

Vertical Installation:

1.Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air spaces with insulation.

2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, to avoid cutting load bearing members.

3.To install the Round Support Box/Wall Thimble in a flat ceiling, cut a 10” square hole in the ceiling, centered in the hole drilled in Step 2. Frame the hole as shown in Figure 30.

4. Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adapter up through the Round Support Box. Insure that all pipe and elbow connections are in their fully twist-locked position.

5.Cut hole in the roof centered on the small hole placed in the roof from Step 2. The hole should be of sufficient size to meet minimum requirements for Clearance to Combustibles, as specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling

support box up through the roof line. Galvanized

Figure 30: Wall Framing for Hole for Vertical

pipe and elbows may be utilized in the attic, as

Installation.

well as above the roof line. The

 

Vertical

galvanized finish is desirable

 

 

Termination

above the roof line, due to the

 

 

 

higher corrosion resistance.

Elbow Strap

Storm Collar

6. Once the pipe sections have

 

Flashing

been joined, and run up through

 

the hole in the roof, slip an elbow

 

 

strap over the exposed sections,

 

Roofing nails

bend

the

support

straps

 

 

outwards, and push the elbow

 

 

strap down to the roof level, as

 

 

shown in Figure 31. Tighten the

 

 

clamp around the pipe section.

 

 

Use a level to make sure the

 

 

pipe is

truly

vertical.

With

 

 

roofing nails, secure the support

 

 

straps to the roof. Seal the nails

 

 

holes heads with non-hardening

Figure 31: Vertical Vent Termination Installation.

mastic. Trim the excess length of

22

Image 22
Contents Installer ConsumerSafety Precautions GeneralTable of Contents TOP Vent DV Codes And ApprovalsRear Vent DV Specifications Westport Exterior DimensionsOperatingInstructions MAYOperating Instructions Pilot FlameComponent Sound & Reason Maintenance And Service Electronic Ignition Module LocationTo Replace Handles for Removing DoorKit Parts List Conversion Kit InstallationRemove the black protection cap from Initial Installation Qualified Installers onlyRound Support Vent Termination Restrictions Installation Instructions KIT ComponentsInstallation of Fireplace Horizontal Vent Kit Manufacturer Trade Name Nominal Sizes4DSC Shows the vent restrictor position required, relative to 51mm at top, 1½ 38mm at sides, 1½ 38mm at Bottom Twist-Lock ConnectionTermination Pipe and elbows may be utilized in the attic, as Over 18/12 to 20/12 Over 20/12 to 21/12 Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls 33a-2002 Test Methods and the Resulting ITS Firebox Top Corner Installation Installation for Top Vented Horizontal TerminationCanadian Installations InstallationWiring Diagram A. InstallationsVenting of a Fireplace Fitted with the Drafthood Adaptor Spillage TestSpill Switch Replacement Automatic Safety Shut DownOptional Finishing GAS Line Connection To Test Valve PressuresWire Size Max. Length Wiring Diagram For Fan ControlSecondary Installation Optional Blower Fan InstallationComplete Log Placement Log Placement with Rock Wool Brick panel bracket, slots shown Trouble Shooting Problem Possible Cause SolutionParts List Cast Reference Part Description Part NumberEGWP-505PG EGWP-501PG Parts Diagram Cast Parts List Components Parts List Components Parts Diagram Components Warranty To the DealerWarranty Installation Data Sheet