Enviro C-10381, C-11290 owner manual Follow installation steps 1 & 2 under Initial

Page 24

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 34: Multi-Story Vent Pipe Installation.

Figure 33: Use of Wall Straps.

Cathedral Ceiling Installation:

1.Follow installation steps 1 & 2 under Initial

Installation - Vertical Installation.

2.Using the plumb bob, mark the centerline of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the “Cathedral Ceiling Support Box”.

3.Remove shingles or other roof coverings as necessary to cut the rectangular hole for the “Support Box”. Cut the hole ⅛” larger than the “Support Box” outline.

4.Lower the “Support Box” through the hole in the roof until the bottom of the “Support Box” protrudes at least 2 inches (5 cm) below the ceiling. Align the “Support Box” both vertically and horizontally with a level as shown in Figure 35. Temporarily tack the “Support Box” in the place through the inside walls and into the roof sheathing.

Figure 35: Cathedral Ceiling Support Box Leveling.

24

Image 24
Contents Installer ConsumerSafety Precautions GeneralTable of Contents Codes And Approvals TOP Vent DVRear Vent DV Specifications Westport Exterior DimensionsOperatingInstructions MAYOperating Instructions Pilot FlameComponent Sound & Reason Maintenance And Service Electronic Ignition Module LocationTo Replace Handles for Removing DoorKit Parts List Conversion Kit InstallationRemove the black protection cap from Initial Installation Qualified Installers onlyRound Support Vent Termination Restrictions Installation Instructions KIT ComponentsInstallation of Fireplace Horizontal Vent Kit Manufacturer Trade Name Nominal Sizes4DSC Shows the vent restrictor position required, relative to 51mm at top, 1½ 38mm at sides, 1½ 38mm at Bottom Twist-Lock ConnectionTermination Pipe and elbows may be utilized in the attic, as Over 18/12 to 20/12 Over 20/12 to 21/12 Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls 33a-2002 Test Methods and the Resulting ITS Firebox Top Corner Installation Installation for Top Vented Horizontal TerminationInstallation Wiring DiagramCanadian Installations A. InstallationsVenting of a Fireplace Fitted with the Drafthood Adaptor Spillage TestAutomatic Safety Shut Down Spill Switch ReplacementOptional Finishing GAS Line Connection To Test Valve PressuresWire Size Max. Length Wiring Diagram For Fan ControlSecondary Installation Optional Blower Fan InstallationComplete Log Placement Log Placement with Rock Wool Brick panel bracket, slots shown Trouble Shooting Problem Possible Cause SolutionParts List Cast Reference Part Description Part NumberEGWP-505PG EGWP-501PG Parts Diagram Cast Parts List Components Parts List Components Parts Diagram Components Warranty To the DealerWarranty Installation Data Sheet