Waterford Appliances T25-NG, T25-LP installation manual Installation

Page 8

INSTALLATION

9)Connect the red wire from the thermodisc to the red wire of the speed control wire harness.

10)Connect the live black wire from power cord to the black wire of the speed control wire harness.

11)Slide the thermodisc into the bracket clip on the underside of the firebox.

NOTE: Pull excess wire next to fan to avoid excessive heat from the firebox.

12) Ensure all wires are pulled away from firebox to avoid excessive heat and secure with stick-on wire clip.

13) Re-attach rear access panel with 6 screws, reversing step 7.

NOTE: When power cord is plugged in, speed control is in the ON position and stove is burning, allow 10 - 15 minutes for the thermodisc (temperature switch) to activate and turn on the Fan automatically.

WARNING: Electrical Grounding Instructions

This appliance is equipped with a three pronged (grounding) plug for your protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug.

8

Waterford TARA T25 Direct Vent Freestanding Gas Stove

Image 8
Contents Tara Direct Vent Freestanding Gas Stove Waterford To the New OwnerTable of Contents Safety Label Copy of Safety Label for Tara T25 Gas Stove Installation Specifications Save These Instructions Information for Mobile Manufactured Homes After First SaleGeneral Safety Information Installation ChecklistManufactured Mobile Home Additional Requirements Clearances to CombustiblesTara Clearances Optional FAN InstallationLocating Your GAS Stove Installation Combustion and Ventilation AIR Exterior Vent Terminal Planning Your venting Installation For your particular installationMinimum components for a Horizontal Installation Quired. Other parts may be requiredSnorkel Terminations Horizontal InstallationsBelow Grade Snorkel Installation Alternate Approved Caps Vertical Termination with CO-LINEAR Flex SystemDescription DV Stove Horizontal Vent KIT Qty. DescriptionPlanning Your Dura-Vent Installation DURA-VENT Termination KITRigid Pipe Venting Components Alternate Horizontal Termination CapsRigid Pipe Venting Components List 4DT-AJBFor both Residential & Manufactured Homes/Mobile Homes Rigid Pipe Venting Horizontal TerminationsRigid Pipe Venting Vertical Terminations DURA-VENT Horizontal Installations Vent RestrictorTermination Offset Chart Cathedral CeilingsSupport Extensions Round Rdse or Square Sqse Round Support RDS Square Support SQSConverting a Masonry Chimney Converting a Factory Built Metal ChimneyHigh Elevation System Data Tara T25GAS Pipe Pressure Testing GAS ConnectionConversion KIT From Natural GAS To Propane Valve DescriptionReplace yellow Natural Gas label with red Propane label Aeration Adjustment Removing Cast Iron Front PanelOptional Front Grill Securing Cast Iron Front PanelOptional Wall Thermostat LOG InstallationOptional Side Shelf Optional Remote Control Wiring Diagram TaraThermostat Wire Table Final CheckOperating Instructions Sounds Maintenance Maintenance InstructionsGeneral Vent Maintenance LOG ReplacementGlass Replacement FAN MaintenanceValve Maintenance Installing Valve AssemblyParts List Replacement / Spare Parts ListPage Warranty ConditionsRegister your Waterford online at