Enviro C-11290, C-10381 Automatic Safety Shut Down, Spill Switch Replacement, Optional Finishing

Page 31

Initial Installation

AUTOMATIC SAFETY SHUT DOWN:

If the spill switch is activated and shuts off the main burner the following procedure should be followed.

Is the pilot flame still on? If not, the reason for the fireplace shut down is not the spill switch.

Turn off the pilot flame and turn off all controls. Let fireplace to cool down.

Check for blockages or restrictions in the flue and venting components.

Restart the fireplace and check for vent draft as described earlier.

Operate the fireplace in a normal manner.

If the main burner shuts down again after a period of operation, turn off the fireplace and contact your service technician.

SPILL SWITCH REPLACEMENT:

Use the following instructions to replace the Safety Spill Switch.

1.Turn the unit off and allow it to cool.

2.Disconnect the spill switch wires from the valve and on/off/remote rocker switch wire (see Figure 45).

3.Remove the four mounting screws holding the spill switch bracket and remove the bracket (see Figure 49).

4.Remove and replace the spill switch with a 50-885 Spill Switch Assembly using a T-20 torx type driver.

5.Follow the reverse of the previous steps.

OPTIONAL FINISHING:

Figure 49: Spill switch installation.

In installations where the flue connector is running from the drafthood into a non-combustible chimney the following optional finishing technique can be used.

CAUTION: Installations where the flue connector or venting connects to, or passes through, combustible walls or ceilings, the inner vent components must be ‘B-vent’. It is not allowable in these applications to use single wall inner vent components.

For decorative purposes a 6” (15 cm) single wall black stove pipe may be installed over the 4” (10 cm) single wall or ‘B-Vent’.

Note: The use of these components is for aesthetic purposes only and does not effect the fact that the fireplace, when fitted with the Drafthood Adaptor, is a Natural Vent appliance and therefore draws air in through the Drafthood Adaptor intake ports.

31

Image 31
Contents Consumer InstallerGeneral Safety PrecautionsTable of Contents TOP Vent DV Codes And ApprovalsRear Vent DV Westport Exterior Dimensions SpecificationsMAY OperatingInstructionsPilot Flame Operating InstructionsComponent Sound & Reason Electronic Ignition Module Location Maintenance And ServiceHandles for Removing Door To ReplaceConversion Kit Installation Kit Parts ListRemove the black protection cap from Qualified Installers only Initial InstallationRound Support Vent Termination Restrictions KIT Components Installation InstructionsManufacturer Trade Name Nominal Sizes Installation of Fireplace Horizontal Vent Kit4DSC Shows the vent restrictor position required, relative to Twist-Lock Connection 51mm at top, 1½ 38mm at sides, 1½ 38mm at BottomTermination Pipe and elbows may be utilized in the attic, as Over 18/12 to 20/12 Over 20/12 to 21/12 Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls 33a-2002 Test Methods and the Resulting ITS Firebox Top Installation for Top Vented Horizontal Termination Corner InstallationA. Installations InstallationWiring Diagram Canadian InstallationsSpillage Test Venting of a Fireplace Fitted with the Drafthood AdaptorSpill Switch Replacement Automatic Safety Shut DownOptional Finishing To Test Valve Pressures GAS Line ConnectionWiring Diagram For Fan Control Wire Size Max. LengthOptional Blower Fan Installation Secondary InstallationComplete Log Placement Log Placement with Rock Wool Brick panel bracket, slots shown Problem Possible Cause Solution Trouble ShootingReference Part Description Part Number Parts List CastEGWP-505PG EGWP-501PG Parts Diagram Cast Parts List Components Parts List Components Parts Diagram Components To the Dealer WarrantyWarranty Installation Data Sheet